Washington State Department of Transportation
NewsSite IndexContact WSDOTWSDOT Home
Commute & TravelProjectsBusinessEnvironmentalMaps & Data
Contract Ad & Award  


Prequalification of Contractors
   
Contract Plans and Specifications
   
   
Contacts
   


I-5, SR 432 Talley Way Interchange Summary of Geotechnical Conditions and Soil Boring Logs

NOTE:
Some of the links on this page point to PDF documents, that require Adobe's Acrobat Reader to view. You may download it at no cost from Adobe's web site.

I-5, SR 432 Talley Way Interchange Summary of Geotechnical Conditions and Soil Boring Logs

*Please be advised that some of the documents in the links below are very large. They may take a few minutes to open on your screen!

The following Summary of Geotechnical Conditions and Soil Borings are made a part of contract 7835 by reference to this website in Section 1-02.4 of the contract Special Provisions. All planholders will be advised by formal addenda in the event any of these documents are revised or amended prior to the bid opening.

  • SR-5 Talley Way SR-432 Interchange Soil Borings.(pdf)

  • SR-5 Talley Way SR-432 Interchange Summary of Geotech Conditions

    Last updated: September 28, 2009


  •   Copyright WSDOT © 2002

        Traffic & Roads | Site Index | Contact WSDOT | WSDOT Business | WSDOT Home