I-90 - Grant County Line to SR 21

Status

March 2014

  • Weekly Construction Update
  • Awarded to Central Washington Asphalt with a construction bid of $4,815,095.
  • Construction schedule depends on weather.

Interstate 90 will be resurfaced with hot mix asphalt.

Why is WSDOT resurfacing this highway?
This project preserves the roadway by milling (grinding down) and repaving US 2.

The End Result
Upgrades the structural integrity and extends the life of the roadway.

Project Benefits
Paving upgrades the structural integrity and extends the roadway life.

What is the project timeline?
Work on the project should start and be completed in the 2014 construction season.

Financial Information

Project signage will reflect the cost of construction engineering, project bid award and sales tax.

How can I get more information?
Contact:
Darrel McCallum, Project Engineer
2714 N. Mayfair
Spokane, WA 99207
509-323-8410