I-90 - Snoqualmie Summit to Hyak WB - Dowel Bar Retrofit/Concrete Rehab - Complete November 2009

Project Status - Complete

View larger map

Snoqualmie Summit to Hyak Project
Drivers now experience a smoother driving surface.

Overview
This project strengthened and extended the service life of the pavement in the westbound lanes of I-90 just east of Snoqualmie Summit by installing steel dowel bars in the wheel paths between panels for the right lanes. Crews replaced severely cracked panels and grinded the roadway surface to improve the ride and extend the pavement life. The project also restored signing, striping and other basic safety features.

How You Benefit
Cross GlyphImproves Safety
This project rehabilitated the roadway surface to provide a smoother ride.
Dollar Sign Glyph Economic Incentive
This project supported an estimated 50 jobs, which includes jobs on the project, jobs producing materials for the project, and other jobs in the local community.

Partnerships & Cooperation
This project was constructed on existing WSDOT right-of-way, there for partnerships weren't necessary.

Funding

This project is funded through the following sources:

Federal funding
2009 American Recovery and Reinvestment Act - $3.6 million
State funding
Existing funds - $0.3 million
Total funding available from all sources - $3.9 million