Active Projects Sorted By Region and Project Engineer |
||||
|---|---|---|---|---|
| Contract Number |
Title | Contractor Name |
Bid Amount | |
|
|
||||
|
Eastern | ||||
|
Hilmes |
||||
| 7610 | US 395, NSC - US 2 LOWERING | GRAHAM CONSTRUCTION & | $42.85 | |
| 7967 | US 395, NSC - FREYA ST TO FARWELL RD SB ADDITIONAL | GRAHAM CONSTRUCTION & | $21.46 | |
| 8171 | US195 CHENEY-SPOKANE RD CONGESTION & SAFETY | AZTECH ELECTRIC, INC. | $0.78 | |
| 8195 | US395 NSC PARKSMITH INTERCHANGE | MAX J. KUNEY COMPANY | $6.92 | |
| 8214 | US 395 CHILDREN OF THE SUN TRAIL MEAD CONN. | MOUNTAIN CREST ENTERPRISES, INC. | $0.05 | |
|
McCallum |
||||
| 7777 | NSC US 2 TO WANDEMERE VICINITY | GRAHAM CONSTRUCTION & | $37.54 | |
| 7872 | HAVANA ST OVERCROSSING PHASE 2 PHASE 2 | GRAHAM CONSTRUCTION & | $7.87 | |
| 8022 | I-90 SULLIVAN RD TO BARKER RD ADDITIONAL LANES ADD | ACME CONCRETE PAVING, INC. | $14.95 | |
|
Simonson |
||||
| 7850 | SR27, REPLACE PINE CREEK BRIDGE | THOMPSON BROS. EXCAVATING, INC. | $2.30 | |
| 8018 | I-90 GEIGER RD TO SPOKANE VIADUCT PCCP REHAB PCCP | ACME CONCRETE PAVING, INC. | $7.85 | |
| 8241 | SR21 CURLEW ST PK TO N OF RINCON CR RD PAVE N OF R | POE ASPHALT PAVING, INC. | $4.24 | |
| 8262 | EASTERN REGION CHIP SEAL 2012 CHIP SEAL 2012 | CENTRAL WASHINGTON ASPHALT, INC. | $8.37 | |
|
Ferries | ||||
|
Callahan |
||||
| 8162 | SYSTEMWIDE ON-CALL, OFF-SHORE MAINTENANC | AMERICAN CONSTRUCTION CO., INC. | $1.51 | |
| 8187 | WSF TERMINAL ONCALL MAINT PAINTING MAINTENANCE PAI | LONG PAINTING COMPANY | $0.66 | |
| 8192 | SR 519/SEATTLE FERRY TERMINAL, SLIP 2 MECHANICAL & | AMERICAN CONSTRUCTION CO., INC. | $1.56 | |
| 8198 | SEATTLE TERMINAL ELECT DISTRIB SSTM UPGRADE SYSTEM | MCCLURE & SONS, INC. | $2.97 | |
| 8227 | FAUNTLEROY TERMINAL UPGRADE UPGRADE | DALTON ELECTRIC COMPANY | $0.16 | |
| 8235 | WSF LOPEZ ISLAND TERM FLOAT WINGWALL REHAB | RAZZ CONSTRUCTION, INC. | $1.95 | |
| 8254 | SR 20, PORT TOWNSEND FERRY TERMINAL SLIP 1 TRANSFE | AMERICAN CONSTRUCTION CO., INC. | $2.03 | |
| 8257 | ORCAS ISLAND FERRY TERMINAL TRESTLE PAVING TRESTLE | LAKESIDE INDUSTRIES, INC. | $0.07 | |
| 8264 | SR305 EAGLD HARBOR MAINT FAC SLIP E SLIP E MECH RE | QUIGG BROS., INC. | $0.23 | |
|
Headquarters | ||||
|
Engineer |
||||
| 5444 | MOUNT VERNON M/E/S FACILITY | QUANTUM CONSTRUCTION INC | $1.19 | |
| 5454 | CONNELL SECTION FACILITY | CARGILE CONSTRUCTION GROUP | $0.96 | |
| 5499 | BALLINGER MAINTENANCE SECTION FACILITY CONSTRUCTIO | CREE CONSTRUCTION CO INC | $1.05 | |
| 5624 | EAGLE HARBOR MAINTENANCE FACILITY | TEC CONSTRUCTION, INC. | $0.36 | |
| 6683 | FAC 04BB00/02, WENATCHEE EUCLID AVE CONSOLIDATED S | LEVERNIER CONSTRUCTION INC. | $4.18 | |
| 6789 | POMEROY SECTION FACILITY CONSTRUCTION | WC CONSTRUCTION | $1.06 | |
| 7138 | I-90 RYGRASS SRA WATER SYSTEM REHAB WATER SYSTEM R | DAVID L. SACK CONSTRUCTION CO, INC | $0.33 | |
| 7440 | NWR HDQTRS ELEVATOR MODERNIZATION | EBENAL GENERAL, INC | $0.97 | |
| 7441 | SW REGION HEADQUARTERS ELEVATOR MODERNIZATION | EBENAL GENERAL, INC | $0.52 | |
| 7464 | SCATTER CREEK/MAYTOWN SAFETY REST AREAS | STAN PALMER CONSTRUCTION, INC. | $5.98 | |
| 7615 | ORONDO MAINT FAC BLDG ADDITION | BLODGETT CONSTRUCTION | $0.24 | |
| 7905 | WANDERMERE VEHICLE STORAGE BLDG REPLACEMENT | DANNEKO CONSTRUCTION | $0.18 | |
| 7991 | HYAK PRE-WASH BAY | HALME BUILDERS, INC. | $0.33 | |
| 8002 | SR 24, VERNITA SAFETY REST AREA BUILDING REPLACEME | CONCORD CONSTRUCTION, INC. | $0.82 | |
| 8006 | EVERETT AREA HQ SHOP & OFFICE ROOF REPLACEMENT | ICON CORPORATION | $0.15 | |
| 8025 | MOTTMAN MODULAR RE-ROOF AND HVAC RENOVATION | PBJ CONTRACTING, INC. | $0.19 | |
| 8072 | SR 7, ELBE SAFETY REST AREA | PEASE & SONS, INC. | $1.02 | |
| 8082 | SR 82, EAST BOUND SELAH CREEK SAFETY REST AREA BUI | GRAHAM CONSTRUCTION & | $0.87 | |
| 8136 | CORSON AVENUE MATS LAB ROOF REPLACEMENT | SCHOLTEN ROOFING, INC | $0.13 | |
| 8160 | COWLITZ RIVER VALLEY HISTORICAL SOCIETY INTERPRETI | CHRISTENSEN INC. | $0.12 | |
| 8163 | NCR RV WINTERIZATION | HALME BUILDERS, INC. | $0.36 | |
| 8188 | CHEHALIS MAINTENANCE FACILITY AREA 2 OFFICE FLOOR | YI & ASSOCIATES, INC. | $0.13 | |
| 8224 | SEATAC REST AREA STAIRS & RAMP REPLACEMENT | NORDIC CONSTRUCTION, INC. | $0.07 | |
| 8230 | SWR HQ ADMIN BLDG RM 202 HVAC REPLACEMENT | FIRST CALL HEATING & COOLING COMPAN | $0.07 | |
| 8249 | OLYMPIC REGION FURNACE AND LIGHTING REPLACEMENT | CAPITAL SHEET METAL DBA CAPITAL | $0.12 | |
| 8281 | STATE MATERIALS LABORATORY ROOF REPAIRS FACILITIES | ALPENGLOW CONSTRUCTION SERVICES INC | $0.08 | |
|
North Central | ||||
|
Romine |
||||
| 8074 | SR 171, MOSES LAKE PAVING | GRANITE NORTHWEST, INC. | $2.01 | |
| 8139 | US 2, TUMWATER CANYON BRIDGE REPLACEMENTS | SELLAND CONSTRUCTION, INC. | $8.49 | |
| 8182 | SR 20, NORTH CASCADES HIGHWAY - DRAINAGE REPAIR | TRIMAXX CONSTRUCTION, INC. | $0.30 | |
| 8232 | US 97A, 0.5 MILE SO. OF ROCKY REACH DAM SLOPE STAB | JANOD INC. | $3.11 | |
|
Waligorski |
||||
| 8166 | SR 28, E. END OF THE GEORGE SELLAR BR. CONSTRUCT B | KLB CONSTRUCTION, INC. | $16.36 | |
| 8229 | US 2, STEVENS PASS WEST SLOPE STABILIZATION | MIDWEST ROCKFALL, INC. | $5.29 | |
| 8247 | US 2, SR 20, SR 26, US 97, SR 172, 2012 NCR CHIP S | CENTRAL WASHINGTON ASPHALT, INC. | $6.18 | |
| 8284 | US 97, NORTH BLEWETT PASS SAFETY IMPROVE | PETERSEN BROTHERS, INC. | $0.11 | |
|
Northwest | ||||
|
Allison |
||||
| 7963 | SR 520, EASTSIDE TRANSIT AND HOV PROJECT A DESIGN | EASTSIDE CORRIDOR CONSTRUCTORS | $306.28 | |
|
Borschowa |
||||
| 7185 | SR 18, MAPLE VALLEY TO ISSAQUAH/HOBART ROAD ROADSI | BUCKLEY NURSERY COMPANY, INC. | $4.46 | |
| 7200 | I-405, SPRINGBOOK CREEK WETLAND & HABITAT MITIGATI | SCARSELLA BROS., INC. | $12.54 | |
| 7217 | I-90, 2-WAY TRANSIT & HOV OPERATIONS STAGE 1 | MAX J. KUNEY COMPANY | $22.46 | |
| 7264 | I 90, EASTBOUND RAMPS TO SR 202 ROUNDABOUT | TRI-STATE CONSTRUCTION, INC. | $1.16 | |
| 7417 | NE 10TH ST BRIDGE CROSSING, STAGE 2 | MAX J. KUNEY COMPANY | $13.87 | |
| 7495 | I-5, 5TH AVENUE NE TO NE 92ND - NOISE WALL | GRANITE NW INC DBA WILDER CONSTRUCT | $3.32 | |
| 7538 | BOSTON - E SHELBY, WESTSIDE NOISEWALLS | C.A. CAREY CORP. | $5.38 | |
| 7569 | SR 161/ STONE CREEK NOISE WALL | TRI-STATE CONSTRUCTION, INC. | $0.96 | |
| 7798 | I-5 5TH AVE-NE 92ND NOISE WALL STG 2 NOISE WALL - | MASSANA CONSTRUCTION, INC. | $1.48 | |
| 7936 | I-5, SR 161/SR 18 INTERCHANGE IMPROVEMENTS | MOWAT CONSTRUCTION COMPANY | $50.78 | |
| 8113 | SR 518, BRIDGES - SEISMIC RETROFIT | GRAHAM CONSTRUCTION & | $3.71 | |
|
Boyd |
||||
| 7987 | SR 520 EVERGREEN POINT FLOATING BRIDGE TOLL SIGNIN | ELCON CORPORATION | $0.45 | |
| 8066 | SR 520 / I-5 TO MEDINA - EVERGREEN POINT FLOATING | KIEWIT/GENERAL/MANSON, A JOINT | $586.56 | |
|
Chi |
||||
| 8080 | SR 99, AURORA AVE - G WASHINGTON MEMORIAL BR SEISM | MASSANA CONSTRUCTION, INC. | $6.16 | |
| 8102 | I-5, EXPRESS LANE AUTOMATION | ELCON CORPORATION | $3.42 | |
| 8140 | SR 9, 212TH ST SE TO 176TH ST SE STAGE 3 WIDENING | NORTHWEST CONSTRUCTION, INC. | $24.30 | |
| 8184 | SR 9, 212TH ST SE TO 176TH ST SE STAGE 3 WETLAND M | TRI-STATE CONSTRUCTION, INC. | $1.25 | |
| 8250 | I-5, NORTH 45TH ST VICINITY SIGN BRIDGE REPLACEMEN | MJ HUGHES CONSTRUCTION, INC. | $0.38 | |
| 8268 | SR 9, 176TH ST SE VIC TO SR 96 PAVING | CEMEX CONSTRUCTION MATERIALS | $2.51 | |
|
Crisman |
||||
| 7532 | QUIET COVE RD TO SR 20 SPUR STAGE 2 | SCARSELLA BROS., INC. | $11.13 | |
| 7916 | US 2 SAFETY IMPROVEMENTS | VETCH CONSTRUCTION LLC | $2.93 | |
| 7920 | SR 9, LUNDEEN PARKWAY TO SR 92 INTERSECTION IMPROV | GRANITE CONSTRUCTION COMPANY | $10.92 | |
| 8060 | SR 530, SKAGLUND HILL SLIDE - PERMANENT REPAIR | VETCH CONSTRUCTION LLC | $3.30 | |
| 8121 | US 2, WAGLEY'S CREEK TRIBUTARY - FISH PASSAGE | ANDERSON ENVIRONMENTAL | $0.34 | |
| 8141 | SR 20/SR 525, LIBBEY RD VIC TO SIDNEY ST VIC REALI | INTERWEST CONSTRUCTION, INC. | $2.27 | |
| 8269 | SR530 FORTSON CR CULV FISH BARRIER | RAM CONSTRUCTION GENERAL | $0.81 | |
|
Damitio |
||||
| 7874 | I-5, BLAINE EXIT INTERCHANGE IMPROVEMENTS | INTERWEST CONSTRUCTION, INC. | $2.77 | |
| 7911 | SR 542, GALLUP CREEK BRIDGE REPLACEMENT | SCARSELLA BROS., INC. | $2.71 | |
| 7962 | I-5 DOWNTOWN BELLINGHAM ON/OFF RAMPS - RAMP RECONS | VETCH CONSTRUCTION LLC | $4.44 | |
| 8086 | SR 542, EVERSON GOSHEN RD VIC TO SR 9 VIC INTERSEC | BOSS CONSTRUCTION, INC. | $2.74 | |
| 8089 | SR 548, TERRELL CREEK - FISH PASSAGE | KLB CONSTRUCTION, INC. | $0.67 | |
| 8239 | I-5, SAMISH WAY AND NORTHWEST AVE TO BIRCH BAY LYN | VALLEY ELECTRIC CO. OF MT. VERNON | $5.34 | |
|
Fahning |
||||
| 7163 | I-5, S EVERETT FREEWAY STATION 112TH STREET SE I-5 | GUY F. ATKINSON CONSTRUCTION LLC | $24.15 | |
| 7631 | I-5, 172ND ST NE (SR 531) INTERCHANGE MODIFICATION | NORTHWEST CONSTRUCTION, INC. | $12.98 | |
| 7649 | I-5, MOUNTLAKE TERRACE FREEWAY STATION | MIDMOUNTAIN CONTRACTORS, INC. | $17.75 | |
| 7752 | I-5, MARYSVILLE TO STILLAGUAMISH RIVER BRIDGE- MED | TRI-STATE CONSTRUCTION, INC. | $13.26 | |
| 7856 | SR 203 CORRIDOR SAFETY IMPROVEMENTS KING & SNOHOMI | TRI-STATE CONSTRUCTION, INC. | $2.97 | |
| 7938 | SR 522, US 2 INTERCHANGE FLYOVER RAMP | SCARSELLA BROS., INC. | $15.51 | |
| 8073 | US 2, 43RD AVE SE VIC TO 50TH AVE SE VIC BRIDGE RE | MJ HUGHES CONSTRUCTION, INC. | $4.17 | |
| 8128 | SR 522, SNOHOMISH RIVER BRIDGE TO US 2 VIC WIDENIN | SCARSELLA BROS., INC. | $73.14 | |
| 8177 | US 2, RICE ROAD INTERSECTION - SAFETY IMPROVEMENTS | LAKESIDE/TRI-STATE JOINT VENTURE | $2.17 | |
|
Fuller |
||||
| 8016 | I-5, JOE LEARY SLOUGH TO NULLE RD VIC PAVING DESIG | GRANITE CONSTRUCTION COMPANY | $14.55 | |
|
Hammer |
||||
| 7639 | SR 9, MARTIN RD VIC TO THUNDER CR- REALIGNMENT AND | MARSHBANK CONSTRUCTION, INC. | $1.69 | |
| 7859 | SR 11, I-5 INTERCHANGE - JOSH WILSON RD REBUILD IN | INTERWEST CONSTRUCTION, INC. | $4.79 | |
| 8012 | SR 20, RED CABIN CREEK - CED | INTERWEST CONSTRUCTION, INC. | $1.94 | |
| 8065 | SR 530, SAUK RIVER BANK EROSION REALIGN ROADWAY | TRIMAXX CONSTRUCTION, INC. | $2.48 | |
| 8077 | SR 11, CHUCKANUT PARK AND RIDE | INTERWEST CONSTRUCTION, INC. | $3.20 | |
| 8130 | SR 20, BARRIER CREEK CULVERT REPLACEMENT | RAZZ CONSTRUCTION, INC. | $1.52 | |
| 8222 | SR 9/SR 531, 172ND ST NE & EAGLEFIELD DR INTERSECT | INTERWEST CONSTRUCTION, INC. | $5.00 | |
| 8252 | SR20 VEHICLE RESERVATION PH1 ITS SYSTEMS ITS SYSTE | VALLEY ELECTRIC CO. OF MT. VERNON | $0.70 | |
|
Hodgson |
||||
| 8204 | I-405, NE 6TH ST TO I-5 WIDENING AND EXPRESS TOLL | FLATIRON CONSTRUCTORS, INC. | $155.50 | |
|
Javeri |
||||
| 7726 | I-405, NE 8TH ST TO SR 520 BRAIDED RAMPS- INTERCHA | GUY F. ATKINSON CONSTRUCTION, LLC. | $107.50 | |
| 8216 | SR 9 / SR 92 INTERSECTION IMPROVEMENTS DESIGN BUIL | GUY F. ATKINSON CONSTRUCTION, LLC. | $3.35 | |
| 8260 | I-405 / SR 167, THUNDER HILLS CREEK MITIGATION FIS | SCARSELLA BROS., INC. | $3.16 | |
|
Johnson |
||||
| 7847 | SR 99, ALASKAN WAY VIADUCT - REPLACEMENT S HOLGATE | SKANSKA USA CIVIL WEST CALIFORNIA | $114.57 | |
|
Lindberg |
||||
| 7553 | SR 900, SE 78TH ST VIC TO NEWPORT WAY VIC AND I-90 | ICON MATERIALS, A DIVISION OF CPM | $19.35 | |
| 7844 | SR 99 ET AL, 1ST AVE S TO S 112TH ST AND S 120TH S | SIGNAL ELECTRIC, INC. | $2.48 | |
| 7959 | SR 99, S HUDSON ST TO WARD ST AUTOMATED VIADUCT CL | SIGNAL ELECTRIC, INC. | $1.43 | |
| 8101 | SR 519 / I-90 TO SR 519 PEDESTRIAN TRAIL | TRI-STATE CONSTRUCTION, INC. | $1.11 | |
| 8236 | SR 99, YESLER WAY TO SPRING STREET NB ALASKAN WAY | TITAN EARTHWORK LLC | $0.33 | |
|
McCormick |
||||
| 7999 | SR 99, BORED TUNNEL ALTERNATIVE - DESIGN BUILD PRO | SEATTLE TUNNEL PARTNERS | $1,089.70 | |
|
Sawyer |
||||
| 7350 | SR 518, SR 509 TO I-5/I-405 - WIDENING | TRI-STATE CONSTRUCTION, INC. | $26.63 | |
| 7431 | SR522, U/W BOTHELL CASCADIA SOUTH ACCESS | MOWAT CONSTRUCTION COMPANY | $36.65 | |
| 7945 | I-5, 196TH ST (SR 524) I/C SB BRAIDED RAMP | NORTHWEST CONSTRUCTION, INC. | $18.73 | |
| 7948 | SR 529, EBEY SLOUGH BR - REPLACE BRIDGE | GRANITE CONSTRUCTION COMPANY | $21.54 | |
| 8279 | I-5, DAYTON AVE N TO 128TH ST SW ITS REHABILITATIO | ELCON CORPORATION | $1.29 | |
|
Trinh |
||||
| 7272 | SR 520, WEST LAKE SAMMAMISH PARKWAY FLYOVER RAMP | TRI-STATE CONSTRUCTION, INC. | $9.99 | |
| 7637 | SR 520/ W LAKE SAMMAMISH PKWY TO SR 202 HOV AND SR | PCL CONSTRUCTION SERVICES, INC. | $37.74 | |
| 7870 | I-90, TWO-WAY TRANSIT & HOV OPERATIONS STAGE 2 | GARY MERLINO CONSTRUCTION CO., INC. | $11.58 | |
| 7917 | I90, SUNSET WAY CONNECTION I/C MODS | TRI-STATE CONSTRUCTION, INC. | $1.31 | |
| 8053 | I-405, NE 116TH STREET INTERCHANGE AND STREET IMPR | GARY MERLINO CONSTRUCTION CO., INC. | $10.69 | |
| 8142 | SR 18, MILITARY RD VIC TO AUBURN BLACK DIAMOND RD | TUCCI & SONS, INC. | $1.18 | |
| 8211 | I-5, S 216TH ST VIC TO I-405 I/C VIC PCCP PANEL RE | C.A. CAREY CORPORATION | $0.79 | |
| 8223 | I-90, EAST FORK ISSAQUAH CREEK FISH PASSAGE | TRI-STATE CONSTRUCTION, INC. | $1.45 | |
| 8258 | I-90 / SR 18 INTERCHANGE WB BRIDGE BRIDGE DECK REH | C.A. CAREY CORPORATION | $0.46 | |
|
Olympic | ||||
|
Cook |
||||
| 7926 | SR 303, MANETTE BRIDGE 303/4A - BRIDGE REPLACEMENT | MANSON-MOWAT, A JOINT VENTURE | $44.13 | |
| 8190 | SR 104, HCB UN ANCHOR CABLE AND HATCH DOG REPAIRS | NORTHWEST UNDERWATER | $0.23 | |
| 8199 | SR 161, 24TH ST EAST TO MILTON WAY WIDENING | TRI-STATE CONSTRUCTION, INC. | $11.93 | |
|
Deffenbacher |
||||
| 8087 | SR 410, WHITE RIVER BRIDGE - BRIDGE SCOUR | SCARSELLA BROS., INC. | $0.22 | |
| 8144 | SR 161, MASHEL RIVER BRIDGE - BRIDGE SCOUR AND SLO | STAN PALMER CONSTRUCTION, INC. | $1.61 | |
| 8157 | SR 167, VICINITY I-5 TO PUYALLUP RIVER BRIDGE - PA | MILES RESOURCES, LLC DBA | $1.23 | |
| 8202 | PIERCE COUNTY PEO TENANT IMPROVEMENTS | PHILLIPS CONSTRUCTION SERVICES, LLC | $0.84 | |
| 8212 | SR 507, EAST GATE ROAD - INSTALL SIGNAL | TST, INC. DBA TRAVERS ELECTRIC | $0.30 | |
| 8245 | SR 167, VIC I-5 TO PUYALLUP RIVER BRIDGE SIDEWALK | ACTIVE CONSTRUCTION, INC. | $0.55 | |
|
Engel |
||||
| 7465 | I-5 GRAND MOUND-MAYTOWN STG 1-ADD LANES | SCARSELLA BROS., INC. | $61.49 | |
| 7866 | SR 410/ 214TH AVE E TO 234TH AVE E- WIDENING | J. R. HAYES & SONS, INC. | $6.78 | |
| 7998 | I-5, GRAND MOUND TO MAYTOWN STAGE TWO - REPLACE IN | TRI-STATE CONSTRUCTION, INC. | $15.52 | |
| 8047 | I-5, EXIT 111 LACEY VIC. NOISE WALLS | MOWAT CONSTRUCTION COMPANY | $2.87 | |
| 8109 | I-5, MARVIN ROAD TO THORNE LANE ITS IMPROVEMENTS | TOTEM ELECTRIC OF TACOMA, INC. | $1.64 | |
| 8251 | I-5, 113TH AVE SW BRIDGE SPECIAL REPAIR | CARTER & COMPANY, INC. DBA CARTER | $0.27 | |
| 8263 | I-5, MOUNTS RD VICINITY TO BERKLEY ST MEDIAN BARRI | CONSTRUCTION AHEAD, INC. DBA | $1.01 | |
| 8267 | SR8/US101 OVERCROSSING SEISMIC RETROFIT SEISMIC RE | MJ HUGHES CONSTRUCTION, INC. | $0.55 | |
|
Ireland |
||||
| 7784 | US 101, MOSQUITO CREEK-FISH PASSAGE | ROGNLIN'S, INC. | $0.73 | |
| 8165 | SR 109 / SR 520 PONTOON GRASS CREEK MITIGATION | ROGNLIN'S, INC. | $1.22 | |
| 8176 | SR 520 - PONTOON GRAYS HARBOR MOORAGE | KIEWIT/GENERAL/MANSON, A JOINT | $4.46 | |
| 8186 | US 101, CHEHALIS RIVER BRIDGE TO OAK ST - ADA RAMP | NOVA CONTRACTING, INC. | $0.75 | |
| 8259 | SR 8, SR 99, US 101, SR 165, SR 167, 2011 OLYMPIC | PETERSEN BROTHERS, INC. | $1.44 | |
|
Matlock |
||||
| 7826 | SR 520 PONTOON CONSTRUCTION DESIGN-BUILD PROJECT | KIEWIT-GENERAL, A JOINT VENTURE | $367.33 | |
|
Moore |
||||
| 7657 | SR 104, 1.2 MI. W HCB - FISH PASSAGE | SETON CONSTRUCTION, INC. | $0.57 | |
| 8234 | US 101, S OF BEACON POINT DR CULVERT REPLACEMENT | THOMPSON BROS. EXCAVATING, INC. | $0.26 | |
|
Nebergall |
||||
| 7974 | I-5 TACOMA HOV MITIGATION | SCARSELLA BROS., INC. | $1.49 | |
| 8218 | SR 167, 24TH ST E BRIDGE SPECIAL REPAIR | PCL CIVIL CONSTRUCTORS, INC. | $0.54 | |
| 8220 | SR 16, OLYMPIC DRIVE NW BRIDGE SPECIAL REPAIR | PCL CIVIL CONSTRUCTORS, INC. | $0.58 | |
|
Uhlmeyer |
||||
| 7537 | SR 704 CROSS-BASE HIGHWAY, SPANAWAY LOOP TO SR 7 | CECCANTI, INC. | $7.35 | |
| 7577 | PURDY CREEK BRIDGE - REPLACEMENT | QUIGG BROS., INC. | $7.70 | |
| 7879 | SR 510 YELM LOOP STAGE 1 STAGE 1 | SCARSELLA BROS., INC. | $4.15 | |
| 7946 | I-5, PORTLAND AVE TO PORT OF TACOMA RD - NB HOV ST | SCARSELLA BROS., INC. | $16.39 | |
| 8129 | I-5 AND SR 16, STORMWATER RETROFIT | CAT WORKS, LLC | $0.47 | |
| 8189 | I-5 / SR16, EASTBOUND NALLEY VALLEY I/C - HOV | MOWAT CONSTRUCTION COMPANY | $74.69 | |
|
South Central | ||||
|
Davari |
||||
| 8033 | US 12, SR 124 INTERSECTION - BUILD INTERCHANGE | SELLAND CONSTRUCTION, INC. | $11.48 | |
| 8244 | US 97, SATUS CREEK VICINITY - REPLACE BR. 97/106 A | WILLIAM CHARLES CONSTRUCTION, LLC | $8.83 | |
| 8255 | SR 124, 1 MILE E OF NEFF RD TO OLD BNRR BRIDGE - P | INLAND ASPHALT COMPANY | $0.82 | |
| 8261 | SR 10, BRISTOL FILL BRIDGE DECK REPLACEMENT | CONWAY CONSTRUCTION COMPANY | $1.38 | |
| 8275 | SCR 2012 REGION-WIDE CHIP SEAL | GRANITE CONSTRUCTION COMPANY | $5.51 | |
|
Preston |
||||
| 7775 | SR410 CLAY CRK OUTFALL WASHOUT REPAIR | WEBER CONSTRUCTION, INC. | $0.44 | |
| 7858 | I-82, VALLEY MALL BLVD. INTERCHANGE REBUILD INTERC | APOLLO, INC. | $19.08 | |
| 7971 | I-90, LAKE EASTON VIC TO BIG CREEK BR VIC EB - REP | ICON MATERIALS DBA CPM DEVELOPMENT | $14.81 | |
| 8029 | SR 823, SELAH VICINITY - REROUTE HIGHWAY (RE-AD) | HURST CONSTRUCTION LLC | $3.57 | |
| 8119 | SR 22/I-82 TO TOPPENISH - SAFETY IMPROVEMENTS | GRANITE CONSTRUCTION COMPANY | $2.14 | |
| 8240 | SR 410, NILE VALLEY LANDSLIDE - RE-CONSTRUCT ROUTE | APOLLO, INC. | $4.08 | |
|
Smith |
||||
| 7852 | I-90, HYAK TO SNOWSHED VICINITY PHASE 1B- ADD LANE | MAX J. KUNEY COMPANY | $76.70 | |
| 8127 | I-90, SNOWSHED TO KEECHELUS DAM PHASE 1C - REPLACE | GUY F. ATKINSON CONSTRUCTION, LLC. | $177.14 | |
| 8317 | I-90, BANDERA RD - BRIDGE REPAIR | GUY F. ATKINSON CONSTRUCTION, LLC. | $1.04 | |
|
Southwest | ||||
|
Newell |
||||
| 7903 | I-5, BLAKESLEE JUNCTION RR XING TO GRAND MOUND I/C | TRI-STATE CONSTRUCTION, INC. | $19.73 | |
| 7984 | SR 105, NORRIS SLOUGH CULVERT REPLACEMENT | BOSS CONSTRUCTION, INC. | $1.77 | |
| 8272 | I-5, MELLEN ST TO BLAKESLEE - STAGE 1 | CASCADE BRIDGE LLC | $21.60 | |
|
Tak |
||||
| 7835 | I-5, SR 432, TALLEY WAY INTERCHANGE | NORTHWEST CONSTRUCTION, INC. | $20.53 | |
| 7895 | SR 433, LEWIS AND CLARK BRIDGE SUPERSTRUCTURE PAIN | ODYSSEY/GERONIMO JV | $33.77 | |
| 8150 | I-5, E FORK LEWIS RIVER BRIDGE TO TODD ROAD VICINI | GRANITE CONSTRUCTION COMPANY | $4.25 | |
|
Tams |
||||
| 7681 | VANCOUVER RAIL PROJECT W. 39TH STREET BRIDGE | CASCADE BRIDGE LLC | $11.65 | |
| 7796 | I-5, SR 501 RIDGEFIELD INTERCHANGE | TAPANI UNDERGROUND, INC. | $15.79 | |
| 7977 | SR14, CAPE HORN BR VIC TO CAPE HORN RD SAFETY IMPR | ROTSCHY, INC. | $4.33 | |
| 8105 | SR 14, CAMAS / WASHOUGAL - ADD LANES AND BUILD INT | TAPANI UNDERGROUND, INC. | $28.62 | |
| 8147 | SR 142, LITTLE KLICKITAT RIVER TO US 97 PAVING | GRANITE CONSTRUCTION COMPANY | $0.81 | |
| 8246 | SR 501, RIDGEFIELD INTERCHANGE STAGE II - ROADWAY | NUTTER CORPORATION DBA NUTTER | $2.82 | |
| 8278 | CLARK CO LN-PRINDLE RD PAVE PAVER | KERR CONTRACTORS, INC. | $2.12 | |
|
Winger |
||||
| 8079 | SR 500, ST. JOHNS BLVD - INTERCHANGE | TAPANI UNDERGROUND, INC. | $27.24 | |
| 8153 | I-5 / I-205, NE 134TH ST INTERCHANGE (I-5 / I-205) | ROTSCHY, INC. | $19.95 | |