Overview
Added two additional lanes (one general purpose lane in each direction) to I-90 from the Argonne Road Interchange to the Sullivan Road Interchange. The work was opened to traffic in November 2005 with the final minor roadway items finished up in spring 2006.
 | Improves Safety
Three sections in this corridor, totaling five miles in length, have been designated as "High Accident Corridor" locations. The majority of crashes in these sections are rear end or sideswipes. The addition of general purpose lanes in each direction will help reduce these types of collisions.
|
 | Relieves Congestion
The project improved traffic flow and reduces congestion with the additional lanes.
|
Partnerships & Cooperation
The WSDOT worked closely with the Washington State Patrol to ensure safety during the construction process.
Funding
This project is funded from the following sources:
- 2003 Gas Tax (Nickel Funding) - $34,088,219
- Existing Funds - $2,274,517
- Total funding Available From All Sources - $36,362,736