Agency NameProject TitleProject TypeStimulus Amount (millions)Ad DateStatus
WSDOT US 101/SR 103 Fort Columbia - Long Beach - Paving
Asphalt Preservation
$0.39

3/9/09 Operationally Complete
WSDOT I-90/Yakima River to W Ellensburg - Paving
Asphalt Preservation
$2.43

3/9/09 Operationally Complete
WSDOT I-90/Slide Curve to Cabin Creek - Paving
Concrete Preservation
$2.97

3/9/09 Operationally Complete
Redmond NE 36th Street Bridge Capacity Improvement $4.60 3/13/09 Contract Awarded / Under Construction
WSDOT SR 17/Grant County Airport North - Paving
Asphalt Preservation
$4.10

3/23/09 Operationally Complete
WSDOT SR 282/Ephrata South - Paving
Asphalt Preservation
$2.00

3/23/09 Operationally Complete
WSDOT I-405/NE 8th St to SR 520 Ramps
I: Nickel / TPA Funding
$30.00
Deer Park Crawford Avenue Phase V Preservation / Safety $1.67 3/30/09 Operationally Complete
Conconully Main Street / East Lake Street Overlay Preservation $0.13 4/1/09 Operationally Complete
Lynden Grover Street Freight / Safety $0.98 4/1/09 Contract Awarded / Under Construction
WSDOT SR 155/Omak Eastward - Chip Seal Asphalt Preservation
$0.98 4/6/09 Operationally Complete
WSDOT SR 243/Mattawa Vicinity - Chip Seal Asphalt Preservation
$1.40 4/6/09 Operationally Complete
WSDOT SR 262/Potholes Reservoir Area - Chip Seal Asphalt Preservation
$1.20 4/6/09 Operationally Complete
Lynnwood I-5/196th St SW Interchange Bridge/Pedestrian Improvements (TE) Pedestrian Improvement $1.25 4/8/09 Contract Awarded / Under Construction
Spokane 5 Mile Road Preservation / Safety $0.13 4/8/09 Contract Awarded / Under Construction
Sedro-Woolley Fruitdale/McGarigle Road Project & SR9/Township Sidewalk Preservation / Safety $0.13 4/9/09 Contract Awarded / Under Construction
Sedro-Woolley SR9 Pedestrian/Bicycle Safety Improvement Project (TE) Bicycle & Pedestrian Improvements $0.00
Competitive bid no ARRA needed
4/9/09 Contract Awarded / Under Construction
WSDOT US 2/Monroe City Limit to Sultan - Overlay Asphalt Preservation
$1.90 4/13/09 Operationally Complete
WSDOT SR 14/Cliffs Rd to Chamberlain/Goodnoe Rd - Chip Seal
Asphalt Preservation
$0.51 4/20/09 Operationally Complete
WSDOT I-5- Koontz Rd to Harrison Avenue - Paving Asphalt Preservation
$3.50 4/20/09 Contract Awarded / Under Construction
WSDOT I-82/Granger to W Grandview WB - Dowel Bar Retrofit/Concrete Rehab Concrete Preservation
$6.97 4/20/09 Operationally Complete
WSDOT I-90/Lake Easton to Bullfrog I/C WB - Concrete Concrete Preservation
$17.60 4/27/09 Contract Awarded / Under Construction
WSDOT I-90/Snoqualmie Summit to Hyak WB - Dowel Bar Retrofit/Concrete Rehab Concrete Preservation
$3.35 4/27/09 Operationally Complete
WSDOT I-5/SR 532 vicinity to Starbird Rd vicinity - Concrete Rehab
Concrete Preservation
$7.18 4/27/09 Contract Awarded / Under Construction
WSDOT I-5, Marysville to Stillaguamish River ITS
Safety Improvement
$2.50 4/27/09 Contract Awarded / Under Construction
WSDOT US 97/Centerville Rd to Bickelton Rd & Satus Pass
Asphalt Preservation
$3.50 4/27/09 Operationally Complete
WSDOT US 395/Loon Lake to Immel Road - Paving
Asphalt Preservation
$6.80 4/20/09 Operationally Complete
WSDOT I-5/SR 16 Eastbound Nalley Valley Viaduct I: Nickel / TPA Funding
$7.80 5/2/11 Contract Awarded / Under Construction
WSDOT I-5 - North Kelso to Castle Rock Concrete Pavement Rehabilitation Concrete Preservation
$8.10 4/27/09 Contract Awarded / Under Construction
WSDOT US 2/Jct SR 211 to Newport - Paving
Asphalt Preservation
$6.33 5/4/09 Operationally Complete
WSDOT US 395/Spokane Co Line to Loon Lake - Paving Asphalt Preservation
$2.20 4/27/09 Operationally Complete
WSDOT SR 206/Jct US 2 to Bruce Road
Asphalt Preservation
$0.70 5/4/09 Operationally Complete
WSDOT I-90/Snoqualmie Pass Vicinity - Camera Replacement Safety Improvement
$0.10 5/19/09 Operationally Complete
WSDOT I-405/NE 195th to SR 527 (design build)
I: Nickel / TPA Funding
$40.00 5/6/09 Contract Awarded / Under Construction
WSDOT I-5/Port of Tacoma Rd to King County Line - Add HOV I: Nickel / TPA Funding
$35.38 6/1/09 Contract Awarded / Under Construction
WSDOT Rumble Strips - Statewide
Safety Improvement
$3.00 6/22/09 Contract Awarded / Under Construction
WSDOT Cable Barrier Retrofit - Statewide Safety Improvement
$9.00 6/22/09 Contract Awarded / Under Construction
WSDOT SR 501/Ridgefield Interchange - Rebuild Interchange I: Nickel / TPA Funding

$10.00 6/22/09 Contract Awarded / Under Construction
WSDOT SR 20/US 395/SR 26 HAR Site Upgrade Safety Improvement
$0.20 5/26/09 Contract Awarded / Under Construction
WSDOT I-82/Valley Mall Blvd - Rebuild Interchange
I: Nickel / TPA Funding
$30.80 11/16/09
WSDOT Lewis & Clark Bridge - Painting
Preservation Painting
$12.50 1/11/10
WSDOT I-90/Lake Easton to Big Creek Br EB Concrete
Concrete Preservation
$23.00 1/25/10
Aberdeen Heron Street Sidewalk Bulb-out Project (TE) Pedestrian / Safety $0.61 5/4/09 Operationally Complete
Adams Co. Lee Road - Phase 1 Preservation $0.76 5/28/09 Operationally Complete
Arlington 188th Street Pedestrian Trail (TE) Multi User Trail $0.12 7/9/09 Contract Awarded / Under Construction
Asotin Co. Scenic Way Pavement Overlay Project Preservation $0.64 6/17/09 Contract Awarded / Under Construction
Bainbridge Island Core 40 Shoulder Widening Program - Blakely Nonmotorized Project - Phase 2 (TE) Pedestrian Improvement $0.15 6/12/09 Operationally Complete
Battle Ground North Parkway Improvement, N 5th to Onsdorff Capacity Improvement $0.45 8/5/09 Contract Awarded / Under Construction
Bellingham 2009 Pedestrian Crossing Safety ($128,448 TE) Pedestrian Improvement $0.30 5/28/09 Contract Awarded / Under Construction
Benton City 7th Street: Ellen Avenue to North City Limits Pedestrian Improvement $0.21 7/20/09 Contract Awarded / Under Construction
Benton Co. Webber Canyon Road: Kiona to I-82 and Kiona Roads Preservation / Safety $1.00 6/24/09 Contract Awarded / Under Construction
Blaine Boblett Street Access Improvement $0.35 7/1/09 Contract Awarded / Under Construction
Bothell North Creek Trail - Section 1, Stage 2 (Schnitzer) (TE) Multi User Trail $0.50 8/19/09 Contract Awarded / Under Construction
Bothell North Creek Trail - Section 2, Stage 2 (Canyon Park) (TE) Multi User Trail $0.60 8/19/09 Contract Awarded / Under Construction
Burien 4th Avenue SW Pedestrian Safety Project (TE) Bicycle & Pedestrian Improvements $0.63 6/8/09 Contract Awarded / Under Construction
Camas Leadbetter Drive, Lake Rd. to Parker St. Capacity Improvement $0.45
Castle Rock Riverfront Trail Restoration (TE) Bicycle & Pedestrian Improvements $0.07 6/23/09 Contract Awarded / Under Construction
Chelan Co. North Road Improvement & Pathway Under Railroad Trestle Access & Safety Improvements $1.02 4/28/09 Operationally Complete
Cheney Spangle Road Improvement Project Preservation / Safety $0.70 7/15/09 Contract Awarded / Under Construction
Chewelah Court Street Bridge Replacement Capacity / Safety $0.35 7/23/09 Contract Awarded / Under Construction
Clallam Co. Lake Crescent Olympic Discovery Trail ($35,000 TE) Multi User Trail $0.34 5/5/09 Contract Awarded / Under Construction
Clallam Co. Mt. Pleasant Road Preservation / Safety $0.57 6/9/09 Contract Awarded / Under Construction
Clark Co. NE 99th Street, SR 503 to NE 137th Avenue Capacity Improvement $2.50 8/26/09 Contract Awarded / Under Construction
Colfax Fairview Street Overlay Preservation $0.14 7/14/09 Operationally Complete
College Place Whitman Drive Multi-use Path (TE) Multi User Trail $0.06 7/26/09 Operationally Complete
Community Transit Mountlake Terrace Park-N-Ride (Upper Parking Area) Park-N-Ride $0.43 FTA Transfer
Cowlitz Co. Coal Creek Road Reconstruction Preservation / Safety $1.06 6/23/09 Contract Awarded / Under Construction
Cowlitz Co. Hall Road Reconstruction Preservation / Safety $0.33 6/9/09 Contract Awarded / Under Construction
Cowlitz Co. West Side Highway/Whittle Creek Bridge Reconstruction Preservation / Safety $0.00
Competitive Bid
No ARRA Needed
5/13/09 Contract Awarded / Under Construction
Dayton Dayton Avenue Overlays Preservation $0.23 7/1/09 Operationally Complete
Dayton West Dayton Street Beautification (TE) Scenic Beautification $0.15 7/1/09 Operationally Complete
Eatonville SR 161: Rural Town Center & Corridor Program Reconstruction & Pedestrian Improvements $0.83 7/17/09 Contract Awarded / Under Construction
Edmonds Annual Asphalt Overlay Preservation $1.00 7/14/09 Advertised for Bids
Ellensburg Canyon Rd Overlay - I-90 to Umptanum Road Preservation $0.39 4/29/09 Operationally Complete
Everett Holly Drive Non-Motorized Improvements (TE) Bicycle & Pedestrian Improvements $0.38 5/20/09 Contract Awarded / Under Construction
Ferndale 2nd Avenue Access Improvement $1.54 7/8/09 Contract Awarded / Under Construction
Ferry Co. Bridge Creek Top East Preservation $0.37 6/23/09 Contract Awarded / Under Construction
Forks Bogachiel Way Preservation / Safety $0.16 6/24/09 Contract Awarded / Under Construction
Franklin Co. CRP 596 R170 Landslide Area - Phase I Reconstruction $0.75 6/25/09 Operationally Complete
Garfield Co. County Wide Pavement Preservation Preservation $0.23 Local Forces
Operationally Complete
Grandview Euclid Avenue Resurfacing Project Preservation $0.31 5/13/09 Operationally Complete
Grant Co. Bridge #244 - Road 3-NE East Low Canal Preservation $0.75 6/23/09 Contract Awarded / Under Construction
Grant Co. Fairgrounds Path (TE) Pedestrian Improvement $0.03 7/7/09 Contract Awarded / Under Construction
Grant Co. L-NE Overlay Preservation $0.49 4/21/09 Operationally Complete
Grays Harbor Co. Wynoochee-Wishkah Road 13 Corners Realignment Safety Improvement $0 Cancelled
Harrah Harrah Road Improvements Preservation $0.36 7/1/09 Operationally Complete
Hoquiam City Wide Pedestrian Safety and Mobility Improvement Phase II (TE) Pedestrian Improvement $0.20 7/13/09 Contract Awarded / Under Construction
Ilwaco Beards Hollow Overlook (TE) Scenic Beautification $0.10 8/5/09 Contract Awarded / Under Construction
Island Co. Ault Field Road Widening Capacity Improvement $1.35 4/29/09 Contract Awarded / Under Construction
Island Co. Bicycle Touring Enhancement (TE) Bicycle Improvement $0 Cancelled
Island Co. Roadway Preservation Preservation $0.33 6/22/09 Operationally Complete
Jamestown S'Klallam Tribe Jamestown Community Center to Blyn Road Trail Enhancement ($11,000 TE) Multi User Trail $0.11 Local Forces Operationally Complete
Jefferson Co. Center Road Overlay Phase 4 Preservation $0.36 4/22/09 Operationally Complete
Kalama First Street Phase II Preservation / Safety $0.42 7/1/09 Contract Awarded / Under Construction
Kelso 13th Avenue Overlay Preservation $0.29 5/27/09 Contract Awarded / Under Construction
Kennewick Columbia Overlook - Phase 1 (TE) Pedestrian Improvement $0.12 5/6/09 Operationally Complete
Kent East Valley Highway - S. 212th Street to SR 167 Capacity Improvement $2.00 6/16/09 Contract Awarded / Under Construction
Kettle Falls Kettle Falls Pedestrian Improvements (TE) Pedestrian Improvement $0.04 7/21/09 Contract Awarded / Under Construction
King Co. SW 98th Street Phase I Pedestrian Corridor (TE) Pedestrian Improvement $1.27 5/7/09 Contract Awarded / Under Construction
Kittitas Co. Guardrail Hazard Elimination Projects (Safety) Safety Improvement $0.42 6/18/09 Contract Awarded / Under Construction
Kittitas Co. Yakima River Canyon Center Phase I (TE) Scenic Beautification $0.04 6/18/09 Operationally Complete
Klickitat Co. Bickleton Hwy (MP 6.90 to 9.65) Freight $0.26 6/24/09 Contract Awarded / Under Construction
Klickitat Co. Foster Loop Trail Phase 1 (TE) Pedestrian Improvement $0 Cancelled
Klickitat Co. South Columbus (MP 0.77 to 3.16) Freight $0.54 6/24/09 Contract Awarded / Under Construction
La Conner Maple Street Overlay and Sidewalks Preservation and Pedestrian Improvement $0.19 6/3/09 Operationally Complete
Lacey Lacey Woodland Regional Trail ($6,965 TE) Multi User Trail $1.00 4/30/09 Contract Awarded / Under Construction
Lewis Co. Davis Lake Road MP 0.33 to 2.62 Preservation $1.03 6/1/09 Operationally Complete
Lewis Co. Jackson Highway MP 1.22 to 2.81 Preservation $0.78 6/1/09 Operationally Complete
Lincoln Co. Kiner Road No. 9115, Phase 1 - MP 8.80 to 13.04 Preservation $0.65 5/28/09 Operationally Complete
Lummi Tribe Haxton Way / Red River Pedestrian Path Pedestrian Improvement $0.25
Marysville Street Overlay Project Preservation $0.50 7/1/09 Operationally Complete
Mason Co. McEwan Prairie Road HMA Overlay (Countywide Paver) Preservation / Freight $0.29 6/25/09 Operationally Complete
Mason Co. Solar Lighted Intersections - Safety Safety Improvement $0.15 6/4/09 Contract Awarded / Under Construction
McCleary Simpson Avenue Sidewalks ($47,680 TE) Pedestrian Improvement $0.23 9/28/09 Advertised for Bids
Moses Lake Lakeshore & Peninsula Reconstruction 2009 Preservation $1.20 7/3/09 Contract Awarded / Under Construction
Mount Vernon Laventure/Anderson Extension (Phase 1-Fowler to Blackburn) Access Improvement $0.92 6/9/09 Contract Awarded / Under Construction
Mountlake Terrace 52nd Avenue Reconstruction Project Preservation $1.00 5/15/09 Contract Awarded / Under Construction
Moxee Beaudry Road Improvement Project Preservation / Safety $0.50 6/22/09 Operationally Complete
Mukilteo/ Snohomish Co. Harbour Pointe Boulevard Street Reconstruction Preservation $1.10 5/27/09 Contract Awarded / Under Construction
Naches 2nd Street and 3rd Street Resurfacing Project Preservation / Safety $0.33 6/24/09 Operationally Complete
Normandy Park 1st Avenue South, Phase 2A, Multi-modal Enhancements (SW 192 to SW 200) (TE) Bicycle & Pedestrian Improvements $3.83 5/27/09 Contract Awarded / Under Construction
Olympia Union Avenue Overlay Preservation $1.20 6/3/09 Contract Awarded / Under Construction
Omak Okoma Drive/SR 215 Sidewalk Project (from 4th Ave. to Jasmine St.) ($26,967 TE) Pedestrian Improvement $0.18 6/24/09 Operationally Complete
Oroville 5th Ave./97 to 23rd Ave./97 (SR 97 MP 331.22 to 332.70) Pedestrian Improvement $0.49 7/8/09 Contract Awarded / Under Construction
Orting SR 162 Rechannelization Access Improvement $0.42 6/9/09 Contract Awarded / Under Construction
Pacific Co. Sandridge Road Overlay & Signalization Project Preservation / Safety $0.28 6/9/09 Operationally Complete
Pasco Powerline Road Access Improvement $0 Cancelled
Pend Oreille Co. Deer Valley Road: MP 7.84 to 9.55 Preservation $0.47 7/1/09 Contract Awarded / Under Construction
Port Angeles Peabody Street - 5th to 8th Preservation / Safety $0.39 6/7/09 Contract Awarded / Under Construction
Port of Everett/ Everett W Marine View Dr Roadway Ped/Bike Corridor Improvements (11th to 16th) Bicycle & Pedestrian Improvements $1.90 7/13/09 Advertised for Bids
Port of Pasco Intermodal Rail Project Phase 5 Freight Rail $0.22
Port of Tacoma Lincoln Avenue Grade Separation Freight $15.41 5/29/09 Contract Awarded / Under Construction
Port of Vancouver West Vancouver Freight Access Project Freight Rail $2.50 9/24/09 Contract Awarded / Under Construction
Port Townsend Upper Sims Way Improvements A & B Safety Improvement $1.96 7/5/09 Contract Awarded / Under Construction
Poulsbo Viking Avenue Improvements Phase II (McDonalds to SR305) Preservation & Capacity Improvement $3.80 5/1/09 Contract Awarded / Under Construction
Prosser Sheridan Avenue Improvements - Phase I Preservation / Safety $0.47 5/20/09 Operationally Complete
Pullman College Hill Arterial Reconstruction Preservation $0.36 5/29/09 Operationally Complete
Puyallup Phase III Shaw Road Extension Project Freight $1.20 5/27/09 Contract Awarded / Under Construction
Rainier Minnesota Street N. of SR 507 Overlay & Enhancements ($158,000 TE) Preservation / Safety $0.78 6/26/09 Contract Awarded / Under Construction
Renton Rainier Ave S (SR 167) Improvements Project - Phase 1: Shattuck Avenue Stormwater Bypass Capacity Improvements $2.00 6/24/09 Contract Awarded / Under Construction
Richland First Street Improvements Preservation $1.60 7/6/09 Contract Awarded / Under Construction
Ridgefield Hillhurst Road Overlay Project Preservation $0.20 7/29/09 Operationally Complete
Sammamish East Lake Sammamish Parkway - NE Inglewood Hill Road to NE 28th Place Capacity Improvement $3.50 7/15/09 Contract Awarded / Under Construction
San Juan Co. Fisherman Bay Road (MP 0.43 to 2.19) Preservation $0.42 4/14/09 Operationally Complete
Seattle S. Spokane Street Viaduct Preservation $15.40 5/14/09 Contract Awarded / Under Construction
Selah Speyers Road Improvements Preservation $1.60 6/29/09 Contract Awarded / Under Construction
Sequim East & West Washington Street Sidewalk Improvements (TE) Pedestrian Improvement $0 Cancelled  
Skamania Co. Cascade Drive Pedestrian Walkway (TE) Pedestrian Improvement $0.01 6/16/09 Operationally Complete
Skamania Co. Wind River Road (MP 0.00 - 1.00) Preservation $0.31 6/16/09 Operationally Complete
Skokomish Tribe SR 101/t3ba'das Parkway Intersection & Safety Improvements Safety Improvement $0.82
Snohomish Co. Granite Falls Alternate Route Freight $0.00
Competitive bid no ARRA needed
5/13/09 Contract Awarded / Under Construction
Spokane Fish Lake Trail ($308,679 TE) Bicycle & Pedestrian Improvements $0.78 6/3/09 Contract Awarded / Under Construction
Spokane Havana Street Bridge Capacity / Safety $2.54
Spokane Co. 5 Mile + Strong Road - Project 1 Preservation/Safety $0.86 5/15/09 Operationally Complete
Spokane Co. Rutter Parkway Preservation / Safety $0.45 5/15/09 Operationally Complete
Spokane Valley Sprague Avenue Resurfacing Project #1 Preservation $2.61 4/17/09 Operationally Complete
Stanwood 68th Road Realignment and School Safety Improvement Project Access & Pedestrian Safety $0.75 6/21/09 Operationally Complete
Stevens Co. County Wide Pavement Preservation Preservation $0.98 4/23/09 Operationally Complete
Sumas Bob Mitchell Avenue Preservation $0.12 6/1/09 Operationally Complete
Sunnyside Yakima Valley Highway at Lincoln Ave. Intersection Preservation $0.15 7/23/09  Contract Awarded / Under Construction
Tenino Sussex Avenue Street Illumination Safety Improvement $0.55 6/24/09 Contract Awarded / Under Construction
Thurston Co. Old Highway 99 Turn Lane, N. of Great Wolf Lodge Safety Improvement $0.28 11/17/09 Advertised for Bids
Thurston Co. Prairie Creek Bridge Replacement Capacity Improvement $1.05 11/17/09 Advertised for Bids
Thurston Co. Steilacoom Road Pedestrian Enhancements (TE) Pedestrian Improvement $0.11 6/2/09 Operationally Complete
Toppenish S. Toppenish Ave. and Washington Ave. Improvements Preservation $0.29 6/24/09 Operationally Complete
Tulalip Tribe 116th/34th Avenue NE Fish Passage Culvert Improvement / Preservation $1.40 6/26/09 Contract Awarded / Under Construction
Tumwater Capitol Boulevard Preservation Project - Dennis to Israel Preservation $0.15 6/3/09 Operationally Complete
Tumwater Capitol Boulevard Sidewalk and Bike Lane Project ($158,000 TE) Bicycle and Pedestrian Improvements $0.30 6/3/09 Operationally Complete
Union Gap N. Rudkin, and Main/Ahtanum Rd Intersection Overlay Preservation $0.26 6/24/09 Contract Awarded / Under Construction
Union Gap Wide Hollow Creek Pathway - Phase 2 (TE) Bicycle and Pedestrian Improvements $0.12 6/24/09 Operationally Complete
Vancouver Downtown Vancouver Waterfront Access Project Access Improvement $2.50
Wahkiakum Co. / WSDOT SR 4/Pave West Little Island Road Preservation $0.20 5/11/09 Contract Awarded / Under Construction
Walla Walla 13th Avenue Improvements: Rose to Rees Preservation / Safety $1.98 7/24/09 Contract Awarded / Under Construction
Wapato Camas Avenue Grind And Overlay Project Preservation $0.31  7/9/09 Operationally Complete 
Washougal SR 14 Pedestrian Tunnel ($285,276 TE) Pedestrian Improvement $0.59 4/30/09 Contract Awarded / Under Construction
Wenatchee Historic Pipeline/Pedestrian Bridge ($73,370 TE) Preservation $1.51 7/9/09 Contract Awarded / Under Construction
Whatcom Co. Scott Ditch Bridge Preservation $0.60 6/17/09 Contract Awarded / Under Construction
Whitman Co. Wawawai Road Overlay Preservation $0.90 6/18/09 Operationally Complete
Wilbur / WSDOT US 2/Wilbur Walkway to Sports Complex Pedestrian Improvement $0.16 5/26/09 Contract Awarded / Under Construction
Yakima Nob Hill Boulevard Improvements Pedestrian Improvement $0.77 6/23/09 Operationally Complete
Yakima Co. Terrace Heights Drive Preservation $0.40 5/20/09 Operationally Complete

 

Tier 2 Projects (what is a Tier 2 project?)

Agency NameProject TitleProject TypeStimulus Amount (millions)Ad DateStatus
WSDOT I-90 - Moses Lake - Paving
Asphalt Preservation $4.01 6/15/09 Operationally Complete
WSDOT I-5 Martin Way to 48th St Dowel Bar/Panel replacement Concrete Preservation
$10.80
WSDOT I-5 - Todd Rd Vic to Kelso Weigh Station Vic. Asphalt Preservation
$3.13
   
WSDOT US 195/Hatch Rd to Jct I-90 - Dowel Bar Retrofit Concrete Preservation $2.86 7/28/09 Contract Awarded / Under Construction
WSDOT I-90 - Two Way Transit - Dowel Bar Retrofit Concrete Preservation
$9.0  11/2/09 Advertised for Bids 
WSDOT I-82 - Granger to W Grandview - EB Dowel Bar Retrofit and Concrete Rehab Concrete Preservation
$11.4
WSDOT I-5 - North Kelso to Castle Rock - Concrete Rehab Asphalt Preservation
$6.0
11/2/09 Advertised for Bids
WSDOT US 97 - S of Chelan Falls – Add Passing Lane Safety Improvement $1.6    
WSDOT Dawley to Blyn Passing lanes Safety Improvement $8.1    
WSDOT The two noise wall projects along I-5 in Thurston County Environmental Retro-fit $8.1    
WSDOT US 101 - Astoria-Megler Bridge Main Span Painter Bridge Preservation
$12.5    
Local AgencyProject TitleProject TypeStimulus Amount (millions)Ad DateStatus
Wahkiakum Co. Wahkiakum Ferry Terminal Terminal Preservation $0.59 7/14/09 Contract Awarded / Under Construction
Grandview "Alive" Downtown Improvements - Phase 1  Preservation/Safety $2.03
Skagit Co/ Anacortes 6th Street Reconstruction  Preservation $0.70
Columbia Co Patit Creek Overlay  Preservation $0.47
Bellingham   Bakerview & Hannegan/Woburn  Preservation $1.60
Puget Sound Regional Council (PSRC) PSRC ARRA Contingency    
Monroe US 2/Chain Lake Road/ N Lewis Street (SR 203) Intersection Improvements Capacity Improvements $2.95 11/10/09 Advertised for Bids
Lake Stevens Lundeen Parkway Roundabout Access Improvement $0.92 9/2/09 Contract Awarded / Under Construction
Port of Bremerton Cross-SKIA Connector - Phase 1 Safety Improvement $3.0 8/25/09 Contract Awarded / Under Construction
Port of Seattle E. Marginal Way (Grade Separation) Access Improvement $3.41 7/21/09 Contract Awarded / Under Construction
Mountlake Terrace 230th Reconstruction Project (56th to 61st Avenues) Safety Improvement $0.96
North Bend North Bend Park and Ride Access Improvement $0.23
University Place Intermodal Transit Facility - Phase 2 Access Improvement $0.80
Arlington Gifford Avenue Sidewalk Pedestrian Improvement $0.09
Snohomish County 84th St. NE Overlay (SR-9 to 99th Ave. NE and 131st Ave NE to SR-92) Asphalt Preservation $0.50
Southwest Washington Regional Transportation Council (RTC) Economic Stimulus Project Selection    
Spokane Regional Transportation Council (SRTC) STRC ARRA List    
Spokane Co. 5 Mile + Strong Road - Project 2 Asphalt Preservation $0.33 7/31/09 Operationally Complete
ARRA Discretionary ProgramLocal AgencyProjectProject TypeStimulus Amount (millions)Status
Ferry Boat Skagit Co Guemes Ferry Terminal  New Ferry Terminal $0.75 Advertised for Bids

 

Ferry Projects

Project Title
Project Type
Stimulus Amount (millions)
Ad Date Status
Ferries - Vessel Preservation Vessel Preservation
$5.88

4/09
Ferries - Terminal Seismic Retrofit Terminal Preservation
$0.61
10/09

Ferry projects are funded through PSRC Federal Transit Administration Funding