 |
Bid Tabulation Files for APRIL 2005
NOTE:
Some of the links on this page point to PDF documents, for which you will
need Adobe's Acrobat Reader. You can download it at no cost from Adobe's
web site if you do not have the software.
CONTRACT 6945 E RAMP TO I-90 BR 519/12/S-E REPAIR
CONTRACT 6948 Executed 4/22/05--SR 509, 11TH ST. I/S TO BROWNS POINT - PAVING
CONTRACT 6936 Executed 4/27/05--SR302 ELGIN CLIFTON ROAD INTERSECTION
CONTRACT 6946 Executed 4/27/05--US 101 COUPLET, SIMPSON AVE. BRIDGE-SEISMIC RETROFIT
CONTRACT 6933 Executed 5/11/05--SR24, I-82 TO KEYS ROAD
CONTRACT 6944 Executed 5/6/05--SR6/SR105 PAVING, GUARDRAIL, UPGRADE, BRIDGE RAIL RETROFIT
CONTRACT 6949 Executed 4/28/05--WSF, CLINTON FERRY TERMINAL SLIP 1 APRON AND WINGWLL REPAIR
CONTRACT 6954 Executed 5/5/05--SR 20, FRUITDALE ROAD INTERSECTION CHANNELIZATION
CONTRACT 6938 All bids rejected 4/25/05--I-5, I-205 TO N FORK LEWIS RIVER BRIDGE PCCP REHABILITATION
CONTRACT 6952 Executed 6/02/05--SR 99, 1ST AVE S BRIDGE - PAINTING
CONTRACT 6955 Executed 5/6/05--SR 539, I-5 I/C VIC TO HORTON RD PAVING
CONTRACT 6961 Executed 5/17/05--SR 903, CLE ELUM VICINITY - ADA RAMP RETROFIT
CONTRACT 6957 Executed 5/17/05--MORTON AND TOLEDO SITE IMPROVEMENTS
CONTRACT 6942 Executed 5/25/05--SR 99, GEORGE WASHINGTON MEMORIAL BRIDGE BRIDGE RAIL RETROFIT
CONTRACT 6953 Executed 5/13/05--SR 522, NE 155TH ST VIC TO 61ST AVE VIC
CONTRACT 6963 Executed 5/13/05-- SR 410, MP 60 VIC TO SR 123 VIC PAVING
CONTRACT 6959 Executed 5/25/05--US 395, EAST ELM ROAD TO SR 17 - SB PAVING
CONTRACT 6962 Executed 5/17/05--US 12, JANTZ ROAD-CONSTRUCT FRONTAGE RD.
CONTRACT 6964 Executed 5/24/05--WSF, KINGSTON FERRY TERMINAL STRUCTURAL STEEL PAINT REPAIR
CONTRACT 6967 Executed 5/20/05--I-90, TINKHAM RD. TO CLE ELUM SIGN ST.
CONTRACT 6968 Executed 5/23/05--I-405, SR 520 I/C VICINITY DRAINAGE IMPROVEMENTS
CONTRACT 6971 SR 20, 2005 EASTERN REGION CHIP SEAL
CONTRACT 6951 US 195 TO SULIIVAN-ITS
CONTRACT 6991 Executed 5/25/05--I-5, EVERETT HOV DESIGN-BUILD PROJECT
Last Updated - June 6, 2005
|