WSDOT home

Road & Bridge Restrictions for Oversize/Overweight Motor Vehicles

I-90, Milepost: 137.19, Direction: Both, Date Posted: 5/4/2016 1:35:00 PM, Original Date: 5/5/2016 12:00:00 AM
Overloads shall travel the centerline of the lanes in the direction of traffic with no other trucks within 500 ft. Due to Painting contract on the structure.
I-90, Milepost: 106 to 122, Direction: Both, Date Posted: 3/28/2016 9:34:00 AM, Original Date: 6/1/2016 12:00:00 AM
CONSTRUCTION SEASON NOTICE – June through August loads exceeding 12’ will "typically" be prohibited 24 hours each day, 7 days a week. there will be days periodically during this period that the restriction will be lifted. There is a possibility this restriction will extend past July 15 by a month or so; this Advanced Notice will be updated in April. NOTE: Please check CURRENT RESTRICTIONS for up-to-date, current week notifications.
I-90, Milepost: 137 to 138, Direction: Both, Date Posted: 3/28/2016 9:03:00 AM, Original Date: 5/2/2016 12:00:00 AM
CURRENT RESTRICTION: No loads over 14' wide both directions, Monday through Saturday from 6 am to 8 pm.