Local Agency GSPs

Local Agency GSPs - Divisions 2-9

Provided for the Sole Use Of Local Agencies -
These GSPs May NOT Be Used on WSDOT Projects

Division 2

2-06.3(3)

Subgrade for Permeable Pavements

PHMA/PWMA/PConcrete
(March 9, 2016)
May be used on FHWA funded projects.

For use when specifying Permeable pavement.

Please read notes before using.

2-06.5

Subgrade for Permeable Pavements

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.

For use when specifying Permeable pavement.

Please read notes before using.

Division 4

4-04.2(9-03.9(2)).Opt1

Permeable Ballast

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.

For use when specifying Permeable pavement.

Please read notes before using.

4-04.2(9-03.9(2)).Opt2

Crushed Surfacing Choker Course

PHMA/PWMA

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Permeable pavements.

Please read notes before using.

4-04.2(9-03.9(2)).Opt3

Aggregates for Permeable Base

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.

Must use with 4-04.2(9-03.9(2)).Opt1 and/or 4-04.2(9-03.9(2)).Opt2.

Please read notes before using.

4-04.3(5)

Shaping and Compaction

PHMA/PWMA/PConcrete

(March 9, 2016)

Use when specifying Porous HMA or Pervious Concrete.
Because of the high void content in the aggregates, there will be some displacement of the aggregate surface under load. Crushed Surfacing Choker Course is used to minimize the displacement in preparation for paving. The use of Asphalt Treated Permeable Base (ATPB) directly over the Permeable Ballast Base Course eliminates the need for Crushed Surfacing Choker Course.

Please read notes before using.

4-04.4

Measurement

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Crushed Surfacing Choker Course.

Please read notes before using.

4-04.5

Payment

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Crushed Surfacing Choker Course.

Please read notes before using.

4-SA1

Asphalt Treated Base (ATB)
(May 5, 2015)
May be used on FHWA funded projects.

4-SA2

Asphalt Treated Permeable Base (ATPB)

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Optional - May be used as a Base for Porous Hot Mix Asphalt, when used, also use 2-06.3(3).

Please read notes before using.

Division 5

5-04

Hot Mix Asphalt    REV

(July 18, 2018)

Use on all projects utilizing the APWA HMA Specifications.

May be used on FHWA funded projects.

5-04.1

Description

PHMA/PWMA/PConcrete

(March 9, 2016)

Hot Mix Asphalt

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.2(9-03.8)

Materials

PHMA/PWMA/PConcrete

(March 9, 2016)

Aggregates for Porous Hot Mix Asphalt/Porous Warm Mix Asphalt (PHMA/PWMA)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.3

Construction Requirements

PHMA/PWMA/PConcrete

(March 9, 2016)

Porous Asphalt (PHMA/PWMA) Acceptance Filtration Test

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.3(1)

Hot Mix Asphalt Mixing Plant

PHMA/PWMA/PConcrete

(March 9, 2016)

Fiber Supply System

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.3(7)A

Mix Design

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.3(8)A1.Opt2

 

General

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.3(8)A6.Opt2

 

Test Methods

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.

Please read notes before using.

5-04.3(9)

 

Spreading and Finishing

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.3(10)A

 

General

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.4

 

Measurement

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-04.5

 

Payment

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
Use when specifying Porous HMA.

Please read notes before using.

5-06.SA

 

Pervious Concrete Pavement

PHMA/PWMA/PConcrete

(March 9, 2016)

May be used on FHWA funded projects.
When used, include 2-06.3(3), 4-04.2(9-03.9(2)).Opt1, or 4-04.2(9-03.9(2)).Opt1 and 4-SA2 or 4-04.2(9-03.9(2)).Opt2 as sub base and base courses.

Please read notes before using.

Division 9

9-03.6

 

Aggregates for Asphalt Treated Base (ATB)

(May 5, 2015)

May be used on FHWA funded projects.