Overview
WSF built a right-turn lane along the south leg of the SR 525 and Front Street intersection, modified an existing lighting system, and installed a traffic/pedestrian signal system at the intersection that ties into the signal for ferry offloading.
 | Relieves Congestion
The right turn lane allows separate turning movements during loading/unloading of the ferry. The signal system coordinates pedestrian crossings and traffic movements with the traffic signal for vehicles offloading from the ferry.
|
Partnerships & Cooperation
Contractor KLB Construction completed this work.
Funding
Financial information for this project also includes the costs for another Mukilteo terminal project.
Contact Us
Joy Goldenberg
WSF Communications Manager
2901 3rd Ave., Suite 500
Seattle, WA 98121
206-515-3411
GoldenJ@wsdot.wa.gov
back to top