﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="wsdot:urlManipulator" xmlns:dateManipulator="wsdot:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - Northwest Region News</title>
    <link>http://www.wsdot.wa.gov/Regions/NorthWest/News/</link>
    <copyright>
          Copyright WSDOT 2006. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor></managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Thu, 24 Jul 2008 01:45:34 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - Northwest Region News</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/Regions/NorthWest/News/</link>
    </image>
    <item>
      <title>New shorter schedule for weekend lane closures on southbound I-5 Ship Canal Bridge in Seattle</title>
      <pubDate>Thu, 24 Jul 2008 05:12:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_I5ShipCanalSecondWeekendClosure.htm</link>
      <description>For the second weekend in a row, WSDOT bridge maintenance crews will close lanes on Interstate 5 Ship Canal Bridge to repair damaged pavement.</description>
    </item>
    <item>
      <title>Join the conversation with the new Guide Meridian blog</title>
      <pubDate>Thu, 24 Jul 2008 01:27:52 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_539newprojectblog.htm</link>
      <description>Drivers, residents and travelers interested in joining the conversation about the Guide Meridian (SR 539) widening project in Whatcom County have a new way to make their voices heard.</description>
    </item>
    <item>
      <title>Lane closed on Mount Baker Highway at Britton Road in Bellingham</title>
      <pubDate>Wed, 23 Jul 2008 22:00:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_sr542brittonroadlanesclosed.htm</link>
      <description>Drivers can expect delays and slowdowns on June 23 and 24 at the Britton Road intersection on Mount Baker Highway (SR 542).</description>
    </item>
    <item>
      <title>Nighttime lane closures planned on I-5 through south Everett this week</title>
      <pubDate>Wed, 23 Jul 2008 07:08:55 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/23_EverettClosures.htm</link>
      <description>SEATTLE – Some late night and early morning drivers could have an extended trip through south Everett this week due to a series of lane closures on Interstate 5. Crews working for WSDOT will close two lanes of northbound I-5 on Wednesday, July 23 and the two left lanes of southbound I-5 on Thursday, July 24 to stripe the roadway. The work is part of Sound Transit’s South Everett Freeway Station project.</description>
    </item>
    <item>
      <title>Shoring up for safety: I-5 Everett crews start expansion joint repair</title>
      <pubDate>Wed, 23 Jul 2008 02:02:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22_I5ExpJt.htm</link>
      <description>Starting Wednesday, July 23 crews will repair a dozen expansion joints on I-5 between Marine View Drive and 41st Street.</description>
    </item>
    <item>
      <title>Tacoma Narrows Bridge project team takes top honors</title>
      <pubDate>Tue, 22 Jul 2008 22:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/22_TNBTopHonors.htm</link>
      <description>The Western Association of State Highway Transportation Officials (WASHTO) this week awarded one of its highest honors, the “America’s Transportation Award,” to the Washington State Department of Transportation's new Tacoma Narrows Bridge project.</description>
    </item>
    <item>
      <title>I-5 lane and ramps closed at night in Burlington next week</title>
      <pubDate>Sat, 19 Jul 2008 04:04:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_i5lanesrampsclosed.htm</link>
      <description>Crews will close one lane and two ramps next week on I-5 in Burlington to begin improvements to the SR 20 interchange.</description>
    </item>
    <item>
      <title>Lower speed limit for drivers in SR 20 work zone near Deception Pass</title>
      <pubDate>Fri, 18 Jul 2008 23:12:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_SpeedLimitReduction.htm</link>
      <description>WSDOT will temporarily lower the speed limit for three miles on SR 20, near Deception Pass, to improve safety for drivers and construction workers.</description>
    </item>
    <item>
      <title>Crews start paving SR 525 in Clinton on Sunday night</title>
      <pubDate>Fri, 18 Jul 2008 22:46:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/18_ClintonPavingBegins.htm</link>
      <description>For the next week, crews will work at night on State Route 525 on Whidbey Island.</description>
    </item>
    <item>
      <title>I-5 lane closed around the clock next week near Bellingham</title>
      <pubDate>Fri, 18 Jul 2008 02:48:10 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/17_i5lanesclosednextweek.htm</link>
      <description>The around-the-clock lane closure north of Bellingham will end Friday morning. It will start again Sunday evening and last for one more week while crews to continue removing and replacing broken concrete panels.</description>
    </item>
    <item>
      <title>Overnight lane closures on I-5 through south Everett</title>
      <pubDate>Thu, 17 Jul 2008 04:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/I-5ClosuresInSouthEverett.htm</link>
      <description>SEATTLE – Drivers in south Everett should expect delays Thursday night as crews close two lanes in both directions of Interstate 5. Crews will stripe the on-and off-ramps to the new park and ride lot and part of I-5 under the 112th Street bridge.  The work is part of Sound Transit’s South Everett Freeway Station project.</description>
    </item>
    <item>
      <title>Artist Point to open Friday morning</title>
      <pubDate>Thu, 17 Jul 2008 01:24:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_sr542artistpointopensfriday.htm</link>
      <description>Crews will open the last mile of the road to Artist Point at 8 a.m. Friday, July 18. The 2.7-mile stretch of Mount Baker Highway (SR 542) has been closed since September 28, 2007. Artist Point boasts 360-degree views of Mount Shuksan and Mount Baker, as well as access to a variety of trails.</description>
    </item>
    <item>
      <title>Crews open new lane on SR 20 near Burlington</title>
      <pubDate>Thu, 17 Jul 2008 01:13:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_Fredonia1Complete.htm</link>
      <description>WSDOT opened the wider, safer two-mile stretch of roadway near Burlington to eastbound drivers Tuesday afternoon, July 15.</description>
    </item>
    <item>
      <title>Weekend lane closures on I-5 Ship Canal Bridge in Seattle</title>
      <pubDate>Wed, 16 Jul 2008 23:41:26 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/16_I5ShipCanalLaneClosures.htm</link>
      <description>Drivers traveling through Seattle can expect weekend lane closures on the Interstate 5 Ship Canal Bridge for the next two weekends as WSDOT crews repair potholes on the upper bridge deck.</description>
    </item>
    <item>
      <title>I-5 bridge repairs finished early in Burlington</title>
      <pubDate>Wed, 16 Jul 2008 05:39:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/15_i5bridgerepairscomplete.htm</link>
      <description>Bridge crews finished temporary repairs on the damaged Chuckanut Drive overpass (exit 231) in Burlington two nights earlier than expected. Both lanes of Chuckanut Drive over I-5 will reopen this afternoon. Crews are in the process of picking up cones and changing weight restriction signs.</description>
    </item>
    <item>
      <title>Foundation work for new I-5 ramps to start Wednesday in Burlington</title>
      <pubDate>Tue, 15 Jul 2008 04:04:50 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/14_SR20PilingWorkBegins.htm</link>
      <description>A machine will act like a giant hammer to pound concrete 72 pilings into the ground. The pilings will support the new bridge that will become the southbound I-5 on- and off-ramps at the SR 20 intersection.</description>
    </item>
    <item>
      <title>Intermittent closures planned at intersection of Guide, Pole roads</title>
      <pubDate>Mon, 14 Jul 2008 23:04:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/14_SR539PoleRoadWork.htm</link>
      <description>Drivers can expect travel disruptions and delays on the Guide Meridian on Monday and Tuesday nights, July 14-15, as Puget Sound Energy crews wrap up underground cable work</description>
    </item>
    <item>
      <title>Further inspections reveal severe damage to I-5 overpass in Burlington</title>
      <pubDate>Sat, 12 Jul 2008 04:58:01 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/11_i5bridgedamageatchuckanut.htm</link>
      <description>Further inspections of the damage to the Chuckanut Drive overpass (exit 231) over I-5 in Burlington confirmed engineers’ worst fears. The battered bridge support beams will have to be replaced.</description>
    </item>
    <item>
      <title>I-5 lanes and ramps closed at night through Bellingham next week</title>
      <pubDate>Sat, 12 Jul 2008 04:09:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/11_i5laneandrampclosures.htm</link>
      <description>Crews will close lanes and ramps next week on I-5 in Bellingham to finish sealing new concrete panels and to install guardrail.</description>
    </item>
    <item>
      <title>SR 20 paving south of Oak Harbor starts Tuesday</title>
      <pubDate>Sat, 12 Jul 2008 04:07:34 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/11_sr20pavingsouthofoakharbor.htm</link>
      <description>Crews will start laying the final layer of asphalt on SR 20 south of Oak Harbor on Tuesday night, July 15, and plan to finish the work in two weeks, as long as the weather stays nice.</description>
    </item>
    <item>
      <title>WSDOT forms advisory committee for Aurora Bridge fence project in Seattle</title>
      <pubDate>Fri, 11 Jul 2008 23:30:32 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_99aurorabridgefence.htm</link>
      <description>Design is under way on a WSDOT project to deter people from jumping off of the State Route 99 Aurora Bridge in Seattle.  WSDOT has formed an advisory committee to represent community, business and local government interests as the design moves forward.</description>
    </item>
    <item>
      <title>Bridge over I-5 damaged by tall load in Burlington: Weight restrictions imposed indefinitely</title>
      <pubDate>Fri, 11 Jul 2008 08:25:27 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_11chuckanutdriveoverpass.htm</link>
      <description>A truck towing an excavator on northbound I-5 hit and severely damaged the SR 11 Chuckanut Drive overpass in Burlington Thursday, July 10. Three of the six bridge girders had concrete and rebar damage. The girders are the structural support beams for the bridge.</description>
    </item>
    <item>
      <title>SR 9 closed next weekend while crews install culvert</title>
      <pubDate>Fri, 11 Jul 2008 03:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_sr9culvertclosure.htm</link>
      <description>Next weekend, crews will close State Route 9 near Arlington to install a six-foot square box culvert beneath the highway at Kackman Creek.</description>
    </item>
    <item>
      <title>I-5 lane closed for one week north of Bellingham</title>
      <pubDate>Fri, 11 Jul 2008 02:45:11 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/10_i5weeklonglaneclosures.htm</link>
      <description>More I-5 lane closures are in store for Bellingham drivers. This time they’ll be north of Bellingham and not in the heart of town. One lane will close around the clock for one week starting Sunday night, July 13, as crews remove and replace broken concrete panels.</description>
    </item>
    <item>
      <title>Closures this weekend for paving on SR 900 in Tukwila</title>
      <pubDate>Thu, 10 Jul 2008 06:12:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/9_SR900Paving.htm</link>
      <description>Crews working for WSDOT will pave a portion of State Route 900 (Martin Luther King Junior Way S.) in Tukwila this weekend.  Crews will remove deteriorating pavement, rebuild the roadbed and repave the highway between the northbound Interstate 5 exit to SR 900 and the intersection at S. Boeing Access Road/S. Ryan Way.</description>
    </item>
    <item>
      <title>Annual inspection to close SR 520 Evergreen Point floating bridge this weekend</title>
      <pubDate>Wed, 09 Jul 2008 05:10:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/08_SR520BridgeClosure.htm</link>
      <description>Washington State Department of Transportation crews will close the SR 520 Evergreen Point floating bridge beginning at 11 p.m. Friday, July 11 for its annual inspection and maintenance work.</description>
    </item>
    <item>
      <title>WSDOT starts search for design-builder to construct SR 532 corridor improvements</title>
      <pubDate>Tue, 08 Jul 2008 04:54:33 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/7_532LOI.htm</link>
      <description>The Washington State Department of Transportation is soliciting letters of interest from companies planning to apply to provide design-build services for a project to improve the SR 532 corridor between Camano Island and I-5.</description>
    </item>
    <item>
      <title>Seattle to Portland Bicycle Classic - July 12 and 13; Drivers Encouraged to Allow Extra Travel Time</title>
      <pubDate>Tue, 08 Jul 2008 04:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/07_STP_route_impacts.htm</link>
      <description>Organizers predict a record 9,500 bicyclists will be on local roads and highways for the 2008 Group Health Seattle to Portland Bicycle Classic (STP). The 200-mile ride between Seattle and Portland is schedule for Saturday, July 12 and Sunday, July 13.</description>
    </item>
    <item>
      <title>SR 169 bridge over Green River open in both directions</title>
      <pubDate>Mon, 07 Jul 2008 22:05:25 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/07_SR169GreenRiverRepair.htm</link>
      <description>Both directions of SR 169 at the Kummer bridge near Black Diamond opened at 6:10 p.m. Thursday, July 3, after crews finished emergency repair work.</description>
    </item>
    <item>
      <title>Flammable cargo restricted on I-5 under Convention Center</title>
      <pubDate>Thu, 03 Jul 2008 22:29:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/3_I-5FlammableRestriction.htm</link>
      <description>SEATTLE - WSDOT will restrict flammable cargo in both directions of I-5 under the Washington State Convention and Trade Center in Seattle from 7 a.m. to 4 p.m. on Tuesday, July 8.</description>
    </item>
    <item>
      <title>Four new cameras to view I-90 near Snoqualmie Pass</title>
      <pubDate>Thu, 03 Jul 2008 03:58:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/07/2_NewcamerasonI90.htm</link>
      <description>WSDOT provides four new portable cameras to keep an eye on I-90 traffic near Snoqualmie Pass</description>
    </item>
    <item>
      <title>Crews begin noise wall construction project along southbound I-5 in north Seattle</title>
      <pubDate>Tue, 01 Jul 2008 07:26:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/063008_noisewall.htm</link>
      <description>Starting this week, construction crews working for WSDOT will take the first steps toward building new noise walls along southbound Interstate 5 in the Green Lake and Licton Springs neighborhoods of Seattle.</description>
    </item>
    <item>
      <title>Alaskan Way Viaduct and Seawall Replacement program moving forward:  Environmental assessment for removing one mile of viaduct made public</title>
      <pubDate>Tue, 01 Jul 2008 04:59:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30-awv_ea.htm</link>
      <description>The Washington State Department of Transportation (WSDOT) and the Federal Highway Administration (FHWA) took another step toward replacing the Alaskan Way Viaduct. WSDOT and FHWA have released the environmental assessment for the South Holgate Street to South King Street Viaduct Replacement Project. This project is adjacent to and south of the stadiums and will replace one mile, or approximately 40 percent, of the vulnerable Alaskan Way Viaduct.</description>
    </item>
    <item>
      <title>Last of 2005 gas tax phases takes effect July 1</title>
      <pubDate>Tue, 01 Jul 2008 04:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30_last-2005-gas-tax-phase.htm</link>
      <description>OLYMPIA - The final 1.5-cent gas tax increase from the 2005 transportation revenue package takes effect July 1.</description>
    </item>
    <item>
      <title>Where's WSDOT? Track the trek to Artist Point on the Web</title>
      <pubDate>Tue, 01 Jul 2008 03:37:42 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30_sr542roadtoartistpoint.htm</link>
      <description>Experience the trek through the snow to Artist Point like never before. Follow crews virtually on the WSDOT Web site as they work their way to one of the highest lookouts in the state. Artist Point sits more than 5,000 feet above sea level at the end of Mount Baker Highway and spends most of the year buried beneath snow.</description>
    </item>
    <item>
      <title>Tolls on Tacoma Narrows Bridge increase July 1</title>
      <pubDate>Tue, 01 Jul 2008 01:50:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/30_tolls-tacoma-narrows-bridge.htm</link>
      <description>GIG HARBOR – Toll rates on the Tacoma Narrows Bridge increase to $4.00 for cash toll payers and $2.75 for electronic toll payers, effective July 1, 2008 through June 30, 2009.</description>
    </item>
    <item>
      <title>WSDOT contractors begin repair work on SR 169</title>
      <pubDate>Sat, 28 Jun 2008 02:42:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/27_SR169Repair.htm</link>
      <description>WSDOT contractors will begin emergency repair work on State Route 169 a day earlier than planned in an effort to get in, get the work done, and get out before the July Fourth holiday weekend.</description>
    </item>
    <item>
      <title>Construction affects I-90 express lane schedule</title>
      <pubDate>Fri, 27 Jun 2008 21:50:57 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/27_I90TemporaryExpressLaneSchedule.htm</link>
      <description>Beginning Monday, June 30 drivers will notice big barrels and attenuator trucks on the I-90 express lanes on Mercer Island, along with temporary changes to the express lane schedule.</description>
    </item>
    <item>
      <title>SR 9 near Arlington closed all weekend as crews reach major milestone</title>
      <pubDate>Fri, 27 Jun 2008 06:51:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26_SR9Schloman.htm</link>
      <description>Crews are getting ready to open a new segment of State Route 9 near Arlington next week. Starting Friday night, drivers should plan to take an alternate route as crews close SR 9 for the weekend in order to connect the new roadway with the existing highway.</description>
    </item>
    <item>
      <title>Draft solution packages for central section of Alaskan Way Viaduct and Seawall released</title>
      <pubDate>Fri, 27 Jun 2008 06:49:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26-viaductsolutions.htm</link>
      <description>The State of Washington, King County, and the City of Seattle released draft solution packages today that will be evaluated as ways to keep people and goods moving when the central section of the Alaskan Way Viaduct is taken down in 2012. The packages consist of SR 99 options, coupled with improvements to transit, I-5, the downtown street grid, and transportation management strategies.</description>
    </item>
    <item>
      <title>Best times to travel for Independence Day Weekend</title>
      <pubDate>Fri, 27 Jun 2008 06:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26_fourth_july_travel.htm</link>
      <description>OLYMPIA – Fourth of July is a Friday for 2008 and WSDOT’s Web site offers new tools for drivers hitting the road.</description>
    </item>
    <item>
      <title>Seafair Marathon to close eastbound SR 520 floating bridge</title>
      <pubDate>Fri, 27 Jun 2008 05:50:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/626_520SeafairClosure.htm</link>
      <description>Drivers should expect closures of eastbound SR 520 and the floating bridge from 6:45 a.m. to 9 a.m. on Sunday, June 29 for this year’s VM Team Medicine Seafair Marathon.</description>
    </item>
    <item>
      <title>Work on second Wiser Lake bridge under way</title>
      <pubDate>Fri, 27 Jun 2008 04:31:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/26_539WiserLakeBridge.htm</link>
      <description>Crews will begin building a widened causeway across the lake Monday, June 30, to support the two additional Guide Meridian lanes.</description>
    </item>
    <item>
      <title>US 2 brimming with summertime activity – bicyclists, construction crews and motorists will share the road</title>
      <pubDate>Thu, 26 Jun 2008 23:31:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_2BicyclistsAndSummerConstruction.htm</link>
      <description>US 2 brimming with summertime activity – bicyclists, construction crews and motorists will share the road</description>
    </item>
    <item>
      <title>Drivers should expect delays on SR 529 between Everett and Marysville Wednesday</title>
      <pubDate>Thu, 26 Jun 2008 23:10:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/24_529BridgeInspectionClosures.htm</link>
      <description>Drivers should expect delays on SR 529 between Everett and Marysville Wednesday
WSDOT crews will inspect two bridges</description>
    </item>
    <item>
      <title>WSDOT crews assess unstable slope south of SR 169 bridge near Black Diamond</title>
      <pubDate>Wed, 25 Jun 2008 07:20:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/24_SR169Slide.htm</link>
      <description>WSDOT crews have completed the emergency drill work on the unstable slope south of the Dan Evans Bridge over the Green River on State Route 169. WSDOT geotechnical experts have concluded the slope is too unstable to allow traffic on the northbound lane. The bridge will reopen to one lane of alternating traffic on the southbound lane by 7 p.m. Tuesday.</description>
    </item>
    <item>
      <title>Unstable slope under SR 169 bridge near Enumclaw forces WSDOT to perform emergency inspections and repairs</title>
      <pubDate>Tue, 24 Jun 2008 08:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_SR169GreenRiver.htm</link>
      <description>Unstable slope under SR 169 bridge near Enumclaw forces WSDOT to perform emergency inspections and repairs</description>
    </item>
    <item>
      <title>Wait times now available for all four border crossings</title>
      <pubDate>Tue, 24 Jun 2008 02:45:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_i5borderwaittimes.htm</link>
      <description>Drivers can choose the border crossing with the shortest lines by taking advantage of new border wait times provided by the Washington State Department of Transportation.</description>
    </item>
    <item>
      <title>Help shape the future of I-5 in Bellingham</title>
      <pubDate>Mon, 23 Jun 2008 23:05:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/23_i5masterplanopenhouse.htm</link>
      <description>WSDOT recently finished researching and analyzing I-5 through Bellingham and found problems that need funding and improvements. The community is invited to learn more about the problems and discuss improvements at an open house this week.</description>
    </item>
    <item>
      <title>Quarterly inspection shows repairs may have halted Alaskan Way Viaduct settlement</title>
      <pubDate>Sat, 21 Jun 2008 00:50:23 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2008/06/20-viaductinspectionresults.htm</link>
      <description>Results from last week's inspection of the Alaskan Way Viaduct showed no structural damage or additional settlement of the columns between Columbia Street and Yesler Way. WSDOT completed work in April to strengthen the column foundations in that area.</description>
    </item>
  </channel>
</rss>