Washington State Department of Transportation
NewsSite IndexContact WSDOTWSDOT Home
Commute & TravelProjectsBusinessEnvironmentalMaps & Data
Contract Ad & Award  

GEOTECHNICAL REPORTS

NOTE:
Some of the links on this page point to PDF documents, for which you will need Adobe's Acrobat Reader. You can download it at no cost from Adobe's web site if you do not have the software.

GEOTECHNICAL REPORTS

Please be advised that the documents and reports displayed on these pages are subject to addition or revision without notice . It is the responsibility of the users of these documents to ensure they are using the most up to date reports and documentation. The last update date is displayed at the bottom of the page.

  • SR 2, EAST OF ORONDO UNSTABLE SLOPES GEOTECHNICAL REPORTS

    SR 532 Corridor Improvements Geo tech data Posted 10/27/08

  • SR 99, ALASKAN WAY VIADUCT - REPLACEMENT S MASS TO RR WAY S ELEC LINE RELOC GEOTECHNICAL REPORTS

  • WSF, EAGLE HARBOR MAINTENANCE FACILITY GEOTECHNICAL REPORTS

  • STATE-WIDE RISK REDUCTION ROCK SLOPE SCALING PROGRAM GEOTECHNICAL REPORTS

  • SR 16, NEW TACOMA NARROWS BRIDGE WEST ANCHOR NOISE WALL

  • SR 500, 162ND AVE NOISE WALL

  • Contract 007217 I-90, TWO-WAY TRANSIT & HOV OPERATIONS STAGE 1

  • Contract 007064--SR 543, I-5 TO INTERNATIONAL BOUNDARY WIDENING & BORDER X-ING IMPROVEMENT GEO TECH REPORT

  • Contract 007080--SR 167, 15TH ST SW TO S 180TH ST STAGE 3 GEO TECH REPORT

  • Contract 007030--SR 202, SR 520 TO SAHALEE WAY WIDENING & CHANNELIZATION STAGE 2 GE0-TECHNICAL REPORT

  • Contract 007115--SR 395, Francis Avenue to US 2 GE0-TECHNICAL REPORT

  • Contract 007120--SR 270, PULLMAN TO IDAHO STATE LINE GEO-TECHNICAL REPORT

  • Contract 007082--SR 405 CANYON PARK FREEWAY STATION GEO-TECHNICAL REPORT

  • Contract 007107--SR 101, Hoquiam River Bridge and Simpson Avenue Bridge

  • Contract 007169--SR 142, BOWMAN CREEK FISH PASSAGE

  • Contract 007164-- SR 305 Hostmark Street Vicinity to Bond Road

  • Contract 007157--SR-99 S. 284th to S. 272nd HOV

  • PESHASTIN EAST INTERCHANGE

  • SR 28, EAST WENATCHEE 31ST TO HADLEY BOX CULVERT REPLACEMENT

  • SR 20, SIDNEY ST VICINITY TO SCENIC HEIGHTS RD VICINITY

  • DOWNTOWN PEDESTRIAN / BREMERTON TRANSPORTATION CENTER ACCESS IMPROVEMENTS

  • SR 20, FREDONIA TO I-5 WIDENING STAGE 1 GEO TECH REPORT

  • SR 520 West Lake Sammamish Parkway to SR 202 HOV and SR 202 I/C

  • I-5, SR 502 VICINITY INTERCHANGE

  • SCHLOMAN ROAD TO 258TH ST NE & 268TH I/S

  • SR 522, UNIVERSITY OF WASHINGTON/BOTHELL CASCADIA CC CAMPUS SOUTH ACCESS

  • US 395 NSC – Freya to Fairview Vicinity

  • I-90 Harvard Road Pedestrian Overcrossing (I-90, LIBERTY LAKE TR. UNDERPASS)

  • SR 548, TERRELL CREEK - MAJOR DRAINAGE

  • I-5 RUSH ROAD TO 13TH STREET

  • SR 542 BOULDER CREEK BRIDGE REPLACEMENT

  • SR 20, QUIET COVE RD VIC TO SR 20 SPUR STAGE 1

  • I-5, PORT OF TACOMA SOUTHBOUND ON-RAMP WIDENING PROJECT

  • SR 101 MP 338.2 Debris Flow

  • I-405, NE 10TH ST -BRIDGE CROSSING

  • US 395, US 395/NSC-BNSF RR TUNNEL

  • SR 4, EAST OF COUNTY LINE ROCKFALL

  • SR 101, WALKER CREEK BRIDGE REPLACEMENT

  • US12, FRENCHTOWN VICINITY TO WALLA WALLA ADD LANES

  • I-5, GRAND MOUND TO MAYTOWN STAGE ONE ADD LANES

  • SR 20, FREDONIA INTERCHANGE WIDENING STAGE 2

  • I-5, 5TH AVE NE TO NE 92ND ST NOISE WALLS

  • SR 539, TENMILE ROAD TO SR 546 WIDENING - STAGE 1

  • Vancouver Rail Project W. 39th Street Bridge Final Geotechnical Report revised 2/10/09

  • US 101, WEST FORK HOQUIAM BRIDGES NO. 101-142

  • SR 28, MP 11.83 TO 11.96 ROCK ISLAND SLOPE STABILIZATION STAGE 3 FINAL

  • SR 519, PHASE 2 BORING LOGS

  • THUNDER HILLS CULVERT REROUTE

  • SR 6, SOUTH FORK CHEHALIS RIVER BRIDGE 6/115 REPLACEMENT

  • WENATCHEE PEDESTRIAN TRAIL BRIDGE

  • SR 161 STONE CREEK NOISE WALL

  • C7552 New Tacoma Narrows Bridge, West Anchor Noise Wall, existing ground x-sections

  • SR-900 SE 78th to Newport Way

  • Summary of Geoconditions US 101,Purdy Creek Bridge Replacement

  • I-5/SR 16, WESTBOUND NALLEY VALLEY I/C

    US 395, NSC US 2 LOWERING GEOTECHNICAL REPORTS ftp site.

  • US97, NORTH OF BLEWETT PASS UNSTABLE SLOPES

  • SR 8 0.6 MILES EAST OF WINSLOW ROAD-UNSTABLE SLOPE

  • SR 169, GREEN RIVER BRIDGE EMBANKMENT FAILURE

  • SR 169 GREEN RIVER BRIDGE UNSTABLE SLOPES BORING LOGS

    Contract 7677 George Sellar Bridge Additional EB Lane geotech Posted 2/3/09

    George Sellar Bridge Additional EB Lane AS-BUILT Plans

  • Vashon Ferry Terminal Dolphins Replacement geotech report

  • I-90/ Snoqualmie Pass East - Phase 1A Hyak to Crystal Springs Detour (Pit site PS-S-255)

  • US 12 Tieton River Bridge - Final Grading Report

  • I-90/ Snoqualmie Pass East - Phase 1A Hyak to Crystal Springs Detour Geo Tech Report

    Contract 7707 SR 112, MAKAH RESERVATION TO US 101 STAGE 2 -SAFETY geotech Posted 4/6/09

    US 395, US 2 to Wandermere Vicinity geotech Posted 5/18/09

  • I-5 SR 501 Ridgefield Interchange Project - Geotech Report

  • Blewett Pass Vicinity Emergency Flood Repair stage 3

  • Emergency Slide Repair - 9 4 Miles West of Reynold Road

  • I-5, SR 432 TALLEY WAY INTERCHANGE BORING LOGS

    I-5 SR 432 Talley Way Interchange Geotech Report(Amended 11/20/09)

    I-5 SR-432 Talley Way Interchange Cross Sections - Amended 10/23/09 (pdf)

    AWV Holgate to King Geotech and Environmental data

    Stevens Pass Geotech reports

    I-82, Valley Mall Boulevard Geotech(pdf)

    SR 542, East Church Mountain Road Geotech(pdf)

    SR 27, Pine Creek Bridge Geotech(pdf)

    November 20, 2009


  •   Copyright WSDOT © 2002

        Traffic & Roads | Site Index | Contact WSDOT | WSDOT Business | WSDOT Home