Evergreen Point Bridge Maintenance Problems, (First Annual Report)

This report completely describes the instrumentation on the drawspan of the Evergreen Point Bridge. The design and construction of the data recording system, with the complete calibration of the measurement and collection system is given. Initial data collection and preliminary analysis is set out. The analysis was subsequently abandoned, the data was retained.

Publication Date: 
Friday, August 1, 1975
Publication Number: 
WA-RD 044.2
Last modified: 
10/12/2016 - 15:40
C.B. Brown.
University of Washington. Dept. of Civil Engineering.
Number of Pages: 
Bridge anchorages, Data collection, Fatigue (Mechanics), Highway bridges, Instrumentation, Maintenance, Pontoon bridges, Service life, Strain (Mechanics), Structural deterioration and defects, Water waves, Wind.