Washington State Department of Transportation
WSDOT NewsSite IndexContact WSDOTWSDOT Home
Traffic & RoadsProjectsBusinessEnvironmentalMaps & Data
WSDOT Projects
Construction Office Links
 •

Home

 •

Office Staff

 •

Administration

 •

Roadway

 •

Bridge

 •

Specifications and Agreements

 •

Alternative Delivery

 •

Design Build

 • Escalation Clauses
 • Highway Construction Cost Trends
 • Performance Measures
 •

Ad & Award

 •

Downloads

 •

Materials Lab

 • Apprenticeship
 • Partnering
   
Teams
 •

AGC Administration Team

 •

AGC Roadway Team

 •

AGC Structures Team

 •

Design Build

 •

WAPA/WSDOT

 •  ADSC Team 
ACPA Team
   
Resources
 •

Reports

 •

Engineering Publications

 •

Industrial Insurance Rates

 •

Labor Rates - State and Federal (WSDOT Projects Only)

 •

Jobsite Posters

 •

Links

   
Travel Information
 •

Construction Projects

 •

Traffic and Weather

Winter Driving

Studded Tire information

The Pacific Northwest Seismograph Network

   
 
Office Fax
(360) 705-6809
 
     
  For local construction traffic issues please go to our construction traffic page.  

   
Construction Industry Teams
 
AGC/WSDOT ADMINISTRATION TEAM M I N U T E S
All documents are PDF. File size varies
2009 2008 2007 2006 2005 2004 2003 2002
Jan 16 Jan 18 Jan 19 Jan 13 Jan 14 Jan 16 Jan 10 Oct 18
Feb 20 Feb 15 Feb 16 Feb 10 Mar 18 Feb 13 Feb 7 Nov 15
Mar 20 Mar 14 Mar 16 Mar 10 April 15 Mar 12 Apr 11  
Apr 17 Apr 18 April 20 April 14 May 20 Apr 16 May 16  
May 15 May 16 Sep 21 May 19 June 10 May 14 Jun 6  
Sep 18 Sep 19 Oct 19 June 16 Sep 9 Jun 11 Sep 12  
Oct 16 Nov 14 Nov 16 Sep 15 Oct 14 Sep 17 Oct 17  
      Oct 13 Nov 18 Oct 15 Nov 14  
      Dec 01 Dec 09 Nov 12      

 
AGC/WSDOT BRIDGE AND STRUCTURES TEAM M I N U T E S
All documents are PDF. File size varies
2009        
Jan 30 - AGC Annual Meeting, Stimulus Package, Shaft Slurry Disposal, Preservation of Rebar During Deck Overhang Removal, Concrete Barrier Detail Revision, Epoxy Coated Rebar Repair, Electronic Bidding, Certification Requirement for Mechanical Couplers, Placing Concrete in Foundation Seals, Accelerated Bridge Construction (ABC), Use of Self Consolidating Concrete (SCC)
         
Mar 6 - WSDOT Budget Cuts, Steel Cost Escalation, Mechanical Coupler Approval, Concrete Barrier detail Revision, Consolidating Concrete Barrier Bid Items, Concrete Surface Roughening, Underwater Pile Driving Noise
         
Apr 3 - American Recovery and Reinvestment Act, Surface Roughening, BMPs for Field Stirrup Bending, Falsework Removal, Placing Concrete, Girder Erection, Approach Slab Skewed Ends, Need for Intermediate Diaphragms.
         
May 1 - Constructability Review of Manette Bridge, Lead Team Report, Concrete Placement Time, Tension Control Bolt Specification, Shaft Rebar Cage Stability During Transport and Lifting, New Painting Specification
         
Jun 5 - Constructability review of SR305 boring, Review of falsework std spec 6-02.3(17)N, Steel reinforcement Assembly and Installation for shafts and long columns, Best practices to bend girder stirrups, Bridge deck bottom mat ties, bridge deck top mat support methods, Steel escalation index, Load restrictions on bridges under construction Std Spec 6-01.6.
         
2008        
Jan 25 - Tieton River Bridge Constructibility, Prestressed Girders Temporary Strand Creep, Steel BP Rail, Powder Coating Sign Bridges, Retaining Wall Barriers, SEW Moment Slab Strip Feature, Owner Designed Moment Slabs, Pile Driving Spec Modification, Fast-set Epoxy Resin, Constructibility Review Guide, Oscillator Temporary Pile Support, Shaft/Column Splice Zone Concrete, Work Bridge Pile Driving with Vibro-hammers
         
Feb 22 - I-90 Expansion Joint Constructibility, SEW Strip Feature, Owner Designed Moment Slabs, Pile Driving Specifications, Noise Wall Standards.
         
Mar 21 - SEW Barrier Strip Feature, Owner Designed Moment Slabs, Pile Driving Specification, Early Formwork Release <24hrs, Concrete Performance Specifications, Roadway and Bridge Approach Slab Specification
         
Apr 18 - Constructability review of Hylebos Bridge rehab, pile driving specification, diaphragm details, revision of roadway and approach slab specifications, owner designed moment slabs
         
May 23 - Constructibility review of SR 522 BNSF Overcrossing and Puyallup River Bridge SR 162, curved steel girders, structural steel bolt installation, pile driving leads, material cost escalation, WSDOT construction through 2011, bridge deck and approach slabs, construction access, cast-in-place barrier payment, deck curing, spiral breaks in columns, new intermediate diaphragms, and shoring design review.
         
Jun 27 - Constructibility Review of the George Sellar Bridge and SR522 Snohomish River Bridge, Use of Tension Controlled Bolts (TCBs), Pile Driving Specification, Steel Escalation Clause
 
Sep 19 - Constructability Review of I-90/I-5 to 12th Ave S., New Members, Steel Escalation Clause, CEVP, Accelerated Bridge Construction, Girder Transport, Tension Controlled Bolts, Use of Shoulders for Construction Site Access, Concrete Traffic Barrier Payment, Concrete Performance Specification, Collection & Disposal of Shaft Slurries, New Long-Span Girders, Oscillator Support Pile Removal
         
Oct 17 - Shaft Slurry Disposal; Accelerated Bridge Construction Conference; Constructibility Review of East Camas Slough SR-14 Bridge; Deck Slab Overhang Removal; Alternative Rebar Configuration for Retaining Wall Traffic Barriers; Repair of Damage to Epoxy Coated Steel Reinforcing Bar; Sampling and Testing of Concrete; Sequencing of Plan Sheets; Abutment Design for Safety; Status of Alaskan Way Viaduct Replacement; WSDOT Bridge Construction Lessons Learned from the Field
         
2007        

Jan 26 - Topics - Biggs Rapids Deck Replacement Constructibility, Fly Ash Production, Further Deck Prep, I-5 Seattle Viaduct Overlay Constructibility, Footing Max Slope, Working with BNR, Temporary Excavations

 
Mar 2 - Topics - Fly Ash Production, I-90 Widening Constructibility, Staged Construction Finishing Machine Support, Standard Wall Joint Spacing, Electronic Contracts, Construction Zone Lighting
 
Apr 6 - Topics - Fly Ash Production, Staged Construction Finishing Machine Support, Standard Wall Joint Spacing, Electronic Plans PDF, New Approach Slab Specification, Deck Overhang Tapered Soffits, Rapid Formwork Release, Constructibility Review Procedures, Electrical/Mechanical Contract Support
 
Sep 21 - Topics - Sound Transit Tunnel Constructibility, Underwater Pile Driving Noise, George Sellar Bridge Constructibility, Project Management & Delivery System
 
Oct 19 - Topics - WSDOT Executive Reorganization, Nighttime Bridge Deck Placement, New Standard Plan Walls, New Constructibility Review Form, Nooksack River Pile Welding Constructibility, Prestressed Girder Temporary Strand Release Camber, Approach Slab Finishing, Pile Driving with Semi-Fixed Leads, Strike Board Finishing for 200ft Bridges, Steel BP Rails, Moment Slab Strip Feature, Intermediate and End Diaphragm Drawings
 
Nov 30 - Topics - Mountlake Terrace Constructibility, Pile Driving Analyzer (PDA)
         
2006 2005 2004 2003 2002
Jan 27 Jan 28 Jan 16 Feb 7 Jan 25
Feb 24 Feb 25 Feb 12 Mar 7 Mar 29
Mar 24 Mar 25 Mar 12 May 9 May 17
Apr 28 Apr 22 Apr 9 Jun 13 Sep 20
Jun 30 May 20 May 7 Jul 18  
Oct 20 Jun 17 Jun 18 Aug 15 2001
Dec 1 Jul 15 Jul 16 Sep 12 Sep 14
  Aug 12 Aug 13 Oct 10 Oct 26
  Sep 10 Oct 22 Nov 14 Dec 7
  Nov 18 Nov 19    
         

 
AGC/WSDOT ROADWAY TEAM M I N U T E S
All documents are PDF. File size varies

2009 2008 2007 2006 2005 2004 2003 2002
Feb 19 Jan 17 Feb 1 Jan 18 Jan 13 Jan 15 Jan 16 Mar 28
Mar 19 Mar 06 Mar 29 Feb 16 Feb 17 Feb 26 May 9 Apr 25
Apr 16 Apr 17 Apr 26 Apr 20 May 19 Mar 18 Jun 19 Oct 31
May 21 May 22 May 24 May 18 June 16 Apr 15 Sep 18 Dec 12
Jun 18 Sep 18 Jun 20 Jun 15 Sep 15 Jun 17 Oct 16  
Sep 17 Oct 23   Sep 21 Oct 20 Sep 16 Dec 4  
Oct 22 Dec 11   Oct 19 Dec 8 Oct 28    
      Dec 7   Dec 9    
               

ADSC/WSDOT TEAM M I N U T E S
All documents are PDF. File size varies

2009          
April 16 - Topics – Rebar Cage Review Criteria, Synthetic Slurry Disposal, Soldier Pile Provisions for Handling, Soil Nail Proof Testing, Provision Changes Allowing Tying CSL Tubes to Verts, Provision Changes Pertaining to Sand Content and Density Limits Higher PGA Allowance for Telescoping, St. Johns Bridge Sonic Coring Results, Centralizer Detail Concerns, Hoop Butt Welding, Shaft Thermal Integrity Tests, Temporary Shoring Removal, Constructability Review of Columbia River Crossing Project Walls
           
June 25 - Rebar Cage Review Criteria, Soldier Pile Provisions for Handling, Soil Nail Proof Testing, Provision Changes Allowing Tying CSL Tubes to Vertical Bars, Use of Flash Welded Hoops, New Centralizers, Allowing for Use of Pea Gravel in Temporary Soldier Piles, Wet Setting PGA Tendons, Sonic Coring, Alaskan Way Viaduct Holgate to King Shaft Constructability, Columbia River Crossing Shaft Constructability
           
2008 2007 2006 2005 2004  
Jan 24 Jan 25 Jan 17 Apr 6 Feb 6
Apr 24 Jun 6 Mar 20 May 26 Apr 27    
Jun 26 Sep 13 May 4 Aug 18 Jun 10  
Sep 25 Nov 15 Jun 22 Oct 20 Jun 17    
    Aug 10 Dec 8 Aug 5    
    Oct 26   Sep 16    
        Oct 28    
        Dec 9    

 
WAPA/WSDOT TEAM M I N U T E S
All documents are PDF. File size varies
October 10, 2002
February 27, 2003
May 15, 2003
May 27, 2004

ACPA/WSDOT TEAM M I N U T E S
All documents are PDF. File size varies

April 23, 2007
September 10, 2007
April 1, 2008
October 7, 2008
April 13, 2009
October 5, 2009

 



Some documents require Adobe Acrobat(tm)



Reader, a FREE utility from Adobe. Get the file and instructions.


  Copyright WSDOT © 2007

    Traffic & Roads | Search | Contact WSDOT | WSDOT Business | WSDOT Home