Skip Top Navigation Skip to Content
Bid Tabulation Files for October 2010
Note: Some of the links on this page point to PDF documents, for which you will need Adobe's Acrobat Reader. You can download it at no cost from Adobe's web site if you do not have the software.
- CONTRACT 8032 Executed 10/29/10 US 101, SIMPSON AVE. BRIDGE PIER REPAIRS
- CONTRACT 8005 Executed 11/2/10 OLYMPIC REGION BASIC SAFETY RESTORATION 2010
- CONTRACT 8013 Executed 10/28/10 SR 26, GRANT COUNTY LINE TO SR 17 PAVING
- CONTRACT 8007 Executed 11/9/10 SR 302, KEY PENINSULA HWY TO PURDY VIC SAFETY AND CONGESTION - STAGE 1
- CONTRACT 8008 Executed 11/9/10 I-205/I-5 CLARK COUNTY RAMP PAVING
- CONTRACT 8019 Executed 11/10/10 WSF, MUKILTEO FERRY TERMINAL TRANSFER SPAN MECHANICAL AND ELECTRICAL
- CONTRACT 8010 Executed 11/1/10 SR 532, NORTH LEQUE ISLAND SLOPE PROTECTION
- CONTRACT 8025 Executed 11/16/10 MOTTMAN MODULAR RE-ROOF AND HVAC RENOVATION
- CONTRACT 8015 Executed 12/1/10 EASTERN REGION CHIP SEAL 2010 - HMA CONVERSIONS
- CONTRACT 7963 Executed 11/29/10 EASTSIDE TRANSIT AND HOV DESIGN BUILD
- CONTRACT 8020 Executed 11/15/10 WSF, ANACORTES FERRY TERMINAL OVERHEAD LOADING REHABILITATION
- CONTRACT 8012 Executed 11/16/10 SR 20, RED CABIN CREEK - CED
- CONTRACT 8012 Executed 11/16/10 SR 20, RED CABIN CREEK - CED INCLUDES WSU STUDENT BIDS
- CONTRACT 8024 Executed 11/16/10 NCR TRAFFIC CONTROLLER REPLACEMENT 2011
- CONTRACT 8017 Executed 11/12/10 US 395, LEE RD TO VIC JCT I-90 PAVING
- CONTRACT 8018 Executed 11/22/10 I-90, VIC GEIGER RD TO SPOKANE VIADUCT PCCP REHAB
- CONTRACT 8023 Executed 11/3/10 I-90, WB ALTAMONT VARIABLE MESSAGE SIGN REPLACEMENT
- CONTRACT 8026 SR 21, 1.4 MILES N OF MANILA CR RD - SLOPE STABILIZATION
- SR 31, PEND OREILLE COUNTY - WATERLINE REPLACEMENT
DECEMBER 2, 2010