US 395, Milepost: 241.49 to 241.89, Direction: Both, Date Posted: 5/26/2015 9:36:00 AM, Original Date: 6/8/2015 12:00:00 AM
Effective June 8th to June 11th from 7am to 5pm daily, NO loads over 11' wide allowed. WSDOT crews will be conducting a bridge inspection.
US 395, Milepost: 228 to 223, Direction: Both, Date Posted: 5/6/2015 11:53:00 AM, Original Date: 5/18/2015 12:00:00 AM
Effective May 18th until further notice on SR 395 from mileposts 228 (Colville) to 223 (Arden), both directions- Expect construction delays with paving operations and consider alternate routes.
US 395, Milepost: 13.05 to 20.57, Direction: Both, Date Posted: 12/19/2012 9:48:00 AM, Original Date: 4/13/2009 12:00:00 AM
Thru traffic limited to 10' wide loads at all times. Detour by way of I-182 bridge. Requests for exemption contact Pasco DOT at 509-545-2202. *WSDOT Does Not Guarantee Height Clearances*