Skip Top Navigation Skip to Content
Bid Tabulation Files for April 2004
Note: Some of the links on this page point to PDF documents, for which you will need Adobe's Acrobat Reader. You can download it at no cost from Adobe's web site if you do not have the software.
- CONTRACT 6745 Executed 4/19/04--CHELAN FALLS S. UNSTABLE SLOPES
- CONTRACT 6723 Executed 4/27/04--TOPPENISH TO WAPATO - DRAINAGE
- CONTRACT 6748 Executed 5/4/04-- MCFEELY RD. TO COPPEI CR. - PAVING
- CONTRACT 6758 Executed 4/29/04--PACIFIC AVE. I/C SB OFF RAMP - SIGNAL
- CONTRACT 6756 Executed 4/27/04--KITCHEN-DICK ROAD TO DUNGENESS RIVER
- CONTRACT 6754 Executed 5/3/04--BURLEY-OLALLA INTERSECTION
- CONTRACT 6753 Executed 5/3/04--MT. VERNON AREA HQ SEWER SYSTEM
- CONTRACT 6755 Executed 4/27/04--SEATTLE CORSON AVE. SITE RENOVATIONS
- CONTRACT 6751 Executed 5/3/04--SR 129, CLARKSTON VICINITY-PAVING
- CONTRACT 6665 Executed 5/12/04--SR 542, WELLS CREEK RD TO MT BAKER VIC
- CONTRACT 6763 Executed 4/28/04--SR 22, 1-82 TO TOPPENISH-PAVING
- CONTRACT 6740 Executed 5/20/04--CITY OF BURLINGTON GOLDENROD BRIDGE & ROAD IMPROVEMENTS
- CONTRACT 6749 Executed 5/12/04--US 12, SR123 & SR 131, LAKE CREEK TO WILDCAT CREEK, ET AL
- CONTRACT 6761 Executed 5/12/04--SR 105, COUNTY LINE TO BONGE AVE.
- CONTRACT 6750 Executed 5/12/04--I-5, NISQUALLY RIVER BRIDGE TO FORT LEWIS RD.
- CONTRACT 6759 Executed 5/18/04--I-5, NORTH OF LAKEWAY I/C PHASE 1A NOISE WALLS AND SAFETY IMPROVEMENTS
- CONTRACT 6764 Executed 5/12/04--SR 20, OAK HARBOR NCL TO FROSTAD ROAD
- CONTRACT 6769 Executed 5/28/04--SR 14, HOOD RIVER BRIDGE SIGNAL
- CONTRACT 6752 Executed 5/28/04--I90, CLE ELUM RIVER BR. 90/134N
- CONTRACT 6766 Executed 5/18/04--US 101, SR 104 TO BRINNON LANE-PAVING
- CONTRACT 6768 Executed 6/01/04--I-5, NORTH SEATTLE BRIDGES-SEISMIC
- CONTRACT 6765 Executed 5/19/04--WSF, LOPEZ FERRY TERMINAL PAVEMENT AND FLOATING DOLPHIN REPAIR
- CONTRACT 6774 Executed 5/12/04--SR 532, JUNCTION 102ND AVENUE NW SIGNAL AND CHANNELIZATION