WSDOT Projects

text size: T T T

US 97 South Omak Bridge Deck Repair Photos

A new smooth bridge deck.
The new bridge deck as construction was completed.   
Caption below photo
An example of the deterioration of the current bridge deck.    
This is the temporary traffic signal controlling traffic over the bridge, during construction.
During construction, these temporary traffic signals alternate vehicles through the one lane that's open.  Motorists need to pull all the way up to the stop bar to trigger the signal.