On-Time Performance
As part of efforts to improve accountability and track performance, WSF posts on-time performance statistics for all routes each month.
Past on-time performance reports
Vessel Incident Investigations
WSF conducts formal investigations of vessel incidents to identify the causes of the incidents and how to prevent them from recurring. Managers and subject matter experts from different departments of WSF work as a team to complete these investigations. You can read about the investigations in the WSDOT Lessons Learned System.
- M/V Wenatchee Hard Landing at Pier 52 Seattle - Aug. 30, 2009
- M/V Sealth Shaft Bearing Failure - Feb. 3, 2010
- M/V Kitsap Hull Crack - Discovered March 9, 2010
- M/V Hyak Damage Sustained during Berth Shift - March 26, 2010
- M/V Hyak Hard Landing - March 27, 2010
- M/V Wenatchee Emergency Shut Down at Colman Dock/Pier 52 - June 9, 2010
- M/V Sealth Allision - Aug. 1, 2010
- M/V Evergreen State Allision - Aug. 22, 2010
- M/V Chetzemoka Keel Cooler Leak - Aug. 6, 2011
- M/V Salish Aborted Landing - Sept. 26, 2011
- M/V Yakima Allision with Anacortes Dolphin - Oct. 4, 2011
- M/V Yakima Thrust Bearing Damage - Oct. 7, 2011 and Jan. 6, 2012
- M/V Kittitas Failure of the Controllable Pitch Propeller Telescoping Oil Tube - Oct. 16, 2011
- M/V Chetzemoka Propeller Cracking - Nov. 16, 2011
- M/V Tacoma Investigation of Crankshaft Damage #1 Main Diesel Engine - Dec. 8, 2011
- M/V Walla Walla Investigation into the Circumstances Surrounding the Damage to the Propulsion Drive Motor - Nov. 4, 2012 (pdf 677 kb)
- Attachment 1 Drive Motor Damage and Repair Photos (pdf 964 kb)
- Attachment 2 Technical Specifications and Change Orders (pdf 753 kb)
- Attachment 3 Delta Electric Motors Purchase Order (pdf 303 kb)
- Attachment 4 Drive Motor Contamination Email and Photo (pdf 225 kb)
- Attachment 5 Delta Electric Drive Motor Condition Report (pdf 1 MB)
- Attachment 7 Capacci Email Starting Investigation (pdf 146 kb)
- Attachment 8 Capacci Email Directing Formal Investigation (pdf 101 kb)
- Attachment 9 Diagrams of “A Loop” and “B Loop” (pdf 493 kb)
- Attachment 10 Commutator Condition Charts (pdf 274 kb)
- Attachment 11 GE Gwg 403C1236EK-Yoke & Brush Rigging Assembly (pdf 44 kb)
- Attachment 12 GE Gwg 40SE1047AH-Wound Frame Brush Rigging Assembly (pdf 55 kb)
- Attachment 13 Instructions for Plant Line Up, Method 1 (pdf 35 kb)
- Attachment 14 Plant Line Up Diagram (pdf 419 kb)
- Attachment 15 Instructions for Plant Line Up, Method 2 (pdf 43 kb)
- Attachment 16 GE Dwg 4004D1155BK – Diagram of Connections (pdf 293 kb)
- Attachment 17 GE Dwg 4003C1339BS – Conduit Box Assembly (pdf 225 kb)
- Attachment 18 Lock Out/Tag Out Log (pdf 268 kb)
- Attachment 19 Statement of Cynthia Bruner (pdf 9 kb)
- Attachment 20 Statement of Bruce Cooper (pdf 51 kb)
- Attachment 21 Statement of John Settles (pdf 44 kb)
- Attachment 23 Statement of Reynaldo Esteban (pdf 202 kb)
- Attachment 24 Statement of Stavros (Steve) Sourelos (pdf 37 kb)
- Attachment 25 Statement of Steve Carpine (pdf 16 kb)
- Attachment 26 Statement of Mark Levang (pdf 41 kb)
- Attachment 27 Cadick Corp. Engineering Investigation Report (pdf 424 kb)
Attachments to Attachment 27
- Delta Electrics Report (pdf 104 kb)
- Lock Out Tag Out Manual (pdf 1.2 MB)
- Motor Outline (pdf 62 kb)
- Ship Alarm and Monitoring System pages 1-4 (pdf 3 MB)
- Ship Alarm and Monitoring System pages 5-8 (pdf 3.1 MB)
- Statements (pdf 171 kb)
- Tag Out Log (pdf 1.2 MB)
- Attachment 28 Cadick Corp. Follow-up Statement (pdf 13 kb)
WSDOT Ferries Division Fiscal Year 2012 Performance Report
Full Report (pdf 1.75 MB)
Executive Summary (pdf 540 kb)
This document from the Washington State Office of Financial Management represents the first comprehensive report on performance measures of WSF. While WSF has reported in the WSDOT Gray Notebook for ten years, this report provides expanded information on the accomplishments and completion of significant milestones related to the performance measures prescribed in RCW 47.64.360.
Continuing the Ferries Division Reform
Passenger Vessel Association Expert Panel Report Sept. 7, 2010
WSDOT Response and Action Plan Nov. 16, 2010 (pdf 2 MB)
Passenger Vessel Association WSF Governance Study Dec. 21, 2010
(pdf 2.46 MB)