
This is the new bicycle/pedestrian sidewalk on bridge 14 when the project was complete on July 30th, 2008.

An example of deteriorated bridge rail.

This bridge rail is actually broken.

An example of sidewalk damage that was repaired. (See after photo, above)

Rails were upgraded on this steel bridge at milepost 4.

The Methow River Bridge at milepost 10.

The Methow River Bridge at milepost 14.

The Methow River Bridge at milepost 15.

The temporary signal in operation at Bridge #10 on April 30th, 2008.

Temporary barrier being installed on Bridge #4 on April 30th, 2008