Washington State Department of Transportation
WSDOT NewsSite IndexContact WSDOTWSDOT Home
Traffic & RoadsProjectsBusinessEnvironmentalMaps & Data
WSDOT Projects
Construction Office Links
 •

Home

 •

Office Staff

 •

Administration

 •

Roadway

 •

Bridge

 •

Specifications and Agreements

 •

Alternative Delivery

 •

Design Build

 • Escalation Clauses
 • Highway Construction Cost Trends
 • Performance Measures
 •

Ad & Award

 •

Downloads

 •

Materials Lab

 • Apprenticeship
 • Partnering
   
Teams
 •

AGC Administration Team

 •

AGC Roadway Team

 •

AGC Structures Team

 •

Design Build

 •

WAPA/WSDOT

 •  ADSC Team 
ACPA Team
   
Resources
 •

Reports

 •

Engineering Publications

 •

Industrial Insurance Rates

 •

Labor Rates - State and Federal (WSDOT Projects Only)

 •

Jobsite Posters

 •

Links

   
Travel Information
 •

Construction Projects

 •

Traffic and Weather

Winter Driving

Studded Tire information

The Pacific Northwest Seismograph Network

   
 
Office Fax
(360) 705-6809
 
     
  For local construction traffic issues please go to our construction traffic page.  

   

22nd Annual Statewide Project Engineers' Conference
Hosted by Washington State Ferries

Kitsap Conference Center
100 Washington Ave.
Bremerton, WA 98337


Tuesday, March 18
      1:10 p.m. to 3:00 p.m.   WSF Eagle Harbor Maintenance Facility Tour
  1:00 p.m. to 5:00 p.m.   Registration
  5:00 p.m. to 5:15 p.m.    Welcome (pdf 2347 kb)
  5:15 p.m. to 6:00 p.m.    Mukilteo Terminal (pdf 21.6 mb)
  6:00 p.m. to 7:00 p.m.   Dinner
  7:00 p.m. to 8:15 p.m.  

Paving and Administration Awards
Design Excellence Awards
(pdf 8.6 mb)
Environmental Awards
(pdf 4 mb)
Maintenance Awards
(pdf 197 kb)

 Tuesday, March 20
Technical Sessions
  8:00 a.m. to 8:45 a.m.   A. Alaskan Way Viaduct and SR 520 Bridge (pdf 24 mb)
B. ADA Design: Upcoming Changes (pdf 23 mb)
  9:00 a.m. to 9:45 a.m.    A. Sound Transit Projects (pdf 48 mb)
B. Global Warming and WSDOT (pdf 1237 kb)
  10:00 a.m. to 10:45 a.m.   

A. Mega Projects Update (pdf 1839 kb) and I-405 (pdf 18 mb)
B. Traffic Noise, Noise Barrier Alternatives and Quieter Pavement
(pdf 9 mb)

  11:00 a.m. to 11:45 a.m.    A. Tort Claims and Risk Management (pdf 26 kb)
B. Department of Licensing (pdf 105 kb)
  12:00 p.m. to 12:45 p.m.   Lunch
  12:45 p.m. to 1:45 p.m.   Understanding Freight Movement (pdf 914 kb)
  2:00 p.m. to 2:45p.m.  

A. Port of Tacoma
B. Vancouver Land Bridge
(pdf 155 mb)

  3:00 p.m.. to 3:45 p.m.    A. New Bridge Technologies (pdf 43 mb)
B. Intelligent Transportation Systems (pdf 8609 kb)
  4:00 p.m. to 4:45 p.m.   A. Columbia River Crossing (pdf 17 mb)
B. Bear Canyon Geotechnical Issues (pdf 55 mb)
  5:30 p.m. to 6:30 p.m.   Dinner
  6:30 p.m. to 7:30 p.m.   Avalanche Control
Wednesday, March 21
  7:30 a.m. to 8:30 a.m.    Breakfast
  8:30 a.m. to 9:00 a.m.   Erosion Control Monitoring Changes (pdf 2 mb)
  9:00 a.m. to 9:35 a.m.   Change Orders (pdf 817 kb)
  9:35 a.m. to 10:20 a.m.   P1 Model Changes and What Does the Future Hold
  10:20 a.m. to 11:20 a.m.   Special Guest Speaker Paula Hammond (pdf 49 kb)

2007 Statewide Project Engineers' Conference

Some documents require Adobe Acrobat(tm)


Reader, a FREE utility from Adobe. Get the file and instructions.



  Copyright WSDOT © 2007

    Traffic & Roads | Search | Contact WSDOT | WSDOT Business | WSDOT Home