AGC/WSDOT BRIDGE AND STRUCTURES TEAM M I N U T E S All
documents are PDF. File size varies |
| 2009 |
|
|
|
|
| Jan
30
- AGC Annual Meeting, Stimulus Package, Shaft Slurry Disposal,
Preservation of Rebar During Deck Overhang Removal, Concrete
Barrier Detail Revision, Epoxy Coated Rebar Repair, Electronic
Bidding, Certification Requirement for Mechanical Couplers,
Placing Concrete in Foundation Seals, Accelerated Bridge Construction
(ABC), Use of Self Consolidating Concrete (SCC) |
| |
|
|
|
|
| Mar
6 - WSDOT Budget Cuts, Steel Cost Escalation, Mechanical
Coupler Approval, Concrete Barrier detail Revision, Consolidating
Concrete Barrier Bid Items, Concrete Surface Roughening, Underwater
Pile Driving Noise |
| |
|
|
|
|
| Apr
3 - American Recovery and Reinvestment Act, Surface
Roughening, BMPs for Field Stirrup Bending, Falsework Removal,
Placing Concrete, Girder Erection, Approach Slab Skewed Ends,
Need for Intermediate Diaphragms. |
| |
|
|
|
|
| May
1 - Constructability Review of Manette Bridge, Lead
Team Report, Concrete Placement Time, Tension Control Bolt Specification,
Shaft Rebar Cage Stability During Transport and Lifting, New
Painting Specification |
| |
|
|
|
|
| Jun
5 - Constructability review of SR305 boring, Review
of falsework std spec 6-02.3(17)N, Steel reinforcement Assembly
and Installation for shafts and long columns, Best practices
to bend girder stirrups, Bridge deck bottom mat ties, bridge
deck top mat support methods, Steel escalation index, Load restrictions
on bridges under construction Std Spec 6-01.6. |
| |
|
|
|
|
| 2008 |
|
|
|
|
| Jan
25 - Tieton River Bridge Constructibility, Prestressed
Girders Temporary Strand Creep, Steel BP Rail, Powder Coating
Sign Bridges, Retaining Wall Barriers, SEW Moment Slab Strip
Feature, Owner Designed Moment Slabs, Pile Driving Spec Modification,
Fast-set Epoxy Resin, Constructibility Review Guide, Oscillator
Temporary Pile Support, Shaft/Column Splice Zone Concrete, Work
Bridge Pile Driving with Vibro-hammers |
| |
|
|
|
|
| Feb
22 - I-90 Expansion Joint Constructibility, SEW Strip
Feature, Owner Designed Moment Slabs, Pile Driving Specifications,
Noise Wall Standards. |
| |
|
|
|
|
| Mar
21 - SEW Barrier Strip Feature, Owner Designed Moment
Slabs, Pile Driving Specification, Early Formwork Release <24hrs,
Concrete Performance Specifications, Roadway and Bridge Approach
Slab Specification |
| |
|
|
|
|
| Apr
18 - Constructability review of Hylebos Bridge rehab,
pile driving specification, diaphragm details, revision of roadway
and approach slab specifications, owner designed moment slabs |
| |
|
|
|
|
| May
23 - Constructibility review of SR 522 BNSF Overcrossing
and Puyallup River Bridge SR 162, curved steel girders, structural
steel bolt installation, pile driving leads, material cost escalation,
WSDOT construction through 2011, bridge deck and approach slabs,
construction access, cast-in-place barrier payment, deck curing,
spiral breaks in columns, new intermediate diaphragms, and shoring
design review. |
| |
|
|
|
|
| Jun
27 - Constructibility Review of the George Sellar Bridge
and SR522 Snohomish River Bridge, Use of Tension Controlled
Bolts (TCBs), Pile Driving Specification, Steel Escalation Clause |
| |
| Sep
19 - Constructability Review of I-90/I-5 to 12th Ave
S., New Members, Steel Escalation Clause, CEVP, Accelerated
Bridge Construction, Girder Transport, Tension Controlled Bolts,
Use of Shoulders for Construction Site Access, Concrete Traffic
Barrier Payment, Concrete Performance Specification, Collection
& Disposal of Shaft Slurries, New Long-Span Girders, Oscillator
Support Pile Removal |
| |
|
|
|
|
| Oct
17
- Shaft Slurry Disposal; Accelerated Bridge Construction Conference;
Constructibility Review of East Camas Slough SR-14 Bridge; Deck
Slab Overhang Removal; Alternative Rebar Configuration for Retaining
Wall Traffic Barriers; Repair of Damage to Epoxy Coated Steel
Reinforcing Bar; Sampling and Testing of Concrete; Sequencing
of Plan Sheets; Abutment Design for Safety; Status of Alaskan
Way Viaduct Replacement; WSDOT Bridge Construction Lessons Learned
from the Field |
| |
|
|
|
|
| 2007 |
|
|
|
|
Jan
26 - Topics - Biggs Rapids Deck Replacement Constructibility,
Fly Ash Production, Further Deck Prep, I-5 Seattle Viaduct
Overlay Constructibility, Footing Max Slope, Working with
BNR, Temporary Excavations |
| |
| Mar
2 - Topics - Fly Ash Production, I-90 Widening Constructibility,
Staged Construction Finishing Machine Support, Standard Wall
Joint Spacing, Electronic Contracts, Construction Zone Lighting
|
| |
| Apr
6 - Topics - Fly Ash Production, Staged Construction
Finishing Machine Support, Standard Wall Joint Spacing, Electronic
Plans PDF, New Approach Slab Specification, Deck Overhang Tapered
Soffits, Rapid Formwork Release, Constructibility Review Procedures,
Electrical/Mechanical Contract Support |
| |
| Sep
21 - Topics - Sound Transit Tunnel Constructibility,
Underwater Pile Driving Noise, George Sellar Bridge Constructibility,
Project Management & Delivery System |
| |
| Oct
19 - Topics - WSDOT Executive Reorganization, Nighttime
Bridge Deck Placement, New Standard Plan Walls, New Constructibility
Review Form, Nooksack River Pile Welding Constructibility, Prestressed
Girder Temporary Strand Release Camber, Approach Slab Finishing,
Pile Driving with Semi-Fixed Leads, Strike Board Finishing for
200ft Bridges, Steel BP Rails, Moment Slab Strip Feature, Intermediate
and End Diaphragm Drawings |
| |
| Nov
30 - Topics - Mountlake Terrace Constructibility, Pile
Driving Analyzer (PDA) |
| |
|
|
|
|
| 2006 |
2005 |
2004 |
2003 |
2002 |
| Jan
27 |
Jan
28 |
Jan
16 |
Feb
7 |
Jan
25 |
| Feb
24 |
Feb
25 |
Feb
12 |
Mar
7 |
Mar
29 |
| Mar
24 |
Mar
25 |
Mar
12 |
May
9 |
May
17 |
| Apr
28 |
Apr
22 |
Apr
9 |
Jun
13 |
Sep
20 |
| Jun
30 |
May
20 |
May
7 |
Jul
18 |
|
| Oct
20 |
Jun
17 |
Jun
18 |
Aug
15 |
2001 |
| Dec
1 |
Jul
15 |
Jul
16 |
Sep
12 |
Sep
14 |
| |
Aug
12 |
Aug
13 |
Oct
10 |
Oct
26 |
| |
Sep
10 |
Oct
22 |
Nov
14 |
Dec
7 |
| |
Nov
18 |
Nov
19 |
|
|
| |
|
|
|
|
|
| |
ADSC/WSDOT
TEAM M I N U T E S
All documents are PDF. File size varies
|
| 2009 |
|
|
|
|
|
| April
16 - Topics – Rebar Cage Review Criteria, Synthetic
Slurry Disposal, Soldier Pile Provisions for Handling, Soil
Nail Proof Testing, Provision Changes Allowing Tying CSL Tubes
to Verts, Provision Changes Pertaining to Sand Content and Density
Limits Higher PGA Allowance for Telescoping, St. Johns Bridge
Sonic Coring Results, Centralizer Detail Concerns, Hoop Butt
Welding, Shaft Thermal Integrity Tests, Temporary Shoring Removal,
Constructability Review of Columbia River Crossing Project Walls
|
| |
|
|
|
|
|
| June
25 - Rebar Cage Review Criteria, Soldier Pile Provisions
for Handling, Soil Nail Proof Testing, Provision Changes Allowing
Tying CSL Tubes to Vertical Bars, Use of Flash Welded Hoops,
New Centralizers, Allowing for Use of Pea Gravel in Temporary
Soldier Piles, Wet Setting PGA Tendons, Sonic Coring, Alaskan
Way Viaduct Holgate to King Shaft Constructability, Columbia
River Crossing Shaft Constructability |
| |
|
|
|
|
|
| 2008 |
2007 |
2006 |
2005 |
2004 |
|
| Jan
24 |
Jan
25 |
Jan
17 |
Apr
6 |
Feb
6 |
|
| Apr
24 |
Jun
6 |
Mar
20 |
May
26 |
Apr
27 |
|
|
| Jun
26 |
Sep
13 |
May
4 |
Aug
18 |
Jun
10 |
|
| Sep
25 |
Nov
15 |
Jun
22 |
Oct
20 |
Jun
17 |
|
|
| |
|
Aug
10 |
Dec
8 |
Aug
5 |
|
|
| |
|
Oct
26 |
|
Sep
16 |
|
|
| |
|
|
|
Oct
28 |
|
|
| |
|
|
|
Dec
9 |
|
|
|
| |
ACPA/WSDOT
TEAM M I N U T E S
All documents are PDF. File size varies
April 23, 2007
September 10, 2007
April 1, 2008
October 7, 2008
April 13, 2009
October 5, 2009
| |

|
|