| | | | | Cable Median Barrier Projects 2005-2007 - Complete December 2007 | |
 | | Franklin | South Central | I-182 - US 395 Interchange - Complete September 2003 |  |
| |  | Clark | Southwest | I-205 - Mill Plain SB Off Ramp Improvements - Complete July 2006 |  |
| | | King | Urban Corridors | I-405 - Access Downtown Project - Complete December 2004 | |
| | | Snohomish | Urban Corridors | I-405 - Bothell/Canyon Park Freeway Station - Complete June 2007 | |
 | | King | Urban Corridors | I-405 - Kirkland Nickel Stage 1 - Complete November 2007 |  |
| | | King | Northwest | I-405 - SR 167 Grade Separation Ramp - Complete March 2004 | |
| | | Snohomish | Northwest | I-5 - 124th St. Bicycle/Pedestrian Overpass - Complete April 2008 | |
 | | Skagit | Northwest | I-5 - 2nd Street Bridge Replacement - Complete September 2006 |  |
 | | Snohomish | Northwest | I-5 - 52nd Ave W. to SR 526 - SB Safety - Complete October 2006 |  |
| | | Snohomish | Urban Corridors | I-5 - Ash Way Transit Direct Access - Complete September 2005 | |
 | | Clark | Southwest | I-5 - Corridor, NE 78th Street in Hazel Dell to Burnt Bridge Creek in Vancouver - Complete November 2002 | |
 | | Pierce | Olympic | I-5 - HOV Improvements - S 48th Street to Pacific Ave - Complete June 2008 |  |
 | | King | Urban Corridors | I-5 - HOV Pierce to Tukwila: Stage 4 - Complete May 2007 |  |
| | | Clark | Southwest | I-5 - I-205 to N. Fork Lewis River Bridge - Concrete Rehab - Complete October 2007 | |
| | | King | Northwest | I-5 - James to Olive Pavement Rehab - Complete October 2005 | |
| | | Whatcom | Northwest | I-5 - Lakeway Drive Interchange, Noise wall and Safety Improvements - Complete April 2005 | |
| | | Snohomish | Urban Corridors | I-5 - Lynnwood Park & Ride Access Improvement - Complete November 2004 | |
 | | King | Northwest | I-5 - NE 175th St. to NE 205th St. - NB Auxiliary Lanes - Complete June 2006 |  |
 | | Cowlitz | Southwest | I-5 - New Bridge between I-5 and SR 411 - Complete September 2007 |  |
| | | King | Northwest | I-5 - North Seattle Bridges - Seismic Retrofit - Complete March 2007 | |
| | | King | Northwest | I-5 - Ramps at Michigan, Corson and Swift-Albro - Complete June 2005 | |
| | | King | Northwest | I-5 - S 178th St Overpass Repair - Complete April 2008 | |
| | | Whatcom | Northwest | I-5 - Samish Way to Sunset Drive - Complete October 2005 | |
| |  | Snohomish | Northwest | I-5 - Smokey Point: 172nd St. NE (SR 531) Interchange Modifications & SR 531 Safety Improvements - Complete June 2006 | |
| | | King | Urban Corridors | I-5 - South 317th Street HOV Direct Access - Complete October 2006 | |
 | | Whatcom | Northwest | I-5 - Southbound Ramps at SR 11, Old Fairhaven Parkway - Complete May 2007 |  |
| |  | King | Northwest | I-5 - Spokane Street to I-90 Bridge Repair - Complete October 2007 | |
 | | Snohomish | Northwest | I-5 - SR 532 Northbound Interchange Ramps - Complete May 2007 |  |
| | | Snohomish | Northwest | I-5 - Steamboat Slough Bridges Scour Repair - Complete October 2005 | |
| | | Pierce | Olympic | I-5 - Tacoma's 38th Street Bridge and Interchange Project - Complete Fall 2001 | |
 | | Clark | Southwest | I-5 - Widen I-5 Each Direction From Salmon Creek to I-205 - Complete October 2006 |  |
| | | Spokane | Eastern | I-90 - Argonne Rd. to Sullivan Rd. Roadside Restoration - Complete February 2007 | |
 | | Spokane | Eastern | I-90 - Argonne to Sullivan - Complete June 2006 |  |
| | | Spokane | Eastern | I-90 - Downtown Spokane Viaduct Bridge Deck - Complete August 2007 | |
 | | King | Northwest | I-90 - Eastbound Ramp to SR 202 - Complete October 2007 |  |
 | | King | Northwest | I-90 - Eastbound Ramps to SR 18 - Complete November 2007 |  |
| | | King | Urban Corridors | I-90 - Eastgate Direct Access Ramps - Complete October 2006 | |
| | | Kittitas | South Central | I-90 - Franklin Falls - Emergency Rock Slide Repair - Complete October 2005 | |
 | | Spokane | Eastern | I-90 - Geiger Road to US 2 Median Barrier - Complete November 2004 |  |
| | | Grant | North Central | I-90 - George East – Paving – Complete August 2005 | |
| |  | Spokane | Eastern | I-90 - Harvard Road On Ramp (Liberty Lake) Pedestrian Overcrossing - Complete August 2007 | |
 | | Kittitas | South Central | I-90 - Highline Canal to Elk Heights - Complete August 2004 |  |
 | | Kittitas | South Central | I-90 - Increase Vertical Clearance on Cle Elum River Bridge - Complete Novermber 2004 |  |
| | | Spokane | Eastern | I-90 - Medical Lake to US 195 ITS - Complete December 2006 | |
| | | Kittitas | South Central | I-90 - Midway Curves at Easton Hill - Slope Stabilization - Complete November 2006 | |
 |  | Grant | North Central | I-90 - Replaces Potato Hill Bridge - Complete December 2006 |  |
 | | Kittitas | South Central | I-90 - Ryegrass Summit to Vantage - Complete November 2004 |  |
| | | Kittitas | South Central | I-90 - Snowshed Vicinity - Emergency Rock Slide Repair Project - Complete January 2006 | |
| | | Grant | North Central | I-90 - SR 26 Interchange - Ramp Improvements - Complete October 2005 |  |
| | | Spokane | Eastern | I-90 - Sullivan Road Interchange Intersection Rehab - Complete November 2007 | |
 | | Spokane | Eastern | I-90 - Sullivan-State Line Median Barrier - Complete September 2005 |  |
| | | King | Northwest | I-90 - Sunset Interchange - Complete August 2003 | |
 | | Kittitas | South Central | I-90 - Truck Climbing/Passing Lanes - Cle Elum to Vantage - Complete October 2004 | |
| | | King | Northwest | I-90 - West Lake Sammamish Parkway Roundabout Reconstruction - Complete December 2005 | |
| | | King | Northwest | I-90 - West Lake Sammamish Parkway to 436th St - Complete Spring 2005 | |
| | | Skagit | Rail | Rail - BNSF Skagit River Debris Management Study - Complete June 2007 |  |
| | | Skagit | Rail | Rail - Eastern Skagit Rail Study - Complete December 2006 |  |
 | | Thurston | Rail | Rail - High-speed Crossovers - Centennial - Complete June 2007 |  |
| | | Pierce | Rail | Rail - High-speed Crossovers - Titlow - Complete June 2005 |  |
 | | Lewis | Rail | Rail - High-Speed Crossovers - Winlock - Complete June 2007 |  |
| | | Lewis | Rail | Rail - Industrial Spur Track to Winlock Glass Manufacturing Plant - Complete June 2006 | |
 | | Clark | Rail | Rail - Lewis and Clark Railroad Rehabilitation - Complete March 2007 |  |
| | | | Rail | Rail - New Seattle to Portland Roundtrip - Complete July 2006 | |
| | | | Rail | Rail - One Existing Train Set from Oregon - Complete November 2003 | |
| |  | Grays Harbor | Rail | Rail - Port of Grays Harbor - Rail Access Improvements - Complete April 2008 |  |
| | | Grays Harbor | Rail | Rail - Port of Grays Harbor Grain Terminal Loop Track - Complete November 2003 | |
 | | Thurston | Rail | Rail - Port of Olympia On-Dock Rail Spur - Complete August 2006 |  |
| |  | Franklin | Rail | Rail - Port of Pasco Intermodal Facility Improvements - Complete May 2007 |  |
 | | Pend Oreille | Rail | Rail - Port of Pend Oreille 286k Upgrades - Complete May 2007 |  |
| | | Walla Walla | Rail | Rail - Port of Walla Walla Railex Project - Complete August 2006 |  |
| | | Grant | Rail | Rail - Quincy Transload Facility - Complete April 2005 | |
| |  | Snohomish | Rail | Rail - Snohomish Riverfront Redevelopment - Complete June 2007 |  |
| | | Pierce | Rail | Rail - Tacoma Rail/Tacoma to Morton - Track Rehab - Complete October 2007 |  |
 | | Lewis, Pierce | Rail | Rail - Tacoma RMDRR Morton Line Repairs – Phase 2 - Complete June 2005 |  |
| | | | Rail | Rail - Washington Fruit Express - Complete June 2002 | |
| | | Pacific | Southwest | SR 103 - Pedestrian Path - Complete October 2007 | |
 | | Mason | Olympic | SR 106 - Skobob Creek Fish Passage - Complete December 2005 |  |
| | | Clallam | Olympic | SR 112 - Fish Barrier Removal Project - Complete June 2006 | |
| |  | Clallam | Olympic | SR 112 - Hoko and Pysht Rivers - Erosion Control - Complete October 2006 |  |
| | | Clallam | Olympic | SR 112 - Jim Creek Culvert Replacement - Complete October 2004 | |
 | | Jefferson | Olympic | SR 116 - Portage Canal Bridge Rail Retrofit - Complete February 2008 |  |
 | | Walla Walla | South Central | SR 124 - East Jct. US 12 - Reconstruction - Complete April 2004 |  |
| | | Clark | Southwest | SR 14 - SE 192nd Avenue Interchange - Complete October 2002 | |
| | | Klickitat | Southwest | SR 142 - Bowman and Snyder Creek Fish Passage Barrier Removal - Complete September 2006 | |
| | | Kitsap | Olympic | SR 16 - Burley Olalla Interim Safety Improvement Project - Complete September 2004 | |
 | | Pierce | Olympic | SR 16 - HOV Improvements - Olympic Drive to Union Avenue - Complete July 2007 |  |
| | | Pierce | Olympic | SR 16 - New Tacoma Narrows Bridge - Open July 2007 | |
| |  | Pierce, Kitsap | Olympic | SR 16 - NW of New Tacoma Narrows to Burley Olalla Cross Over - Complete September 2007 |  |
 | | Pierce | Olympic | SR 161 - Corridor Improvements - 176th to 234th - Complete October 2005 |  |
 | | King | Northwest | SR 161 - Jovita Blvd. to S. 360th St.- Widen - Complete July 2006 |  |
| | | King | Northwest | SR 164 - 158th Avenue SE to High Point Street - Complete July 2007 | |
 | | King | Northwest | SR 167 - Northbound Ramps to Ellingson Road - Complete July 2007 |  |
| | | King | Northwest | SR 167 - Springbrook Creek Culvert Replacement - Complete July 2003 | |
| | | King | Northwest | SR 169 - Green River Bridge to SR 516 - Complete August 2005 | |
| | | King | Urban Corridors | SR 169 - Route Development Plan - Complete December 2007 | |
| |  | King | Northwest | SR 169 - SE 291st Street Safety Improvements (SE 288th) - Complete October 2007 | |
| |  | King | Northwest | SR 169 - SR 516 Four Corners - Complete October 2007 | |
| |  | Grant | North Central | SR 17 - Pioneer Way to Stratford Road - Complete October 2007 |  |
 | | King | Northwest | SR 18 - Covington Way to Maple Valley - Complete April 2007 |  |
 | | King | Northwest | SR 18 - Maple Valley to Issaquah Hobart Road - Complete July 2007 | |
 | | King | Northwest | SR 18 - Maple Valley to Issaquah Road - Roadside Restoration - Complete January 2008 | |
| | | King | Urban Corridors | SR 18 - Weyerhaeuser Way to SR 167 Truck Climbing Lane - Complete October 2005 |  |
| | | Whitman | Eastern | SR 194 - Guardrail Improvements - Complete December 2006 | |
| | | Island | Northwest | SR 20 - Monkey Hill to Troxell Road - Complete November 2006 | |
| | | Island | Northwest | SR 20 - Oak Harbor North City Limit to Frostad Road Vicinity - Complete August 2005 | |
| | | Whatcom | Northwest | SR 20 - Rock Slide Ditch - Complete April 2006 | |
| |  | Skagit | Northwest | SR 20 - Thompson Road - Complete October 2007 | |
| | | Island | Northwest | SR 20 - Troxell Road Vicinity to Cornet Bay Vicinity - Complete August 2007 | |
| | | Ferry | Eastern | SR 20 - Walker Hill Road to Graves Mountain Road - Complete October 2007 | |
| | | Skagit | Northwest | SR 20 -Emergency Road Protection - Rockport - Complete July 2007 | |
| | | King | Northwest | SR 202 - 127th Pl. NW Vicinity to NE 124th (between Woodinville and Redmond) - Complete October 2005 | |
 | | King | Northwest | SR 202 - 244th Avenue NE - Complete November 2006 |  |
 | | King | Northwest | SR 202 - Jct. 292nd Ave SE - Complete October 2006 |  |
| | | King | Northwest | SR 202 - SR 203 to W North Bend Way - Complete July 2007 | |
 | | King | Northwest | SR 203 - NE 124th/Novelty Road Vicinity - Complete September 2004 |  |
| | | Spokane | Eastern | SR 206 - Bruce Road Intersection Roundabout - Complete December 2005 | |
| | | Spokane | Eastern | SR 206 - Deadman Creek Bridge Scour Repair - Complete August 2006 | |
| | | Benton | South Central | SR 240 - Yakima River Bridge - Complete June 2007 |  |
 | | Lincoln, Stevens | Eastern | SR 25 - Spokane and Columbia Rivers Bridge Rail Upgrade - Thrie Beam Guardrail - Complete November 2007 | |
| | | Whitman | Eastern | SR 26 - Relief Bridge Scour Repair - Complete July 2007 | |
| | | Adams | North Central | SR 26 - Thacker Rd. West of Othello - Left Turn Lanes - Complete May 2007 | |
| | | Grant | North Central | SR 28 - West of Ephrata - Paving - Complete October 2007 | |
| |  | Mason | Olympic | SR 3 - Imperial Way to Sunnyslope - Complete September 2007 |  |
| |  | Mason | Olympic | SR 3 - SR 106 South Belfair Signal - Complete July 2007 |  |
 | | Pend Oreille | Eastern | SR 31 - Metaline Falls to Canadian Border-Reconstruction - Complete October 2006 |  |
| | | Pend Oreille | Eastern | SR 31 - Pend Oreille River Bridge Deck Repair - Complete November 2007 | |
| | | Cowlitz | Southwest | SR 4 - Coal Creek to I-5 - Paving - Complete November 2007 | |
| | | Cowlitz | Southwest | SR 4 - Stella Vicinity - Emergency Repairs - Complete June 2007 | |
| | | Cowlitz | Southwest | SR 433 - Lewis and Clark Bridge Deck Replacement - Complete August 2004 |  |
| | | Clark | Southwest | SR 500 - NE 162nd Ave Noise Wall - Complete February 2008 | |
 | | Clark | Southwest | SR 500 - New Interchanges and Additional Lanes - Complete June 2005 |  |
| | | Clark | Southwest | SR 500 - Thurston Way Interchange - Complete October 2002 | |
| | | Lewis | Southwest | SR 508 - Bear Canyon Emergency Repairs - Complete July 2007 | |
| | | Thurston | Olympic | SR 510 - I-5 to Pacific Avenue Widening - Complete September 2003 | |
 | | King | Northwest | SR 516 - 208th and 209th Ave SE - Complete August 2007 |  |
| |  | King | Northwest | SR 520 - Eastside Quieter Pavement Evaluation Project - Complete July 2007 | |
| | | Snohomish | Northwest | SR 522 - Fales Road/Echo Lake Road Interchange - Complete February 2007 | |
 |  | Snohomish | Northwest | SR 522 - I-5 to I-405 - Multimodal Project - NE 153rd Signal and Roadway Widening - Comptete October 2007 |  |
| | | King | Northwest | SR 522 - NE 155th St. to 61st Ave. Paving - Complete December 2005 | |
| | | Snohomish | Northwest | SR 522 - Widening SR 9 to Paradise Lake Road - Complete June 2001 | |
| | | Snohomish | Northwest | SR 524 - I-5 to Richmond Road Vicinity - ACP Overlay - Complete October 2005 | |
| | | Snohomish | Northwest | SR 525 - Widening & Safety Improvements - Complete October 2006 | |
 | | Snohomish | Northwest | SR 527 - 132nd St. SE to 112th St. SE - Complete May 2006 |  |
| | | Snohomish | Northwest | SR 527 - 164th St. SE to 132nd St. SE Additional Lanes - Complete December 2004 | |
 | | Snohomish | Northwest | SR 527 - Corridor Improvements - Complete May 2006 | |
| | | Snohomish | Northwest | SR 528 - Paving - Complete September 2004 | |
| | | Snohomish | Northwest | SR 529 - Paving - Complete September 2004 | |
| | | Snohomish | Northwest | SR 529 - Snohomish River Bridges Repair - Complete November 2006 | |
| | | Snohomish | Northwest | SR 530 - Arlington Heights Road to 139th - Complete August 2006 | |
| | | Skagit, Snohomish | Northwest | SR 530 - Emergency Road Protection - Darrington - Complete December 2007 | |
| | | Snohomish | Northwest | SR 530 - Skaglund Hill Vicinity Paving, 24th and Fortson Mill Road - Complete November 2005 | |
| | | Snohomish | Northwest | SR 530 - Slide Repairs - Complete June 2006 | |
| |  | Snohomish | Northwest | SR 531 - Lakewood Schools Sidewalks - Complete August 2007 | |
| | | Snohomish | Northwest | SR 532 - 72nd Ave NW to Old SR 99 - Paving - Complete November 2007 | |
| | | Whatcom | Northwest | SR 542 - Wells Creek Rd to Mt. Baker Vicinity - Complete October 2005 | |
| | | Lewis | Southwest | SR 6 - Milepost 27 - Slope Stabilization - Complete March 2008 | |
 | | Pierce | Olympic | SR 7 - SR 507 to SR 512 - Safety Improvements - Complete September 2007 |  |
 | | Snohomish | Northwest | SR 9 - 108th Street NE (Lauck Road) - Complete January 2008 |  |
| | | Snohomish | Northwest | SR 9 - 56th Street SE to 60th Street NE Paving and Safety - Complete June 2006 | |
| | | Snohomish | Northwest | SR 9 - Lake Stevens Weigh Station - Complete November 2005 | |
 | | Whatcom | Northwest | SR 9 - Nooksack Road Vicinity to Cherry Street - Complete November 2006 |  |
 | | Snohomish | Northwest | SR 9 - SR 528 Intersection - Complete October 2004 |  |
| | | Skagit | Northwest | SR 9 - SR 538 Intersection Improvements - Complete August 2007 | |
| | | Snohomish | Northwest | SR 9 - US 2 Interchange Modifications - Complete January 2006 | |
| | | Snohomish | Northwest | SR 92 - SR 9 to 84th Street NE Safety Improvements - Complete September 2006 | |
| | | Snohomish | Northwest | SR 92 - Stevens Creek Culvert Replacement - Complete October 2005 | |
| | | Snohomish | Northwest | SR 96 - Seattle Hill Road Slide Repair - Open January 2008 | |
| | | Snohomish | Northwest | SR 99 - 112th Street SW to I-5 Vicinity - Paving - Complete November 2007 | |
| | | King | Northwest | SR 99 - Aurora Avenue at Galer Street Pedestrian Overpass - Complete June 2004 | |
 | | King | Northwest | SR 99 - Aurora Bridge Rail Retrofit - Complete November 2005 | |
| | | King | Northwest | SR 99 - Aurora Bridge Seismic Retrofit - Complete July 2005 | |
| | | King | Northwest | SR 99 - North Corridor Study - Complete March 2003 | |
| |  | Snohomish | Northwest | SR 99 - North of Lincoln Way Sidewalks - Complete April 2008 | |
 | | King | Northwest | SR 99 - South 284th St to South 272nd St - HOV Lanes - Complete September 2007 |  |
| | | Pierce, Thurston | Olympic | State Highways in Pierce and Thurston Counties - Safety - Complete October 2007 |  |
| | | Pacific | Southwest | US 101 - Astoria Bridge to SR 4 Paving - Complete June 2008 | |
| |  | Jefferson | Olympic | US 101 - Mt. Walker NB & SB Passing/Truck Lane - Complete October 2007 |  |
| | | Mason | Olympic | US 101 - Sunnyside Road Vicinity - Slope Stabilization - Complete November 2007 | |
 | | Grays Harbor | Olympic | US 101/12 - SR 105 Bridge Rail Retrofit - Complete March 2008 |  |
| | | Walla Walla | South Central | US 12 - Coppei Creek Bridge - Complete November 2005 | |
| | | Walla Walla | South Central | US 12 - McNary Pool to Attalia - Complete August 2004 |  |
| |  | Grays Harbor | Olympic | US 12 - Montesano Vicinity to Elma - Median Cross Over - Complete October 2006 |  |
| | | Asotin | South Central | US 12 - Snake River Bridge at Clarkston - Deck Rehabilitation - Complete January 2007 | |
 | | Walla Walla | South Central | US 12 - SR 124 to McNary Pool - Complete November 2005 |  |
| | | Thurston | Olympic | US 12 - Vicinity Joselyn St to I-5 - Paving - Complete October 2007 | |
| | | Spokane | Eastern | US 195 - Cornwall Rd. to Hatch Rd.-Northbound Dowel Bar Retrofit and Paving - Complete August 2007 | |
| | | Whitman | Eastern | US 195 - SR 271 Junction to Plaza - Complete March 2007 | |
| | | Chelan | North Central | US 2 - 1 mile W of Leavenworth - Unstable Slope - Complete April 2007 | |
| | | Snohomish | Northwest | US 2 - 179th Avenue to Woods Creek Bridge - Complete June 2007 | |
 | | Chelan | North Central | US 2 - Dryden - Complete August 2007 |  |
| | | Snohomish | Northwest | US 2 - Ebey Island Viaduct and Ebey Slough Bridge Rehabilitation - Complete September 2007 | |
| | | Snohomish | Northwest | US 2 - Everett Vicinity Seismic Retrofit - Complete March 2007 | |
| |  | Snohomish | Northwest | US 2 - Fern Bluff Road Vicinity to Sultan Startup Road Vicinity - Complete October 2007 | |
| | | Chelan | North Central | US 2 - Leavenworth to Cashmere - Paving - Complete August 2007 | |
 | | Snohomish | Northwest | US 2 - Pickle Farm Road/Gunn Road - Complete November 2007 |  |
| | | Snohomish, King | Northwest | US 2 - Route Development Plan - Snohomish to Skykomish - Complete November 2007 | |
| | | Snohomish | Northwest | US 2 - Rumble Strips - Complete October 2004 | |
 | | Snohomish | Northwest | US 2 - Stevens Pass-West, Slope Stabilization - Complete August 2005 | |
| | | Chelan, King | North Central | US 2 - West Stevens Pass - Paving - Complete September 2007 | |
| | | Snohomish | Northwest | US 2 - Westbound Hewitt Avenue Trestle Project - Complete October 2002 | |
| | | Adams | Eastern | US 395 - Franklin County Line to Jantz Rd. - Southbound Paving - Complete December 2007 | |
| | | Spokane | Eastern | US 395 - Hastings Rd Intersection - Concrete Paving - Complete August 2007 | |
| | | Franklin | South Central | US 395 - Hillsboro Street Interchange - Complete August 2003 | |
 | | Benton | South Central | US 395 - Kennewick Variable Message Sign - Complete November 2004 |  |
| | | Spokane | Eastern | US 395 - Wild Rose Road Intersection Channelization - Complete July 2007 | |
| |  | Chelan, Kittitas, Okanogan | North Central | US 97 - NCR Roadside Safety - Complete August 2006 |  |
| | | Okanogan | North Central | US 97 - Oroville Vicinity - Paving - Complete September 2007 | |
 | | Chelan | North Central | US 97A - Entiat Park Entrance Turn Lanes - Complete May 2004 |  |