SR 520 West Lake Sammamish Parkway to SR 202 HOV and SR 202 I/C

NOTE:
Some of the links on this page point to PDF documents, that require Adobe's Acrobat Reader to view. You may download it at no cost from Adobe's web site.

SR 520 West Lake Sammamish Parkway to SR 202 HOV and SR 202 I/C

*Please be advised that some of the documents in the links below are very large. They may take a few minutes to open on your screen!

  • Flyover Geotech Report

  • Infiltration Information

  • Luminaires Foundations Report

  • Sign Structure Foundation Report.pdf

  • Addendum 1 of the geotechnical report

  • Addendum 2 of the geotechnical report

  • Addendum_Bridge_520-42S_Soil_Springs_Values

  • Addendum_Bridge_520-46_Pier_2_Shaft_Option

  • Addendum_RNE_Bridge_and_Bridge_520-42S_PY_Curve_Data

  • Addendum_RNE_Bridge_and_Bridge_520-42S_Revised_DFSAP_Values

  • Addendum_RWN_Bridge_Revised_DFSAP_Values

  • Addendum_RWN_Bridge_Wall_RW-RWN4

  • Geotechnical_Report_ Bridge_520-46_and_Bridge_520-48A_Widening_6-9-08

  • Geotechnical_Report_Retaining_Walls_8-6-08

  • Geotechnical_Report_RNE &BR42S_Bridges_April_16_2008

  • Geotechnical_Report_RWN_Bridge_and_Walls_RWN_1,2,and_3_5-30-08

  • AGeotechnical_Report_Wall_F-1

  • Liquefaction_Study-Existing_Bridges_12-3-07

  • Sign_Structures_Foundation_Report_(update)_3-4-08

  • Jarpa 1-8-08

  • Final Stormwater Report