Skip Top Navigation

North Central Region Completed Projects

Paving A - thumbnail
The 2014 NCR Seal is the largest ever, resurfacing 238 miles of roadway on 10 state highways in 5 counties.

2013 Completed Projects:

US 97 - North of Riverside Passing Lane

SR 26 - SR 24 - Othello Intersection Improvement - Stage 2

US 2 - East of Coles Corner - Box Culvert

US 2 - Chiwaukum Creek

2012 Completed Projects:

US 97A - S of Rocky Reach Dam Slope Stabilization

US 97 - North Blewett Pass - Safety Improvements

US 2 - Intersection Improvements at Peshastin

US 2 - Stevens Pass - Variable Message Signs

North Central Region Seal 2012

2011 Completed Projects:

US 2/West of Leavenworth - Slope stabilization

SR 20/North Cascades Highway – Drainage Repair

SR 17/Moses Lake Vicinity-Median Barrier

US 97A - Wildlife Fence

SR 20/North Cascades Hwy – Chip Seal

NCR Seal 2011

SR 171 Moses Lake - Paving

NCR Signal and Illumination Rebuild

US 2 Stevens Pass-Recessed Plastic Edge Lines

SR 28 - US 2/97 - Eastmont Ave. - Intersection Improvements

SR-26 Grant County Line to SR-17 Paving

SR 243 - Intersection Illumination

NCR Sign Update 2011

NCR Major Drainage 2011

US 97 - Blewett Pass - Passing Lane

US 97A - North of Wenatchee - Slope Stabilization

SR 150 3 Miles E. of Manson – Slope Stabilization

SR 155 / S of Electric City – Rock Slopes Scaling

SR 285 - Sen. George Sellar Bridge - Additional Eastbound Lane

2010 Completed Projects:

SR 28 - East Wenatchee To Rock Island - Paving

US 2 - Stevens Pass Summit - Pedestrian Safety

US 97 - South of Chelan Falls - Passing Lane

US 97 - Orondo Northward Paving

SR 20 Wauconda Summit East Pavement Repair

North Central Region Seal 2010

North Central Region Seal 2010 - Stage 2

NCR Guardrail Update 2010

SR 26 - West of Othello - Passing Lane

SR 28 - Jct. US 2/97 to 9th Street - Stage 1

SR 26 - Othello at First St - Stage 1

SR 150 - W of Chelan - Install Lighting

SR 971 - S Lakeshore Rd - Intersection Illumination

SR 17 - Intersection Illumination

2009 Completed Projects:

US 97A - Wildlife Fence - Stage 1

SR 17 / SR 282 - Moses Lake to Ephrata - Paving and Passing Lanes

SR 17 - North of Moses Lake - Add Passing Lane

SR 17 - Grant County Airport North - Paving

SR 282 - Ephrata South - Paving

I-90 - Moses Lake - Paving

US 2 - East of Orondo - Unstable Slopes

Blewett Pass Emergency Flood Repair - Stage 2

US 2/West Side of Stevens Pass-Electronic Signage

SR 155 - Omak Eastward - Chip Seal

SR 243 - Mattawa Vicinity - Chip Seal

SR 262 - Potholes Reservoir Area - Chip Seal

US 97 - Eight miles south of US 2 Intersection - Unstable Slope

US 97 - North of Blewett Pass - Unstable Slope

US 97 - South of Tonasket - Bridge Deck Repair

SR 28 - Quincy Area - Paving

North Central Region Seal 2009

SR 20 - W. of Okanogan - Roadside Safety

US 2 - E End Odabashian Bridge - Loop Trail Connection

SR 26 - Roadside Safety Improvement

US 2 - South of Orondo - Passing Lane

US2/97 - Lincoln Rock State Park to Orondo - Paving

US 2 - West of Leavenworth - Paver

SR 26 - Intersection and Illumination Improvements

US 97/Intersection Safety Improvements

2008 Completed Projects:

SR 153 - Methow River Bridges - Deck and Rail Repair

US 2/97 - Goodwin Rd. Cashmere Area Signal

I-90 - West of George - Paving

SR 17 Moses Lake North Paving

US 2 - 7 Miles E of Coles Corner - Unstable Slope

SR 26/Othello Vicinity-Illumination



Your Selections

These terms define your current search. Click the
×
to remove a term.

Funding: Federal Stimulus
×
Route: SR 20
×

0 Matching Result


Narrow It Down...