Overview
We improved safety at two key locations on SR 525 in Mukilteo and SR 528 in Marysville. In Mukilteo, we added a bicycle path across the northbound SR 525 exit to Paine Field Boulevard that connects to the existing bicycle path on the north side of the road. In Marysville, we built a new sidewalk on the ramp from SR 528 to southbound I-5 and improved sidewalk ramps near the bus shelter.
 | Improves Safety
Providing better access for pedestrians and cyclists improves safety for everyone who uses these roadways.
|
Partnerships & Cooperation
Funding
| Financial Data for PIN 100551A, 152510E |
| Funding Source |
Amount ($ in thousands) |
| 2003 Gas Tax (Nickel Funding) |
$0 |
| 2005 Gas Tax (TPA) |
$0 |
| Pre-Existing Funds (PEF) |
$714 |
| Total |
$714 |
|
The total funding available for this project from all sources was $500,000.
- Pre-existing funds - $500,000
Contact Us
Cathy Arnold
WSDOT Project Engineer
425-225-8799
arnoldc@wsdot.wa.gov
Bronlea Mishler
WSDOT Communications
Phone: 206-440-4696