US 2/97 Cashmere East Paving Photos



Hay Canyon right turn lane will be extended, increasing storage capacity and reducing the potential for rear end collisions.       

Intersection of Cotlets Way/Eels Rd.  The lanes at this intersection are being severely rutted.  The project will grind out the existing asphalt and replace it with a stiffer asphalt.   

An example of the typical pavement distress on US 2/97 in this section.  Lanes will be ground down and filled prior to receiving the overlay.   

Paving in May

Mainline paving got underway in earnest during hot weather in mid May.