Airport |
Sponsor |
Project Description |
Amount |
Federal |
|
|
|
|
|
|
|
Pavement: |
|
|
|
|
| * |
Anacortes
|
Port of Anacortes
|
Fog Seal and Re-stripe Runway 18/36, Taxiway A, all Connector Taxiways, and Tie Down Apron; Cold Tar Seal Fueling Pad
|
5,189.00
|
227,154.00
|
| * |
Arlington Municipal
|
City of Arlington
|
Taxiway C & D Improvements - Phase 2 Construction
|
39,031.00
|
1,483,148.00
|
*
|
Bowerman Field
|
Port of Grays Harbor |
Runway and Taxiway Striping/Crack Sealing Design and Construction
|
5,411.95
|
205,654.10
|
*
|
Bowers Field
|
Kittitas County
|
Taxilane and Apron Rehabilitation/ Reconstruction - Phase 2 Construction
|
27,879.00
|
1,134,431.00
|
*
|
Cashmere-Dryden
|
Chelan County
|
Engineering for Taxiway Reconstruction and Runway Seal Coat
|
2,500.00
|
95,000.00
|
|
Colville Municipal
|
City of Colville
|
Application of FAA Approved Emulsified Sealer/Binder to all Paved Surfaces
|
29,856.00
|
|
| * |
Deer Park Municipal
|
City of Deer Park
|
Taxilane and Aircraft Run-up Area Construction
|
11,854.00 |
450,413.00
|
|
Desert Aire
|
Grant County Airport District No. 1
|
Taxiway Rehabilitation and Reconstruction - Design Engineering, Environmental, Permitting, and Geotechnical Testing
|
31,300.00
|
|
|
Ephrata Municipal
|
Grant County Port District No. 9
|
Airfield Pavement Crack Sealing and Weed Control
|
20,000.00
|
|
|
Ferry County (Republic)
|
Ferry County
|
Installation of Curlew State Park Float Plane Docks
|
19,000.00
|
|
|
Mansfield
|
Port of Douglas County
|
Application of FAA Approved Emulsified Sealer/Binder to Runway and Apron
|
24,043.00
|
|
|
Moses Lake Municipal
|
City of Moses Lake
|
Runway and Taxiways Slurry Seal and Pavement Markings
|
72,000.00
|
|
| * |
Odessa Municipal
|
Town of Odessa
|
Engineering Design Services for Airfield Pavement Repair and Improvement
|
581.55
|
22,098.90
|
| * |
Omak
|
City of Omak
|
Taxiway and Ramp Pavement Crack Sealing - Phase 2 Engineering and Construction
|
4,462.30
|
169,567.52
|
|
Orcas Island
|
Port of Orcas
|
EMS Helipad Reconditioning - Project Administration, Engineering, and Construction
|
65,000.00
|
|
| * |
Othello Municipal
|
Port of Othello
|
Land Acquisition, Environmental Assessment, and Preliminary Engineering to Relocate Runway 7/25
|
25,925.00
|
985,150.00
|
| * |
Port of Whitman Business Air Center
|
Port of Whitman County
|
Parallel Taxiway Construction
|
25,625.00
|
973,750.00
|
| * |
Pullman-Moscow Regional
|
City of Pullman
|
GA Reconstruction - Phase 4
|
33,957.00
|
1,290,393.00
|
| * |
Rosalia Municipal
|
Town of Rosalia
|
Design, Environmental and Phase I Construction for Rehabilitation of Existing Runway 2/20
|
2,105.00
|
80,000.00
|
|
Sand Canyon
|
City of Chewelah
|
Application of FAA Approved Emulsified Sealer/Binder to Runway
|
25,906.50
|
|
|
Twisp Municipal
|
Town of Twisp
|
Design Engineering and Cultural Resources Survey for Runway Overlay and Widening
|
64,315.00
|
|
|
Waterville
|
Port of Douglas County
|
Application of FAA Approved Emulsified Sealer/Binder to Runway, Taxilanes, and Apron; Design/Engineering for Reconstruction of Taxiway and Apron - Includes Cultural Resources Survey, SEPA and Permits
|
61,866.00
|
|
|
Willapa Harbor
|
Port of Willapa Harbor
|
Apron Overlay
|
84,370.00
|
|
|
Willard Field
|
City of Tekoa
|
Crack Sealing, Fog Sealing, Centerline and Hold Line Markings
|
19,050.00
|
|
|
|
|
Total |
$701,227.30 |
$7,116,759.52
|
|
|
|
|
|
|
|
Safety: |
|
|
|
|
*
|
Bowerman Field
|
Port of Grays Harbor
|
Runway 6 LPV Approach Development and Runway 24 ILS Glide Slope Raising - Phase 3 Engineering of ILS Obstructions; Preliminary Design Engineering and Construction of Rotating Beacon and Electrical Building
|
2,100.00
|
79,800.00
|
|
Darrington Municipal
|
Town of Darrington
|
Property Appraisal and Acquisition of 12 Acres of DNR Land; Runway Safety Area Tree Removal
|
92,625.00
|
|
|
Deer Park Municipal
|
City of Deer Park
|
Ground-to-Air Radio Installation in Snow Removal Equipment
|
797.00
|
|
*
|
Lopez Island
|
Port of Lopez
|
Airport Wildlife/Security Fencing
|
7,094.00
|
269,559.00
|
|
Okanogan Legion
|
City of Okanogan
|
Install Two Additional Aircraft Tie Downs
|
900.00
|
|
|
Orcas Island
|
Port of Orcas
|
Flush Mount Lighting - Conduit/Cable to Electrical Building
|
5,000.00
|
|
|
Pangborn Memorial
|
Ports of Chelan & Douglas Counties
|
Purchase and Install Runway 30 Approach Alignment Lighting System
|
47,500.00
|
|
*
|
Port of Whitman Business Air Center
|
Port of Whitman County
|
Runway Safety Area Grading (Both Runway Ends)
|
625.00
|
23,750.00
|
*
|
Pullman-Moscow Regional
|
City of Pullman
|
Mid-Field Internally Lit LED Wind Sock
|
375.00
|
14,250.00
|
| * |
Wilbur Municipal
|
Town of Wilbur
|
Unlighted Hold Signs and Property and Easement Acquisition: Runway Extension and RPZs = 51 Acres - AOAs = 10.5 Acres
|
3,870.00
|
147,040.00
|
|
Willard Field
|
City of Tekoa
|
Relocate Threshold Lights
|
9,975.00
|
|
|
Wilson Creek
|
Town of Wilson Creek
|
Relocate Runway 10/28 Thresholds
|
5,406.40
|
|
|
|
|
Total |
$176,267.40
|
$534,399.00
|
|
|
|
|
|
|
|
Planning: |
|
|
|
|
|
Ferry County (Republic)
|
Ferry County
|
Airport Layout Plan and Narrative Report
|
31,500.00
|
|
|
Lynden Municipal
|
City of Lynden
|
Airport Layout Plan and Narrative Report
|
31,820.00
|
|
|
Moses Lake Municipal
|
City of Moses Lake
|
Airport Layout Plan and Narrative Report
|
30,400.00
|
|
|
New Warden
|
City of Warden
|
Airport Layout Plan and Narrative Report
|
37,240.00
|
|
| * |
Odessa Municipal
|
Town of Odessa |
Preliminary Engineering and Environmental Services for an Environmental Assessment
|
2,842.81
|
108,026.88
|
| * |
Sanderson Field
|
Port of Shelton
|
Master Plan/Airport Layout Plan Update
|
2,037.77
|
77,435.45
|
|
Spokane International
|
Spokane Airports
|
Third Runway Alignment Analysis/Study
|
150,000.00
|
|
|
Tonasket Municipal
|
City of Tonasket
|
Airport Layout Plan and Narrative Report
|
33,250.00
|
|
|
Wilson Creek
|
Town of Wilson Creek
|
Detailed Planning/Engineering for Taxiways and Building Area Development
|
12,000.00
|
|
|
|
|
|
|
|
|
|
|
Total |
$331,090.58
|
$185,462.33
|
|
|
|
|
|
|
|
Maintenance: |
|
|
|
|
|
Quincy Municipal
|
Port of Quincy
|
Weed Control and Sterilization
|
9,000.00
|
|
|
|
|
Total |
$9,000.00
|
|
|
|
|
|
|
|
|
Security: |
|
|
|
|
|
Cashmere-Dryden
|
Chelan County
|
Security/Entry Gate
|
5,000.00
|
|
|
Chehalis-Centralia
|
Chehalis-Centralia Airport Board
|
Security Camera System and Signage
|
5,000.00
|
|
|
Columbia Gorge Regional
|
City of the Dalles
|
Security Camera System, Lighting and Signage
|
4,750.00
|
|
|
Colville Municipal
|
City of Colville
|
Entrance Gate with Electronic Controls and Four Camera Security System
|
4,750.00
|
|
|
Desert Aire
|
Grant County Airport District No. 1
|
Security Fencing - Apron Area, Pumphouse Drive, Emergency Road
|
5,000.00
|
|
|
Ed Carlson Memorial - South Lewis County
|
Lewis County
|
Security Cameras
|
5,000.00
|
|
|
Goldendale Municipal
|
City of Goldendale
|
30' North Taxiway Rolling Security Gate
|
5,000.00
|
|
|
Grove Field
|
Port of Camas Washougal
|
Security Cameras and Perimeter Fence Signage
|
5,000.00
|
|
|
Lopez Island
|
Port of Lopez
|
Security Camera and Fencing
|
5,000.00
|
|
|
Lynden Municipal
|
City of Lynden
|
Airport Entry Gate
|
5,000.00
|
|
|
Olympia Regional Airport
|
Port of Olympia
|
Pedestrian Security Gates with Monitoring Stations
|
5,000.00
|
|
|
Packwood Airport
|
Lewis County
|
Security Camera
|
5,000.00
|
|
|
Pearson Field
|
City of Vancouver
|
Keypad Entry Access Gate; Fencing
|
5,000.00
|
|
|
Pullman-Moscow Regional
|
City of Pullman
|
General Aviation Area Security Camera System
|
5,000.00
|
|
|
Sand Canyon
|
City of Chewelah
|
Security Signage; Runway Ramp, Hangar and Tie Down Lighting
|
4,500.00
|
|
|
|
|
Total |
$74,000.00
|
|
|
|
|
|
|
|
|
Runway Safety:
|
|
|
|
|
|
Mansfield
|
Port of Douglas County
|
Hold Short Markings, Hold Short Signs, and Hand Held Radios
|
2,500.00
|
|
|
Olympia Regional Airport
|
Port of Olympia
|
Pedestrian Security Gates with Monitoring Stations
|
2,500.00
|
|
|
Waterville
|
Port of Douglas County
|
Hold Short Markings, Hold Short Signs, and Hand Held Radios
|
2,500.00
|
|
|
|
|
Total
|
$7,500.00
|
|
|
|
|
|
|
|
|
Other: |
|
|
|
|
| * |
Pullman-Moscow Regional
|
City of Pullman
|
GA Fuel Farm Reconstruction
|
15,478.00
|
588,179.00
|
|
Willard Field
|
City of Tekoa
|
South Property Acquisition
|
20,140.00
|
|
|
|
|
Total
|
$35,618.00
|
$588,179.00
|
|
* Match to Federal Grant Funds |
|
Total Grant Funding |
$1,334,703.28
|
$8,424,799.85
| |