Washington State Department of Transportation
NewsSite IndexContact WSDOTWSDOT Home
Commute & TravelProjectsBusinessEnvironmentalMaps & Data
Contract Ad & Award  


Bid Tabulation Files for January 2002

NOTE:
Some of the links on this page point to PDF documents, for which you will need Adobe's Acrobat Reader. You can download it at no cost from Adobe's web site if you do not have the software.

  • CONTRACT 6266 Executed 2/6/2002--SR 410, WHITE RIVER BRIDGE 410/101 REPAIRS

  • CONTRACT 6268 Executed 2/4/2002--006293SYSTEM WIDE OVERHEAD LOADING MODIFICATIONS

  • CONTRACT 6269 Executed 1/29/2002--SR 162, SR 410 TO OLD PIONEER WAY EAST

  • CONTRACT 6273 Executed 2/1/2002--US 12, US 12 SR 395 TO SNAKE RIVER - PAVING

  • CONTRACT 6278 Executed 2/1/2002--SR 5, 164TH STREET SW INTERCHANGE DRIVEWAY RELOCATION

  • CONTRACT 6274 Executed 2/6/2002--SR 2, TUMWATER ROCK SLOPES

  • CONTRACT 6282 Executed 2/6/2002--SR 410, JCT 241S AVE SE/MUD MTN ROAD

  • CONTRACT 6283 Executed 2/20/2002--SR 530, OLD MOOSE CREEK WEST AND EAST - CULVERT REPLACEMENT

  • CONTRACT 6275 Executed 2/8/2002--US 97, US 97/PATEROS TO BREWSTER - PAVING

  • CONTRACT 6277 Executed 2/27/2002--SR 405, SE 8TH ST I/C MODIFICATIONS DIRECT ACCESS

  • CONTRACT 6287 Executed 2/19/2002--US 2 SKYKOMISH RIVER BRIDGE 2/35 BRIDGE PAINTING

  • CONTRACT 6293 BAINBRIDGE ISLAND FERRY TERMIANL DOLPHIN REPLACEMENT PHASE II

  • CONTRACT 6286 Executed 3/1/2002--CLE ELUM VIC. AND SR 10 BR. PAINTING AND BRISTOL FILL BRIDGE DECK REPAIR


    Back toBID TABULATIONS (monthly selection)

    Return to CONTRACT AD and AWARD Home Page

    Return to WSDOT HOME Page

    This page maintained by KEN WALKER (360) 705-7017 and Ken Walker (360) 705-7017
    You can E-mail us at WALKEKE@WSDOT.WA.GOV
    Last Updated FEBRUARY 28, 2002 9:48 AM