WSDOT home

Road & Bridge Restrictions for Oversize/Overweight Motor Vehicles

I-90, Milepost: 137.19, Direction: Both, Date Posted: 5/4/2016 1:35:00 PM, Original Date: 5/5/2016 12:00:00 AM
Overloads shall travel the centerline of the lanes in the direction of traffic with no other trucks within 500 ft. Due to Painting contract on the structure.
I-90, Milepost: 62 to 57, Direction: W, Date Posted: 4/29/2016 9:16:00 AM, Original Date: 5/31/2016 12:00:00 AM
CURRENT RESTRICTION: No loads over 10' wide westbound Monday through Saturday from 8pm to 9am each night. MP 62, Stampede Pass Interchange bridge crossing I-90 is closed and inaccessible until bridge is replaced.
I-90, Milepost: 57 to 62, Direction: E, Date Posted: 4/22/2016 4:41:00 PM, Original Date: 5/31/2016 12:00:00 AM
CURRENT RESTRICTION – No loads over 12’ wide Eastbound Monday through Saturday from 8 pm to 9 am each night. MP 62, Stampede Pass Interchange bridge crossing I-90 is closed and inaccessible until bridge is replaced.
I-90, Milepost: 106 to 122, Direction: Both, Date Posted: 3/28/2016 9:34:00 AM, Original Date: 6/1/2016 12:00:00 AM
CONSTRUCTION SEASON NOTICE – June through August loads exceeding 12’ will "typically" be prohibited 24 hours each day, 7 days a week. there will be days periodically during this period that the restriction will be lifted. There is a possibility this restriction will extend past July 15 by a month or so; this Advanced Notice will be updated in April. NOTE: Please check CURRENT RESTRICTIONS for up-to-date, current week notifications.
I-90, Milepost: 137 to 138, Direction: E, Date Posted: 3/28/2016 9:03:00 AM, Original Date: 5/9/2016 12:00:00 AM
CURRENT RESTRICTION: No loads over 14' wide Eastbound, 24 hours each day, 7 days a week until September.
I-90, Milepost: 93 to 84, Direction: W, Date Posted: 3/17/2016 11:15:00 AM, Original Date: 4/4/2016 12:00:00 AM
CURRENT RESTRICTION until June 30th – No loads over 13’ wide westbound, 24 hours each day, 7 days a week.
US 12, Milepost: 141 to 155, Direction: Both, Date Posted: 2/25/2016 8:38:00 AM, Original Date: 4/1/2016 12:00:00 AM
No loads over 10' wide, both directions. 24 hours a day, 7 days a week.
I-90, Milepost: 56 to 70, Direction: E, Date Posted: 2/25/2016 8:25:00 AM, Original Date: 4/1/2016 12:00:00 AM
CONSTRUCTION SEASON NOTICE – April 1 through mid November: Eastbound loads exceeding 10’ will "typically" be prohibited from 8pm-9am Monday through Friday nights (occasionally Saturday nights may be included). NOTE: Please check CURRENT RESTRICTIONS for up-to-date, current week notifications.
I-90, Milepost: 65 to 56, Direction: W, Date Posted: 2/25/2016 8:22:00 AM, Original Date: 4/1/2016 12:00:00 AM
CONSTRUCTION SEASON NOTICE – April 1 through mid November: Westbound loads exceeding 10’wide will "typically" be prohibited from 8pm-9am Monday through Friday nights (occasionally Saturday nights may be included). NOTE: Please check CURRENT RESTRICTIONS for up-to-date, current week notifications.
SR 203, Milepost: .24, Direction: Both, Date Posted: 12/3/2015 11:45:00 AM, Original Date: 12/3/2015 12:00:00 AM
Effective immediately Legal loads only, 105,500 max GVW. No over legal axle weight. Due to deterioration in the bridge.
SR 165, Milepost: 11.50, Direction: Both, Date Posted: 6/10/2015 12:59:00 PM, Original Date: 5/21/2013 12:00:00 AM
Legal weights only. Truck-25 Tons, Truck/Semitrailer-36 Tons, Truck/Trailer-40 Tons. Single axle NTE 20,000 and Tandem axles NTE 34,000.
I-90, Milepost: 17.12, Direction: E, Date Posted: 3/16/2015 8:23:00 AM, Original Date: 3/16/2015 12:00:00 AM
"All overloads shall travel in the left 2 lanes"
SR 153, Milepost: 4.22, Direction: Both, Date Posted: 8/27/2014 10:09:00 AM, Original Date: 4/22/2010 12:00:00 AM
20,500 lb per axle limit
SR 9, Milepost: 10.87, Direction: Both, Date Posted: 8/27/2014 9:00:00 AM, Original Date: 8/27/2014 12:00:00 AM
20,000 per axle for BL & CL-8, 40,000 for SA. This bridge crosses over SR-9, not a mainline bridge.
US 2, Milepost: 48.7, Direction: Both, Date Posted: 8/27/2014 8:31:00 AM, Original Date: 8/27/2014 12:00:00 AM
41,500 weight limit for SA
SR 285, Milepost: 4.36, Direction: S, Date Posted: 8/26/2014 4:03:00 PM, Original Date: 4/1/2002 12:00:00 AM
20,000 lbs per axle for CL-8 & 19,000 lbs per axle for BL.
SR 202, Milepost: 29.5, Direction: Both, Date Posted: 8/26/2014 3:55:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb per axle weight limit. OVERLOADS TRAVEL CENTERLINE OF BRIDGE, traffic control is required.
US 12, Milepost: 144.89, Direction: Both, Date Posted: 8/26/2014 3:42:00 PM, Original Date: 4/23/2010 12:00:00 AM
21,000 lb per axle weight limit
US 2, Milepost: 31.07, Direction: Both, Date Posted: 8/26/2014 3:41:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb per axle limit for BL.
SR 28, Milepost: 63.39, Direction: Both, Date Posted: 8/26/2014 3:19:00 PM, Original Date: 4/22/2010 12:00:00 AM
21,500 lbs per axle for BL
SR 522, Milepost: 20.50 to 20.82, Direction: Both, Date Posted: 4/15/2014 2:56:00 PM, Original Date: 12/21/2004 12:00:00 AM
Loads exceeding 14'6" wide require WSP escort to cross SR 522 @ MP 20.50 to MP 20.82 bridge. WSP to provide a rolling slowdown of the opposing lane to prevent opposing traffic on the bridge while crossing. In addition, all loads exceeding 14'6" require 1 front pilot, 1 rear pilot. *WSDOT Does Not Guarantee Height Clearances*
SR 10, Milepost: 103.76, Direction: Both, Date Posted: 10/24/2013 3:59:00 PM, Original Date: 10/24/2013 12:00:00 AM
CAUTION: Bridge height is 15'. If your height is over 14'10" alternate route is advised. *WSDOT Does Not Guarantee Height Clearances*
SR 202, Milepost: 21.8 to 26.1, Direction: Both, Date Posted: 9/12/2013 3:43:00 PM, Original Date: 7/1/2009 12:00:00 AM
SR 202 from milepost 21.8 to 26.1, both directions - No loads over 12'wide or 80' in load length. This is a permanent restriction. Detour is available. *WSDOT Does Not Guarantee Height Clearances*
SR 17, Milepost: 75.27 to 96.57, Direction: Both, Date Posted: 6/4/2013 8:19:00 AM, Original Date: 4/1/2009 12:00:00 AM
From April 1 to September 30, loads exceeding 12' wide may move Tuesday thru Thursday from 9:00 AM and 3:00 PM. Three pilot cars required, two front and one rear. Weather permitting. Contact Ephrata DOT at 509-754-2056. *WSDOT Does Not Guarantee Height Clearances*
SR 165, Milepost: 11.50 to 11.60, Direction: Both, Date Posted: 6/4/2013 8:17:00 AM, Original Date: 4/13/2009 12:00:00 AM
Loads exceeding 12 ft. wide are prohibited. *WSDOT Does Not Guarantee Height Clearances*
SR 123, Milepost: 7.5 to 16.34, Direction: Both, Date Posted: 6/4/2013 8:16:00 AM, Original Date: 4/13/2009 12:00:00 AM
No commercial traffic allowed. *WSDOT Does Not Guarantee Height Clearances*
SR 243, Milepost: 0.0 to 28.26, Direction: Both, Date Posted: 5/30/2013 1:39:00 PM, Original Date: 4/13/2009 12:00:00 AM
No loads over 16 feet wide allowed. Please contact the Ephrata Maintenance Office at 509-754-2056 for special considerations approval. *WSDOT Does Not Guarantee Height Clearances*
US 12, Milepost: 165.95, Direction: Both, Date Posted: 2/27/2013 2:15:00 PM, Original Date: 1/30/2013 12:00:00 AM
Effective immediately; US12 bridge #12/309 at MP 165.95, Both Directions: legal loads only. No over legal axle weights, max gross weight is 105,500. Due to damage on the bridge deck.
SR 9, Milepost: 10.87, Direction: Both, Date Posted: 2/5/2013 10:53:00 AM, Original Date: 11/15/2011 12:00:00 AM
This bridge crosses over SR9, it is not a mainline bridge.*WSDOT Does Not Guarantee Height Clearances*
SR 10, Milepost: 89.33, Direction: Both, Date Posted: 10/18/2011 3:12:00 PM, Original Date: 10/18/2011 12:00:00 AM
BL =20,000 lbs, CL-8 =20,000 lbs, SA = 40,000 lbs.
US 12, Milepost: 166 to 190, Direction: Both, Date Posted: 8/30/2011 3:13:00 PM, Original Date: 4/20/2010 12:00:00 AM
US-12, Mileposts 166 to 190 (Naches) Loads 14’ to 16’ wide will travel only from 11pm to 7am. Must provide detailed traffic control plan showing pull outs to allow traffic to pass also must include list of pullout locations and a back-up plan for breakdowns. 2 front pilots and 1 rear pilot required plus 1 WSP escorts. Loads over 16’ wide prohibited. Contact WSDOT SCR Area 2 Superintendent for any exceptions. This is a permanent restriction. **WSDOT does not guarantee height clearances**
US 12, Milepost: 138 to 166, Direction: Both, Date Posted: 6/10/2010 11:25:00 AM, Original Date: 9/18/2009 12:00:00 AM
Loads exceeding 14 feet wide must call the Chehalis Maintenance Office prior to movement. (360-740-8640 Office hours M-F 8a-4p)*WSDOT Does Not Guarantee Height Clearances*
SR 202, Milepost: 26, Direction: Both, Date Posted: 4/27/2010 2:44:00 PM, Original Date: 4/27/2010 12:00:00 AM
South side of city of Snoqualmie. 21,500 per axle weight limit
SR 165, Milepost: 11.9, Direction: Both, Date Posted: 4/27/2010 2:40:00 PM, Original Date: 4/27/2010 12:00:00 AM
20,000 lbs axle weight limit
SR 165, Milepost: 11.93, Direction: Both, Date Posted: 4/27/2010 2:38:00 PM, Original Date: 4/27/2010 12:00:00 AM
21,500 lb axle limit
SR 162, Milepost: 19.64, Direction: Both, Date Posted: 4/26/2010 2:28:00 PM, Original Date: 4/26/2010 12:00:00 AM
19,000 lb per axle limit
SR 169, Milepost: 5.2, Direction: Both, Date Posted: 4/26/2010 2:25:00 PM, Original Date: 4/26/2010 12:00:00 AM
1.5 mi W of City of Black Diamond. 20,000 lb per axle limit
SR 410, Milepost: 57.67 to 70, Direction: Both, Date Posted: 1/20/2010 7:44:00 AM, Original Date: 4/13/2009 12:00:00 AM
No commercial traffic permitted north entrance of Mt Rainier National Park. *WSDOT Does Not Guarantee Height Clearances*
SR 821, Milepost: .29 to 25.21, Direction: Both, Date Posted: 1/13/2010 3:21:00 PM, Original Date: 4/13/2009 12:00:00 AM
Closed May 15th thru September 15th of every year to "Commercial Truck Combinations" but remains open for single vehicles and local delivery combination vehicles. *WSDOT Does Not Guarantee Height Clearances*
SR 203, Milepost: 0 to 18, Direction: Both, Date Posted: 10/20/2009 12:01:00 PM, Original Date: 7/1/2009 12:00:00 AM
SR 203 from milepost 0 to 18, both directions- Thru traffic is limited to 12 feet wide and 80 feet in load length. Route open to local oversize movements. *WSDOT Does Not Guarantee Height Clearances*
US 2, Milepost: 118.46, Direction: E, Date Posted: 10/20/2009 11:39:00 AM, Original Date: 4/13/2009 12:00:00 AM
Left turns are prohibited Eastbound from US2 onto School Street. Contact Chelan County (509) 667-6415 for detour.(Suggest turn @ milepost 115.10 Easy Street) Overheight loads eastbound may need to exit US2 earlier to bypass restrictions on US 2 in Wenatchee. *WSDOT Does Not Guarantee Height Clearances*