
Six ponds are located along the I-5 Pierce County Line to Tukwila stage 4 project site. Four of the six ponds are now completed. The pond located near S 373th Street will be constructed summer 2006. The pond located near SR 161 (Enchanted Parkway) will be completed fall 2006. These ponds will filter and treat highway run-off.