Overview
WSDOT rehabilitated the pavement between mileposts 60.22 and 64.22 on westbound I-90 just east of the snowshed by replacing sections of badly deteriorated, cracked, and damaged concrete pavement, and paving over the existing concrete pavement with asphalt.
 | Improves Safety
This project provides a smoother, safer driving surface for drivers. Crews also updated safety features such as guardrails, signing, and striping.
|
Partnerships & Cooperation
This project was constructed on existing WSDOT right-of-way; therefore, no partnerships were necessary.
Funding
This project was funded through the following source:
Existing funds: $1.98 million