 |

|
 |
 |
 |
|
I-90 Snoqualmie Pass East, Alternative 2 Section 2, Lake Keechelus Segment
Project Info The design visualization for Alternative 2 of this project covers 5.4 miles of I-90 along Lake Keechelus from MP 55.1 to MP 60.6. An additional lane will be added in both directions making it a six-lane highway. The alignment will be modified to provide greater sight distance and drivability, and the existing concrete pavement will be replaced, providing a much smoother ride. Constructing bridges/tunnels will eliminate road closures due to avalanches.
For further information on this and other alternatives please click on the link below. I-90, Snoqualmie Pass East project home page
Watch "fly-over" animation (Approx. 5 MB, Windows Media Player required)
View panoramas
The WSDOT Design Visualization Group
|
|
Disclaimer: All design alternatives presented are conceptual or theoretical, based on preliminary planning data. Final design is possible only after all safety issues, environmental concerns, economic impacts and public input have been evaluated and optimum design established.
|
|