SHORT TERM ISSUE #4 LEAD MEMBERS PROBLEM STATEMENT CURRENT PROCESS DESIRED OUTCOME PROPOSAL DETAILS PROS CONS SCH'D FOR IMPLEM. TESTING PERF. MEASURES LETTER TO SPONSORS
  EXPECTATIONS FOR DESIGN REVIEWS FOR PROJECTS WITH STRUCTURES Bob Fernandez COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 2/10/06 COMPLETE 3/17/06
LONG TERM ISSUE #4  -  DETERMINING ENVIRONMENTAL REQUIREMENTS                    
  PROPOSALS LEAD MEMBERS PROBLEM STATEMENT CURRENT PROCESS DESIRED OUTCOME PROPOSAL DETAILS PROS CONS SCH'D FOR IMPLEM. TESTING PERF. MEASURES LETTER TO SPONSORS
1 PERFORMANCE BASED CRITERIA and APPROVAL SYSTEM Steve Aisaka COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 5/12/06 COMPLETE REVISED 6/9/06 COMPLETE 10/13/06
2 PROCESS FOR UTILIZING WSDOT STANDARD SPEC. IN ENV. DOCUMENTS AND PERMITS Paul Wolf / Ron Lewis COMPLETE REVISED 9/8/06 COMPLETE REVISED 9/8/06 COMPLETE REVISED 9/8/06 COMPLETE 9/8/06 COMPLETE 9/8/06 COMPLETE 9/8/06 COMPLETE 9/8/06 COMPLETE 9/8/06 COMPLETE 9/8/06 COMPLETE 10/13/06
3 DOCUMENT DECISIONS Jerry Dorn     Paul Wolf Revised 10/13/16 Revised 10/13/16 Revised 10/13/16 Revised 10/13/16 Revised 10/13/16 Revised 10/13/16 Revised 10/13/16 Revised 10/13/16 Revised 10/13/16  
4 MONITOR AND TRACK LOCAL LEVEL REGULATIONS Paul Wolf       Discussed 2/10/06 Discussed 2/10/06 Discussed 2/10/06        
5 CROSS TRAINING - Environmental and Engineering Paul Wolf       Discussed 10/13/06            
6 BDM - Construction Methods Dick Stoddard / Matt Preedy       Discussed 10/05            
2006 Issue Nominations LEAD MEMBERS PROBLEM STATEMENT CURRENT PROCESS DESIRED OUTCOME PROPOSAL DETAILS PROS CONS SCH'D FOR IMPLEM. TESTING PERF. MEASURES LETTER TO SPONSORS
  Co-Location for Projects with Structural Design   DIscussed 4/14/06 DIscussed 4/14/06     DIscussed 4/14/06 DIscussed 4/14/06        
  Electronic Signatures for WSDOT Structural Plans   Nominated 3/10/06                  
  Enineers' Cost Estimates for Construction    DIscussed 5/12/06 DIscussed 5/12/06 SHARING TOPIC - NO NEED TO DRAFT A PROCESS CHANGE RECOMMENDATION
  AASHTO /WSDOT Seismic Criteria   Nominated 4/14/06                  
  WSDOT Asbuilt Plan Updates – Who? How? When?    Nominated 5/12/06                  
  Conflicts between BDM and Design Memos   Discussed 10/13/06 Discussed 10/13/06