WSDOT home

Road & Bridge Restrictions for Oversize/Overweight Motor Vehicles

I-82, Milepost: 131.00 to 132.60, Direction: Both, Date Posted: 8/3/2017 3:25:00 PM, Original Date: 8/14/2017 12:00:00 AM
I-82, Both directions, milepost 131-132.60 (Columbia River Bridge/Umatilla Bridge) Due to only one lane, no loads over 14' wide 24/7. Note: Mobile homes with box width no wider than the 14' restriction are allowed. Eaves are limited to no more than 2 feet.