Airport |
Sponsor |
Project Description |
State $ |
Federal $ |
|
|
|
|
|
|
|
Pavement: |
|
|
|
|
|
Arlington Municipal
|
City of Arlington
|
Runway 11/29 Crack Seal, Slurry Seal and Re-striping
|
62,370.88
|
|
|
Skagit Regional
|
Port of Skagit County
|
Runway 10/28 Rehabilitation and Wildlife Fencing
|
55,181.88
|
2,096,911.25
|
|
Lake Chelan
|
City of Chelan / Port of Chelan County
|
Pavement Crack Repair/Seal Coat and Guidance Signs
|
2,993.55
|
147,277.24
|
|
Deer Park Municipal
|
City of Deer Park
|
Aircraft Parking Ramp Rehabilitation - Engineering Design
|
5,712.00
|
217,075.00
|
|
Grand Coulee Dam
|
Grant County Port District No. 7
|
Pavement Maintenance
|
4,064.76
|
207,786.01
|
|
Friday Harbor
|
Port of Friday Harbor
|
Crack Seal/Seal Coat all surfaces/Repaint Markings / Asphalt Repair, Project Engineering
|
8,252.18
|
313,583.07
|
|
Lopez Island
|
Port of Lopez
|
Engineering for Taxiway and Apron Rehabilitation, Tie-Down Reconfiguration, Hangar Taxilane Paving and Survey
|
3,745.19
|
142,317.40
|
|
Mansfield
|
Port of Douglas County
|
Aircraft Apron Crack and Fog Seal
|
5,049.90
|
|
|
Omak Municipal
|
City of Omak
|
Construction of Taxiway Turnarounds, Taxilane, Apron, Windsock/Segmented Circle, Distance Remaining Signs, and Holding Position Signs
|
20,230.64
|
768,763.76
|
|
Othello Municipal
|
Port of Othello
|
Runway 7/25 Relocation - Property Acquisition (Phase II) and Grading Design Engineering
|
3,774.55
|
143,432.90
|
|
Renton Municipal
|
City of Renton
|
Seaplane Base Dredging, Mitigation and Habitat Enhancement
|
200,000.00
|
|
|
Rosalia Municipal
|
Town of Rosalia
|
Aircraft Tie-Down Apron Reconstruction (Design Only)
|
890.74
|
33,848.03
|
|
Tacoma Narrows
|
Pierce County
|
Runway 17/35 Rehabilitation - Preliminary Design / Environmental Review
|
5,175.00
|
196,650.00
|
|
Twisp Municipal
|
Town of Twisp
|
Runway Reconstruction and Widening - Phase II
|
192,565.80
|
|
|
Waterville
|
Port of Douglas County
|
Aircraft Apron Crack and Fog Seal
|
5,268.60
|
|
|
Wilbur Municipal
|
Town of Wilbur
|
West Parallel Taxiway - Phase II Construction
|
14,332.73
|
578,577.88
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
$589,608.40 |
$4,846,222.54
|
|
|
|
|
|
|
|
Safety: |
|
|
|
|
|
Auburn Municipal
|
City of Auburn
|
Runway Electrical Improvements
|
8,351.93
|
317,373.26
|
|
Cle Elum Municipal
|
City of Cle Elum
|
Beacon Replacement
|
1,512.50
|
57,475.00
|
|
Darrington Municipal
|
Town of Darrington
|
Acquisition of RPZ Land - Phase II
|
28,500.00
|
|
|
Davenport Municipal
|
City of Davenport
|
Super AWOS - Weather Reporting System
|
2,125.00
|
80,750.00
|
|
Grand Coulee Dam
|
Grant County Port District No. 7
|
Beacon Replacement and Ramp Lighting Improvements
|
1,771.49
|
67,316.57
|
|
Paine Field
|
Snohomish County
|
Noise Monitoring System Upgrade
|
38,500.00
|
|
|
Friday Harbor
|
Port of Friday Harbor
|
Obstruction Survey
|
332.25
|
12,625.50
|
|
Ione Municipal
|
Town of Ione
|
Environmental & Design for Airport Improvements
|
3,947.37
|
150,000.00
|
|
Mansfield
|
Port of Douglas County
|
Threshold Light Relocation
|
6,077.70
|
|
|
Packwood
|
Lewis County
|
2010 Runway Safety Area Improvements - Covering Tailrace
|
11,408.10
|
433,507.65
|
|
William R. Fairchild International
|
Port of Port Angeles
|
Remove GQS Penetrating Obstruction Trees (~38) for Runway 26 LPV Approach
|
37,500.00
|
|
|
Pullman-Moscow Regional
|
City of Pullman
|
Land Acquisition, Drainage Improvements and Dredging, Airport Boundary Survey, and Drainage Master Plan
|
13,880.65
|
527,464.74
|
|
Vashon
|
King County Airport District No. 1
|
Obstruction Removal - Design and Construction
|
5,694.00
|
216,382.00
|
|
Waterville
|
Port of Douglas County
|
Threshold Light and PAPI Relocation
|
32,224.50
|
|
|
|
|
|
|
|
|
|
|
Total |
$191,825.49
|
$1,862,894.72
|
|
|
|
|
|
|
|
Planning: |
|
|
|
|
|
Cle Elum Municipal
|
City of Cle Elum
|
Airport Layout Plan Update
|
875.00
|
33,250.00
|
|
Bowers Field
|
Kittitas County
|
Airport Layout Plan Update & Needs Assessment
|
3,543.75
|
134,663.00
|
|
Strom Field
|
City of Morton
|
Airport Layout Plan and Narrative Report - Phase I
|
6,602.50
|
|
|
Jefferson County International
|
Port of Port Townsend
|
Master Plan Update
|
3,350.00
|
127,300.00
|
|
Quincy Municipal
|
Grant County Port District No. 1
|
Airport Layout Plan and Narrative Report
|
31,495.50
|
|
|
Willapa Harbor
|
Port of Willapa Harbor
|
Airport Layout Plan and Narrative Report
|
27,000.00
|
|
|
Pru Field
|
City of Ritzville
|
Master Plan Update
|
2,298.55
|
87,344.90
|
|
|
|
|
|
|
|
|
|
Total |
$164,000.80
|
$382,557.90
|
|
|
|
|
|
|
|
Security: |
|
|
|
|
|
Moses Lake Municipal
|
City of Moses Lake
|
Security Camera
|
4,500.00
|
|
|
Olympia Regional
|
Port of Olympia
|
Security Camera
|
5,000.00
|
|
|
Prosser
|
Port of Benton
|
Security Camera
|
5,000.00
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total |
$14,500.00
|
|
|
|
|
|
|
|
|
Runway Safety: |
|
|
|
|
|
Colville Municipal
|
City of Colville
|
Runway Safety - Signs, Markings, Vehicle Beacons, and Handheld Radios
|
2,271.51
|
|
|
|
|
Total |
$2,271.51
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Grant Funding |
$962,206.20
|
$7,091,675.16
| |