WSDOT Projects

text size: T T T

I-90 George East Paving - Photos

This earthen berm in the median at Adams Road will be replaced with a shock absorbing structure that meets current Federal Highway Administration Standards.

This earthen berm at Adams Road was replaced with a shock absorbing structure that meets current Federal Highway Administration standards.   

Since new cable barrier will be installed in the median to prevent head-on collisions, this is one location (MP 155) where a turnaround for emergency vehicles will be constructed.

Since new cable barrier was installed in the median to prevent head-on collisions, this is one location (MP 155) where a turnaround for emergency vehicles was constructed.   

A right turn island will be constructed at the Quincy/George exit where SR 281 and SR 283 intersect at Murphy's Corner.

A right turn island was constructed at the Quincy/George exit where SR 281 and SR 283 intersect at Murphy's Corner.   

The truck exit lane at the eastbound Winchester Safety Rest Area will be widened.

The truck exit lane at the eastbound Winchester Safety Rest Area was widened.   

The westbound Winchester Safety Rest Area truck lane will be widened too.

The westbound Winchester Safety Rest Area truck lane was widened too.