Overview
This Preservation Program project addressed major drainage features that needed repair or replacement to prevent potential damage to the roadway.
 | Improves Safety
This project reduces icing and water over the roadway events, that can create hazardous driving conditions.
|
 | Economic Incentive
This preventative maintenance enhances the function of existing drainage structures protecting the highway.
|
Partnerships & Cooperation
Funding
| Financial Data for PIN 201706B, 202008A, 209793A, 226203A |
| Funding Source |
Amount ($ in thousands) |
| 2003 Gas Tax (Nickel Funding) |
$0 |
| 2005 Gas Tax (TPA) |
$0 |
| Pre-Existing Funds (PEF) |
$798 |
| Total |
$798 |
|
The project was funded through the following sources:
Pre-existing gas tax - $600K
Total Funding from all sources - $600K
Contact Us
How can I get more information?
Contact:
Project Engineer, Eric Pierson
North Central Region
P.O. Box 98
Wenatchee, WA 98807
Phone: (509) 667-2870 or toll free (888) 461-8816
e mail: piersoe@wsdot.wa.gov
back to top