WSDOT Projects

text size: T T T

SR 153 Methow River Bridges - Photos

An example of bridge rail damage.

An example of deteriorated bridge rail.    

This bridge rail is actually broken.

This bridge rail is actually broken.    

An example of sidewalk damage that will be repaired.

An example of sidewalk damage that will be repaired.    

The steel bridge at milepost 4 is scheduled for rail upgrades.

Rails will be upgraded on this steel bridge at milepost 4.    

The Methow River Bridge at milepost 10.

The Methow River Bridge at milepost 10.    

The Methow River Bridge at milepost 14.

The Methow River Bridge at milepost 14.    

The Methow River Bridge at milepost 15.

The Methow River Bridge at milepost 15.   

Temporary Signal at Bridge #10
The temporary signal in operation at Bridge #10 on April 30th, 2008.    

Temporary Barricade on Bridge #4
Temporary barrier being installed on Bridge #4 on April 30th, 2008