This project paves SR 285, North Wenatchee Avenue from MP 3.23 to 5.04, (Maple Street to Jct with US 2 at Sunnyslope) and US 2/97 from MP 119.16 to 120.77 (The west end of the Odabashian Bridge to the Jct with SR 28-Sunset Highway).