South Central Washington Cameras

Alerts

As of 4/26/2018 2:40 AM
Blocking Incidents
  • SR 410 Chinook Pass (elev. 5,430 feet) is closed for the season to through traffic from milepost 57 near Crystal Mountain Boulevard, about 12 miles northwest of the summit, to milepost 74 near Morse Creek, five miles east of the summit.
  • SR 123 Cayuse Pass (elev. 4,675 feet) is closed for the season within the boundaries of Mount Rainier National Park between Crystal Mountain Boulevard and the Stevens Canyon Road entrance.
  • US 97 milepost 65 Branch Road southbound: There is a right lane closure for pending railroad crossing repair work for damaged concert panels. Use caution when crossing the tracks.
Construction Closures
  • I-82 milepost 132 Columbia River Bridge: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane.
  • I-82 westbound between milepost 24 and milepost 29: Thursday April 26 between the hours of 6:30 a.m. and 4 p.m. each day there will be lane closures as crews seal the roadway. This work is weather dependent.
  • US-12 westbound milepost 185 near the junction with SR-410 to milepost 170 near Bear Canyon: Monday April 23 through Thursday April 26 between the hours of 7 a.m. to 4 p.m. expect single lane flagged traffic for maintenance work. Travelers will experience brief delays.
  • US-97 milepost 135 west of Dolarway intersection: City of Ellensburg crews will be installing new power and gas lines. Work will take place Monday through Friday during daylight hours. Crews will be working off the roadway near the fence and there should be no impact to traffic.
  • I-82 eastbound between milepost 33, Exit 33 Yakima Ave. and milepost 34, Exit 34 Nob Hill Blvd: Monday through Friday during daylight hours, Yakima City crews will be installing a new sewer line along the fence line. Crews will be working off the roadway on the shoulder and there should be no impact to traffic.
  • I-82 westbound milepost 116 to 118: Thursday April 26, between the hours of 8 a.m. to 4 p.m. there will be a right lane closure for curb repairs. This work is weather dependent.
  • SR-397 both directions milepost 1 to milepost 3: Thursday April 26 from 8 a.m. to 4 p.m., there will flagged traffic control as WSDOT crews seal the roadway. This work is weather dependent.
  • I-90 both directions milepost 104 to milepost 109: Friday April 27 between 9 a.m. and 12 p.m. drivers should prepare for intermittent rolling slowdowns and possible added travel time.
Special Events
  • None reported