SR 532 CORRIDOR IMPROVEMENTS DESIGN BUILD PROJECT

NOTE:
Some of the links on this page point to PDF documents, that require Adobe's Acrobat Reader to view. You may download it at no cost from Adobe's web site.

NOTICE TO DESIGN BUILDERS

  • WSDOT Announces Best Value Results 1/22/09

  • SR 532 Request for Proposal (RFP) 10-13/08

  • September 29, 2008 WSDOT Announces Short Listed Proposers

  • Short listed Proposers Contact list

    WSDOT will hold an informational meeting for potential submitters regarding the RFQ. The meeting will be held August 20, 2008, 1:15 p.m. to 3:00 p.m. at: WSDOT NW Regional Office, Cafeteria Conference Room, 15700 Dayton Avenue North, Shoreline, WA .

  • Notice to Design Builders RFQ Advertisement SR 532 CORRIDOR IMPROVEMENTS

    REQUEST FOR QUALIFICATION (RFQ)

  • RFQ August 1, 2008 SR 532 CORRIDOR IMPROVEMENTS

  • Submitters Voluntary Meeting Attendees

    Statement of Qualifications (SOQ) due before 4:00 PM September 5, 2008

  • Base and Options AGC Sept 18 2008

  • Seismic Response Study

  • Combined Boring logs

  • 20080715 PMX SR 532 SW Report

  • SR532 Otak Stormwater Report 071408

  • SR 532 Corridor Improvements (Bridge Segment) Stormwater Report

  • SR 532 Corridor Improvements (Camano Segment) Stormwater Report<

  • SR 532 Corridor Improvements, Camano Island to I-5 Design Build East Section BA draft

  • SR532 Corridor Improvement Design Build Project West Section BA

  • Corridor Draft Channelization Plans 071808 These plans are superceded by the file dated 08-08-08

  • Draft SR 532 Corridor Improvement plan 08-08-08 this document supercedes the Corridor Draft Channelization Plans 071808

  • Preliminary Bridge Data - Gen. Mark W. Clark

    The following links are to an FTP site where you may download the microstation dgn files for the referenced documents. The files are original format and are found in the folder named SR 532 Corridor files preiminary alignment File, Preliminary channelization plan, and existing basemap.

    Link to ftp site to download microstation preliminary alignment File, Preliminary channelization plan, and existing basemap.

    SR 532 Corridor Improvements AS-Built files. Posted 10/3/08

    SR 532 Corridor Improvements Geo tech data Posted 10/27/08

  • Continuation and Replacement of Boring GMWC-1A-08 Posted 11-7-08

    RFQ Questions and Answers

  • SR 532 RFQ Q&A 1 8/26/08

    ADDENDA

    PLAN HOLDERS LIST

  • Planholders list

    Last updated: November 7, 2008