wsdot1b1.gif (2812 bytes)

Memorandum

TO: DeWayne Wilson/Gary Battin
FROM: C. C. Ruth
DATE: July 16, 1998
SUBJECT: Posting Bridge Design Schedule

In accordance with DeWayne Wilson’s memo of July 16, 1998, I approve the recommendation ot post the Bridge Design Schedule (for all Regions). The posted Bridge Design Schedule should be updated at least once every two months.

CCR

cc:     M. M. Lwin

         K. N. Kirker

         Y. A. Mhatre

         R. T. Shaefer

         J. VanLund