
An example of deteriorated bridge rail.

This bridge rail is actually broken.

An example of sidewalk damage that will be repaired.

Rails will be upgraded on this steel bridge at milepost 4.

The Methow River Bridge at milepost 10.

The Methow River Bridge at milepost 14.

The Methow River Bridge at milepost 15.

The temporary signal in operation at Bridge #10 on April 30th, 2008.

Temporary barrier being installed on Bridge #4 on April 30th, 2008