I-182 - US 395 Interchange - Complete September 2003

Overview
WSDOT added a ten foot wide recovery area beyond the outside shoulder, to provide a drivable surface for a vehicle to regain control before encountering the steeper slope past the shoulder.

The new interchange was completed 4 months ahead of schedule.

How You Benefit
Cross GlyphImproves Safety
The extended recovery area on the outside shoulder will provide a better surface for drivers to regain control. This will improve safety by decreasing the chance of roll over accidents.

Partnerships & Cooperation
WSDOT worked with tribal officials to identify and minimize adverse impacts to areas of cultural, archeological or anthropological significance.  This safety project did not involve any ground-disturbing activities outside the existing roadway; therefore the Section 106 process of the National Historic Preservation Act did not apply.

Funding
This project is funded through the following sources:

  • 2003 Gas Tax (Nickel Funding) - $59,000
  • Existing Funds - $10,000
  • Total Funding Available from all sources - $69,000