Washington State Department of Transportation
NewsSite IndexContact WSDOTWSDOT Home
Commute & TravelProjectsBusinessEnvironmentalMaps & Data
Contract Ad & Award  


Bid Tabulation Files for March 2006

NOTE:
Some of the links on this page point to PDF documents, for which you will need Adobe's Acrobat Reader. You can download it at no cost from Adobe's web site if you do not have the software.

  • CONTRACT 7101 Executed 3//22/06--US 112, 1.76 MILES EAST OF SR 113 JUNCTION

  • CONTRACT 7086 Executed 3/27/06--SR 516, 208TH AND 209TH AVE SE-CHANNELIZATION-- It's your nickel watch it work.

  • CONTRACT 7094 Executed 3/21/06--SR 291 NINE MILE FALLS SAFETY IMPROVEMENTS

  • CONTRACT 7097 Executed 4/3/06--US 97 & SR 24, US 97 MP 33.52 TO MP 35.36 PAVING AND SR 24 & US 97 RUMBLE STRIPS

  • CONTRACT 7102 Executed 4/3/06--SR 17, MESA TO BASIN CITY ROAD-PAVING

  • CONTRACT 7099 Executed 3/22/06--SR 512, 104TH ST. E. TO SR 167 O/C PAVING

  • CONTRACT 7105 Executed 4/11/06--I-90, EAST CHANNEL BRIDGE 90/40N&S BRIDGE PAINTING

  • CONTRACT 7080 Executed 4/3/06--SR 167, 15TH ST SW TO S 180TH ST, STAGE 3

  • CONTRACT 7103 Executed 4/6/06--WSF, COLMAN DOCK PEDESTRIAN ACCESS CONTROL PROJECT

  • CONTRACT 7106 Executed 4/10/06--SR 202, 244TH AVE NE INTERSECTION SIGNALIZATION & CHANNELIZATION

  • CONTRACT 7114 Executed 4/14/06-- WSF, MUKILTEO/CLINTON TERMINALS PHYSICAL SECURITY INFRASTRUCTURE

  • CONTRACT 7112 Executed 3/30/06--I-5, CHERRY/COLUMBIA VIC MP 165.65 HS-ITS IMPROVEMENTS

  • CONTRACT 7111 Executed 4/10/06--I-90, ARGONNE TO SULLIVAN ROADSIDE RESTORATION

  • CONTRACT 7109 Executed 4/12/06--SR 20 ET AL, 2006 EASTERN REGION CHIP SEAL

  • CONTRACT 7117 Executed 4/13/06--SR 167, ELLINGSON ROAD I/C NB OFFRAMP SIGNALIZATION & CHANNELIZATION

  • CONTRACT 7104 Executed 4/7/06--SR 10 ET AL, 2006 REGION WIDE SEAL

  • CONTRACT 7107 All bids rejected 4/14/06--US 101, SIMPSON AVENUE BRIDGE 101/125W REHABILITATION

  • CONTRACT 7113 Executed 4/17/2006--I-5. SB RAMPS AT SR 11 SIGNALIZATION AND CHANNELIZATION

  • CONTRACT 7116 Executed 4/10/06--US 2, STEVENS PASS TO LEAVENWORTH - C/L RUMBLE STRIPS

  • CONTRACT 7119 Executed 4/24/06--SR 539, TEN MILE RD TO SR 546 TEST PILES

  • CONTRACT 7108 Executed 4/24/06--I-90, SPOKANE VIADUCT BRIDGE DECK RUTTING REPAIR

    Last Updated - MARCH 31, 2006


  •   Copyright WSDOT © 2002

        Traffic & Roads | Site Index | Contact WSDOT | WSDOT Business | WSDOT Home