ARRA Highway Project List

Photo of I-5 Pierce County HOV Lanes

Below are the projects that are funded by the 2009 American Recovery and Reinvestment Act.

Locate these projects on a map .

Dot graphic - Advertised for Bids - Advertised for Bids
Under Construction - Contract Awarded / Under Construction
Operationally Complete - Operationally Complete


Click on any of the column headings to sort the list

Agency Name Project Title Project Type Stimulus Amount (millions) Ad Date Status
WSDOT US 101/SR 103 Fort Columbia - Long Beach - Paving
Asphalt Preservation
$0.39

3/9/09 Operationally Complete
WSDOT I-90/Yakima River to W Ellensburg - Paving
Asphalt Preservation
$2.40

3/9/09 Operationally Complete
WSDOT I-90/Slide Curve to Cabin Creek - Paving
Concrete Preservation
$2.73

3/9/09 Operationally Complete
Redmond NE 36th Street Bridge Capacity Improvement $4.59 3/13/09 Operationally Complete
WSDOT SR 17/Grant County Airport North - Paving
Asphalt Preservation
$3.69

3/23/09 Operationally Complete
WSDOT SR 282/Ephrata South - Paving
Asphalt Preservation
$1.84

3/23/09 Operationally Complete
WSDOT I-405/NE 8th Street to SR 520 Ramps
I: Nickel / TPA Funding
$79.97
11/9/09 Operationally Complete
Deer Park Crawford Avenue Phase V Preservation / Safety $1.67 3/31/09 Operationally Complete
Conconully Main Street / East Lake Street Overlay Preservation $0.12 4/1/09 Operationally Complete
Lynden Grover Street Freight / Safety $0.98 4/1/09 Operationally Complete
WSDOT SR 155/Omak Eastward - Chip Seal Asphalt Preservation
$0.94 4/6/09 Operationally Complete
WSDOT SR 243/Mattawa Vicinity - Chip Seal Asphalt Preservation
$1.32 4/6/09 Operationally Complete
WSDOT SR 262/Potholes Reservoir Area - Chip Seal Asphalt Preservation
$1.05 4/6/09 Operationally Complete
Lynnwood I-5/196th Street SW Interchange Bridge/Pedestrian Improvements (TE) Pedestrian Improvement $2.18 4/8/09 Operationally Complete
Spokane 5 Mile Road Preservation / Safety $0.11 4/8/09 Operationally Complete
Sedro-Woolley Fruitdale/McGarigle Road Project & SR9/Township Sidewalk Preservation / Safety $0.13 4/9/09 Operationally Complete
WSDOT US 2/Monroe City Limit to Sultan - Overlay Asphalt Preservation
$1.83 4/13/09 Operationally Complete
WSDOT SR 14/Cliffs Road to Chamberlain/Goodnoe Rd - Chip Seal
Asphalt Preservation
$0.41 4/20/09 Operationally Complete
WSDOT I-5/Koontz Road to Harrison Avenue - Paving Asphalt Preservation
$2.75 4/20/09 Operationally Complete
WSDOT I-82/Granger to W Grandview WB - Dowel Bar Retrofit and Concrete Rehab Concrete Preservation
$5.95 4/20/09 Operationally Complete
WSDOT I-90/Lake Easton to Bullfrog I/C WB - Concrete Concrete Preservation
$15.12 4/28/09 Operationally Complete
WSDOT I-90/Snoqualmie Summit to Hyak WB - Dowel Bar Retrofit and Concrete Rehab Concrete Preservation
$3.44 4/27/09 Operationally Complete
WSDOT I-5/SR 532 Vicinity to Starbird Rd Vicinity - Concrete Rehab
Concrete Preservation
$6.23 4/27/09 Operationally Complete
WSDOT I-5/Marysville to Stillaguamish River ITS
Safety Improvement
$2.50 4/27/09 Operationally Complete
WSDOT US 97/Centerville Road to Bickleton Road & Satus Pass
Asphalt Preservation
$3.20 4/27/09 Operationally Complete
WSDOT US 395/Loon Lake to Immel Road - Paving
Asphalt Preservation
$6.20 4/20/09 Operationally Complete
WSDOT I-5/SR 16 Eastbound Nalley Valley Viaduct I: Nickel / TPA Funding
$6.23 4/11/11 Operationally Complete 
WSDOT I-5/North Kelso to Castle Rock - Stage 2 - Concrete Rehab  Concrete Preservation
$6.18 4/27/09 Operationally Complete
WSDOT  US 2/Jct SR 211 to Newport - Paving
Asphalt Preservation
$5.53 5/4/09 Operationally Complete
WSDOT US 395/Spokane County Line to Loon Lake - Paving Asphalt Preservation
$1.97 4/27/09 Operationally Complete
WSDOT SR 206/Jct US 2 to Bruce Road
Asphalt Preservation
$0.67 5/4/09 Operationally Complete
WSDOT I-90/Snoqualmie Pass Vicinity - Camera Replacement Safety Improvement
$0.60 5/19/09 Operationally Complete
WSDOT I-405/NE 195th to SR 527 (Design Build)
I: Nickel / TPA Funding
$22.99 5/6/09 Operationally Complete
WSDOT I-5/Port of Tacoma Road to King County Line - Add HOV Lanes  I: Nickel / TPA Funding
$35.39 6/1/09 Operationally Complete
WSDOT Rumble Strips - Statewide
Safety Improvement
$2.45 6/22/09 Operationally Complete
WSDOT Cable Barrier Retrofit - Statewide Safety Improvement
$9.23 6/22/09 Operationally Complete 
WSDOT SR 501/Ridgefield Interchange - Rebuild Interchange I: Nickel / TPA Funding

$8.20 6/22/09 Operationally Complete
WSDOT SR 20/US 395/SR 26 HAR Site Upgrade Safety Improvement
$0.24 5/26/09 Operationally Complete
WSDOT I-82/Valley Mall Blvd - Rebuild Interchange
I: Nickel / TPA Funding
$19.65 11/23/09 Operationally Complete
WSDOT Lewis & Clark Bridge - Painting
Preservation Painting
$12.60 2/1/10 Operationally Complete
WSDOT I-90/Lake Easton to Big Creek Bridge EB Concrete
Concrete Preservation
$16.30 2/1/10 Operationally Complete 
Aberdeen Heron Street Sidewalk Bulb-out Project (TE) Pedestrian / Safety $0.61 5/4/09 Operationally Complete
Adams County Lee Road - Phase 1 Preservation $0.71 5/28/09 Operationally Complete
Arlington 188th Street Pedestrian Trail (TE) Multi User Trail $0.11 7/9/09 Operationally Complete
Asotin County Scenic Way Pavement Overlay Project Preservation $0.59 6/17/09 Operationally Complete
Bainbridge Island Core 40 Shoulder Widening Program - Blakely Nonmotorized Project - Phase 2 (TE) Pedestrian Improvement $0.06 6/12/09 Operationally Complete
Battle Ground North Parkway Improvement, N 5th to Onsdorff Capacity Improvement $0.04 8/5/09 Operationally Complete
Bellingham 2009 Pedestrian Crossing Safety ($128,448 TE) Pedestrian Improvement $0.31 5/28/09 Operationally Complete
Benton City 7th Street: Ellen Avenue to North City Limits Pedestrian Improvement $0.21 7/20/09 Operationally Complete
Benton County Webber Canyon Road: Kiona to I-82 and Kiona Roads Preservation / Safety $1.00 6/24/09 Operationally Complete
Blaine Boblett Street Access Improvement $0.35 7/1/09 Operationally Complete
Bothell North Creek Trail - Section 1, Stage 2 (Schnitzer) (TE) Multi User Trail $0.50 8/19/09 Operationally Complete
Bothell North Creek Trail - Section 2, Stage 2 (Canyon Park) (TE) Multi User Trail $0.55 8/19/09 Operationally Complete
Burien 4th Avenue SW Pedestrian Safety Project (TE) Bicycle & Pedestrian Improvements $0.54 6/8/09 Operationally Complete
Camas Leadbetter Drive, Lake Road to Parker Street Capacity Improvement $0.57 2/23/10 Operationally Complete 
Castle Rock Riverfront Trail Restoration (TE) Bicycle & Pedestrian Improvements $0.07 6/23/09 Operationally Complete
Chelan County North Road Improvement & Pathway Under Railroad Trestle Access & Safety Improvements $1.02 4/28/09 Operationally Complete
Cheney Spangle Road Improvement Project Preservation / Safety $0.58 7/15/09 Operationally Complete
Chewelah Court Street Bridge Replacement Capacity / Safety $0.35 7/23/09 Operationally Complete
Clallam County Lake Crescent Olympic Discovery Trail ($35,000 TE) Multi User Trail $0.33 5/5/09 Operationally Complete 
Clallam County Mt. Pleasant Road Preservation / Safety $0.50 6/9/09 Operationally Complete
Clark County NE 99th Street, SR 503 to NE 137th Avenue Capacity Improvement $1.83 8/26/09 Operationally Complete
Colfax Fairview Street Overlay Preservation $0.12 7/14/09 Operationally Complete
College Place Whitman Drive Multi-use Path (TE) Multi User Trail $0.06 7/15/09 Operationally Complete
Community Transit Mountlake Terrace Park-N-Ride (Upper Parking Area) Park-N-Ride $0.43 FTA Transfer
Cowlitz County Coal Creek Road Reconstruction Preservation / Safety $1.06 6/23/09 Operationally Complete
Cowlitz County Hall Road Reconstruction Preservation / Safety $0.33 6/9/09 Operationally Complete
Dayton Dayton Avenue Overlays Preservation $0.22 7/1/09 Operationally Complete
Dayton West Dayton Street Beautification (TE) Scenic Beautification $0.14 7/1/09 Operationally Complete
Eatonville SR 161: Rural Town Center & Corridor Program Reconstruction & Pedestrian Improvements $0.58 8/14/09 Operationally Complete
Edmonds Annual Asphalt Overlay Preservation $1.00 7/14/09 Operationally Complete
Ellensburg Canyon Road Overlay/I-90 to Umptanum Road Preservation $0.33 4/29/09 Operationally Complete
Everett Holly Drive Non-Motorized Improvements (TE) Bicycle & Pedestrian Improvements $0.39 5/20/09 Operationally Complete
Ferndale 2nd Avenue Access Improvement $1.54 7/8/09 Operationally Complete
Ferry County Bridge Creek Top East Preservation $0.32 11/18/09 Operationally Complete 
Forks Bogachiel Way Preservation / Safety $0.16 6/24/09 Operationally Complete
Franklin County CRP 596 R170 Landslide Area - Phase I Reconstruction $0.75 6/25/09 Operationally Complete
Garfield County County Wide Pavement Preservation Preservation $0.23 5/1/09 
Operationally Complete
Grandview Euclid Avenue Resurfacing Project Preservation $0.31 5/13/09 Operationally Complete
Grant County Bridge #244 - Road 3-NE East Low Canal Preservation $0.75 6/23/09 Operationally Complete
Grant County Fairgrounds Path (TE) Pedestrian Improvement $0.03 7/7/09 Operationally Complete
Grant County L-NE Overlay Preservation $0.49 4/21/09 Operationally Complete
Harrah Harrah Road Improvements Preservation $0.34 7/1/09 Operationally Complete
Hoquiam City Wide Pedestrian Safety and Mobility Improvement Phase II (TE) Pedestrian Improvement $0.33 7/13/09 Operationally Complete
Ilwaco Beards Hollow Overlook (TE) Scenic Beautification $0.10 8/5/09 Operationally Complete
Island County Ault Field Road Widening Capacity Improvement $1.09 4/29/09 Operationally Complete
Island County Roadway Preservation Preservation $0.30 6/23/09 Operationally Complete
Jamestown S'Klallam Tribe Jamestown Community Center to Blyn Road Trail Enhancement ($11,000 TE) Multi User Trail $0.11 7/14/09 Operationally Complete
Jefferson County Center Road Overlay Phase 4 Preservation $0.36 4/22/09 Operationally Complete
Kalama First Street Phase II Preservation / Safety $0.42 7/1/09 Operationally Complete
Kelso 13th Avenue Overlay Preservation $0.22 5/27/09 Operationally Complete
Kennewick Columbia Overlook - Phase 1 (TE) Pedestrian Improvement $0.11 5/6/09 Operationally Complete
Kent East Valley Highway - S 212th Street to SR 167 Capacity Improvement $2.00 6/16/09  Operationally Complete
Kettle Falls Kettle Falls Pedestrian Improvements (TE) Pedestrian Improvement $0.04 7/21/09 Operationally Complete
King County SW 98th Street Phase I Pedestrian Corridor (TE) Pedestrian Improvement $1.27 5/7/09 Operationally Complete
Kittitas County Guardrail Hazard Elimination Projects (Safety) Safety Improvement $0.39 6/18/09 Operationally Complete
Kittitas County Yakima River Canyon Center Phase I (TE) Scenic Beautification $0.04 6/18/09 Operationally Complete
Klickitat County  Bickleton Highway (MP 6.90 to 9.65) Freight $0.26 6/24/09 Operationally Complete
Klickitat County South Columbus (MP 0.77 to 3.16) Freight $0.47 6/24/09 Operationally Complete
La Conner Maple Street Overlay and Sidewalks Preservation and Pedestrian Improvement $0.15 6/3/09 Operationally Complete
Lacey Lacey Woodland Regional Trail ($6,965 TE) Multi User Trail $1.00 4/30/09 Operationally Complete
Lewis County Davis Lake Road MP 0.33 to 2.62 Preservation $1.03 6/1/09 Operationally Complete
Lewis County Jackson Highway MP 1.22 to 2.81 Preservation $0.74 6/1/09 Operationally Complete
Lincoln County Kiner Road No. 9115, Phase 1 - MP 8.80 to 13.04 Preservation $0.64 5/28/09 Operationally Complete
Lummi Tribe Haxton Way / Red River Pedestrian Path Pedestrian Improvement $0.25 1/20/10 Operationally Complete
Marysville Street Overlay Project Preservation $0.43 7/1/09 Operationally Complete
Mason County McEwan Prairie Road HMA Overlay (Countywide Paver) Preservation / Freight $0.29 6/25/09 Operationally Complete
Mason County Solar Lighted Intersections - Safety Safety Improvement $0.15 6/4/09 Operationally Complete 
McCleary Simpson Avenue Sidewalks ($47,680 TE) Pedestrian Improvement $0.33 9/28/09 Operationally Complete
Moses Lake Lakeshore & Peninsula Reconstruction 2009 Preservation $1.20 7/3/09 Operationally Complete
Mount Vernon Laventure/Anderson Extension (Phase 1-Fowler to Blackburn) Access Improvement $0.92 6/9/09 Operationally Complete
Mountlake Terrace 52nd Avenue Reconstruction Project Preservation $0.86 5/15/09 Operationally Complete
Moxee Beaudry Road Improvement Project Preservation / Safety $0.50 6/22/09 Operationally Complete
Mukilteo/ Snohomish County Harbour Pointe Blvd Street Reconstruction Preservation $0.81 5/27/09 Operationally Complete
Naches 2nd Street and 3rd Street Resurfacing Project Preservation / Safety $0.33 6/24/09 Operationally Complete
Normandy Park 1st Avenue South, Phase 2A, Multi-modal Enhancements (SW 192 to SW 200) (TE) Bicycle & Pedestrian Improvements $3.83 5/27/09 Operationally Complete
Olympia Union Avenue Overlay Preservation $0.97 6/3/09 Operationally Complete 
Omak Okoma Drive/SR 215 Sidewalk Project (from 4th Avenue to Jasmine Street) ($26,967 TE) Pedestrian Improvement $0.17 6/24/09 Operationally Complete
Oroville 5th Avenue/97 to 23rd Avenue/97 (SR 97 MP 331.22 to 332.70) Pedestrian Improvement $0.58 7/8/09 Operationally Complete
Orting SR 162 Rechannelization Access Improvement $0.42 6/9/09 Operationally Complete
Pacific County Sandridge Road Overlay & Signalization Project Preservation / Safety $0.28 6/9/09 Operationally Complete
Pend Oreille County Deer Valley Road Preservation $0.47 7/1/09 Operationally Complete 
Port Angeles Peabody Street - 5th to 8th Preservation / Safety $0.39 6/7/09 Operationally Complete
Port of Everett/ Everett W Marine View Dr Roadway Ped/Bike Corridor Improvements (11th to 16th) Bicycle & Pedestrian Improvements $1.29 7/13/09 Operationally Complete
Port of Pasco Intermodal Rail Project Phase 5 Freight Rail $0.22 2/7/10 Operationally Complete
Port of Tacoma Lincoln Avenue Grade Separation Freight $15.41 5/29/09 Operationally Complete
Port of Vancouver West Vancouver Freight Access Project Freight Rail $2.50 9/24/09 Operationally Complete
Port Townsend Upper Sims Way Improvements A & B Safety Improvement $1.96 7/5/09 Operationally Complete
Poulsbo Viking Avenue Improvements Phase II and III (McDonalds to SR305) Preservation & Capacity Improvement $3.39 5/1/09 Operationally Complete
Prosser Sheridan Avenue Improvements - Phase I Preservation / Safety $0.47 5/20/09 Operationally Complete
Pullman College Hill Arterial Reconstruction Preservation $0.32 5/29/09 Operationally Complete
Puyallup Phase III Shaw Road Extension Project Freight $1.20 5/27/09 Operationally Complete
Rainier Minnesota Street North of SR 507 Overlay & Enhancements ($149,689 TE) Preservation / Safety $0.69 6/26/09 Operationally Complete
Renton Rainier Ave S (SR 167) Improvements Project - Phase 1: Shattuck Avenue Stormwater Bypass Capacity Improvements $1.95 6/24/09 Operationally Complete
Richland First Street Improvements Preservation $1.60 7/6/09 Operationally Complete
Ridgefield Hillhurst Road Overlay Project Preservation $0.17 7/29/09 Operationally Complete
Sammamish East Lake Sammamish Parkway - NE Inglewood Hill Road to NE 28th Place Capacity Improvement $3.50 7/15/09 Operationally Complete
San Juan County Fisherman Bay Road (MP 0.43 to 2.19) Preservation $0.42 4/14/09 Operationally Complete
Seattle S Spokane Street Viaduct Preservation $15.44 5/14/09 Operationally Complete 
Selah Speyers Road Improvements Preservation $1.54 6/29/09 Operationally Complete
Skamania County Cascade Drive Pedestrian Walkway (TE) Pedestrian Improvement $0.01 6/16/09 Operationally Complete
Skamania County Wind River Road (MP 0.00 - 1.00) Preservation $0.31 6/16/09 Operationally Complete
Skokomish Tribe SR 101/t3ba'das Parkway Intersection & Safety Improvements Safety Improvement $0.54 1/13/10 Operationally Complete
Spokane Fish Lake Trail ($308,679 TE) Bicycle & Pedestrian Improvements $0.78 6/3/09 Operationally Complete
Spokane County 5 Mile + Strong Road - Project 1 Preservation/Safety $0.82 5/15/09 Operationally Complete
Spokane County Rutter Parkway Preservation / Safety $0.29 5/15/09 Operationally Complete
Spokane Valley Sprague Avenue Resurfacing Project #1 Preservation $2.61 4/17/09 Operationally Complete
Stanwood 68th Road Realignment and School Safety Improvement Project Access & Pedestrian Safety $0.64 6/28/09 Operationally Complete
Stevens County County Wide Pavement Preservation Preservation $0.94 4/23/09 Operationally Complete
Sumas Bob Mitchell Avenue Preservation $0.11 6/1/09 Operationally Complete
Sunnyside Yakima Valley Highway at Lincoln Avenue Intersection Preservation $0.15 7/23/09 Operationally Complete
Tenino Sussex Avenue Street Illumination Safety Improvement $0.59 6/26/09 Operationally Complete
Thurston County Old Highway 99 Turn Lane, North of Great Wolf Lodge Safety Improvement $0.28 11/17/09 Operationally Complete
Thurston County Prairie Creek Bridge Replacement Capacity Improvement $1.05 11/17/09 Operationally Complete
Thurston County Steilacoom Road Pedestrian Enhancements (TE) Pedestrian Improvement $0.09 6/2/09 Operationally Complete
Toppenish S Toppenish Avenue and Washington Avenue Improvements Preservation $0.29 6/24/09 Operationally Complete
Tulalip Tribe 116th/34th Avenue NE Fish Passage Culvert Improvement / Preservation $1.40 6/26/09 Operationally Complete
Tumwater Capitol Boulevard Preservation Project - Dennis to Israel Preservation $0.16 6/3/09 Operationally Complete
Tumwater Capitol Boulevard Sidewalk and Bike Lane Project ($158,000 TE) Bicycle and Pedestrian Improvements $0.31 6/3/09 Operationally Complete
Union Gap N Rudkin, and Main/Ahtanum Rd Intersection Overlay Preservation $0.25 6/24/09 Operationally Complete
Union Gap Wide Hollow Creek Pathway - Phase 2 (TE) Bicycle and Pedestrian Improvements $0.12 6/24/09 Operationally Complete
Wahkiakum County / WSDOT SR 4/Pave West Little Island Road Preservation $0.20 5/11/09 Operationally Complete
Walla Walla 13th Avenue Improvements: Rose to Rees Preservation / Safety $1.98 7/24/09 Operationally Complete 
Wapato Camas Avenue Grind And Overlay Project Preservation $0.31 7/9/09 Operationally Complete
Washougal SR 14 Pedestrian Tunnel ($285,276 TE) Pedestrian Improvement $0.51 4/30/09 Operationally Complete
Wenatchee Historic Pipeline/Pedestrian Bridge ($73,370 TE) Preservation $1.53 7/9/09 Operationally Complete
Whatcom County Scott Ditch Bridge Preservation $0.60 6/17/09 Operationally Complete
Whitman County Wawawai Road Overlay Preservation $0.78 6/18/09 Operationally Complete
Wilbur / WSDOT US 2/Wilbur Walkway to Sports Complex Pedestrian Improvement $0.16 5/26/09 Operationally Complete
Yakima Nob Hill Boulevard Improvements Pedestrian Improvement $0.61 6/23/09 Operationally Complete
Yakima County Terrace Heights Drive Preservation $0.40 5/20/09 Operationally Complete

Tier 2 Projects (what is a Tier 2 project?)


Agency Name Project Title Project Type Stimulus Amount (millions) Ad Date
Status
WSDOT I-90/Moses Lake - Paving
Asphalt Preservation $3.75  6/15/09 Operationally Complete
WSDOT I-5/Martin Way to 48th Street - Dowel Bar and Panel Replacement Concrete Preservation
$10.72
 8/31/09 Operationally Complete
WSDOT I-5/Todd Road Vicinity to Kelso Weigh Station Vicinity Asphalt Preservation
$2.44
12/14/09 Operationally Complete
WSDOT US 195/Hatch Road to Jct I-90 - Dowel Bar Retrofit Concrete Preservation $2.53 8/18/09 Operationally Complete
WSDOT I-90/Two Way Transit - Dowel Bar Retrofit Concrete Preservation
$7.46 11/2/09 Operationally Complete
WSDOT I-82/Granger to W Grandview - EB Dowel Bar Retrofit and Concrete Rehab Concrete Preservation
$4.58 1/19/10 Operationally Complete 
WSDOT I-5/North Kelso to Harrison - Safety Improvements Safety Improvement
$5.14
11/2/09 Operationally Complete
WSDOT US 97/S of Chelan Falls – Add Passing Lane Safety Improvement $0.68 2/22/10 Operationally Complete

Local
Agency
Project Title Project Type Stimulus Amount (millions) Ad Date
Status
Wahkiakum County Wahkiakum Ferry Terminal Terminal Preservation $0.59 7/14/09 Operationally Complete
Grandview "Alive" Downtown Improvements - Phase 1 Preservation/Safety $2.03 12/11/09 Operationally Complete
Skagit County/ Anacortes 6th Street Reconstruction Preservation $0.47 1/13/10 Operationally Complete
Columbia County Patit Creek Overlay Preservation $0.62 12/7/09 Operationally Complete
Bellingham Bakerview & Hannegan/Woburn Preservation $1.45 2/25/10 Operationally Complete
Monroe US 2/Chain Lake Road/N Lewis Street (SR 203) Intersection Improvements Capacity Improvements $2.36 11/10/09 Operationally Complete
Lake Stevens Lundeen Parkway Roundabout Access Improvement $0.45 9/2/09 Operationally Complete
Port of Bremerton Cross-SKIA Connector - Phase 1 Safety Improvement $2.41 8/26/09 Operationally Complete
Port of Seattle E. Marginal Way (Grade Separation) Access Improvement $2.88 7/21/09 Operationally Complete
Mountlake Terrace 230th Reconstruction Project (56th to 61st Avenues) Safety Improvement $0.82 12/16/09 Operationally Complete
North Bend North Bend Park and Ride Access Improvement $0.23 FTA Transfer
University Place Intermodal Transit Facility - Phase 2 Access Improvement $0.80 1/19/10 Operationally Complete
Arlington Gifford Avenue Sidewalk Pedestrian Improvement $0.09 1/21/10 Operationally Complete
Snohomish County 84th Street NE Overlay (SR-9 to 99th Ave NE and 131st Ave NE to SR-92) Asphalt Preservation $0.48 12/9/09 Operationally Complete
Battleground Arterial Overlay Asphalt Preservation $0.41 3/17/10 Operationally Complete
Clark County Arterial Overlay Asphalt Preservation $0.67 2/17/10 Operationally Complete
Spokane County 5 Mile + Strong Road - Project 2 Asphalt Preservation $0.33 7/31/09 Operationally Complete
Rockford First Street / Emma Street Sidewalks Pedestrain Improvements $0.30 2/12/10 Operationally Complete
Vancouver 2010 Arterial Resurfacing Preservation $2.50 3/15/10
Operationally Complete
Cheney BNSF & UPRR Pedestrian Crossing Improvement Pedestrain Improvements $0.11 2/16/10 Operationally Complete
Bothell Annual Arterial Roadway Preservation Preservation $0.46 6/10/10 Operationally Complete
Everett ARRA HMA Overlay HMA Overlay
$0.64 6/14/10
Operationally Complete
Lakewood Lakewood Traffic Signal Upgrades Phase 3 - Fiber Interconnect Safety Improvement
$0.15 6/30/10
Operationally Complete
Airway Heights Lawson Street Reconstruction Asphalt Preservation $0.37 9/9/10 Operationally Complete
Cheney 2010 Arterial Street Preservation Asphalt Preservation $0.49 6/13/10 Operationally Complete
Spokane Wellesley Avenue - Assembly to Driscoll Pedestrain Improvements $0.94 6/23/10 Operationally Complete
Bainbridge Island Manitou Beach Drive and N Madison Avenue Overlay - Phase 1 Asphalt Preservation $0.09 9/17/10 Operationally Complete
King County Transit Bus Replacement $1.05 FTA Transfer
Poulsbo Noll Road Improvements - Phase 1 and Phase 2 Pedestrian & Bicycle Improvements $0.40 9/17/10 Operationally Complete
Ellensburg Canyon Road Overlay - Umptanum Road to Mountain View Preservation $0.28 8/5/10 Operationally Complete
Ferry County County Wide Guardrail Saftey Improvement $0.33 9/22/10 Operationally Complete
Ellensburg Canyon Road Overlay - Berry Road to I-90 Asphalt Preservation $0.14 10/22/10 Operationally Complete
Spokane Hatch Road / 43rd to Perry Pedestrian & Bicycle Improvements $0.26 10/27/10 Operationally Complete

ARRA - Tiger Discretionary Grant Program
Local
Agency
Project
Type
Stimulus Amount (millions)
Ad Date
Status
South Lake Union Mercer Corridor Improvements Seattle
Capacity Improvement
$30.00
3/10/10
Operationally Complete 
US 395/NSC-Francis Ave to Farwell Rd - New Alignment WSDOT Capacity Improvement $35.00 6/7/10 Operationally Complete

ARRA Discretionary Program Local Agency Project Project Type Stimulus Amount (millions) Status
Ferry Boat Skagit Co Guemes Ferry Terminal New Ferry Terminal $0.75 Operationally Complete

Tier 3 Projects


Agency Name Project Title Project Type Stimulus Amount (millions) Ad Date Status
WSDOT US 195/Idaho State Line to Colton Paving $2.15 2/8/10 Operationally Complete
WSDOT SR 503/1mi East of Rock Creek Bridge to Fredrickson Road Paving $1.87 2/22/10 Operationally Complete
WSDOT SR 14/I-5 to SE 164th Avenue Interchange Paving $2.09 6/14/10 Operationally Complete
WSDOT US 97/Orondo Northward - Paving Chip Seal $0.85 2/22/10 Operationally Complete
WSDOT US 97/Okanogan to Riverside Chip Seal $1.29 2/16/10 Operationally Complete
WSDOT US 97/Pateros South Chip Seal $0.49 2/16/10 Operationally Complete
WSDOT SR 26/Royal City East Chip Seal $0.84 2/16/10 Operationally Complete
WSDOT SR 26/Grant County Line to Othello Resurfacing $1.30 9/7/10 Operationally Complete
WSDOT US 395/Lee Road to Jct I-90 Paving $4.70 9/20/10 Operationally Complete

Ferry Projects


Project Title
Project Type
Stimulus Amount (millions)
Ad Date Status
Ferries - Vessel Preservation Vessel Preservation
$7.88

4/09 Operationally Complete
Ferries - Terminal Seismic Retrofit Terminal Preservation
$0.61
10/09 Operationally Complete

Ferry projects are funded through PSRC Federal Transit Administration Funding



Last revised on July 11, 2014