﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:urlManipulator="urn:urlManipulator" xmlns:dateManipulator="urn:dateManipulator">
  <!--This RSS Feed was generated from WSDOT's news web service.  The service may be found here:
http://www.wsdot.wa.gov/public/webservices/newswebservice.asmx

Parameters may be used in the QueryString to narrow the items returned by this RSS feed.

The "count" parameter may be used to limit the number of items returned to that number.

The "office", "area" and "category" parameters may be use to narrow the items returned to
items regarding that office, area or category.

Offices includes Aviation, Eastern, Headquarters, Local Programs, North Central, Northwest,
Olympic, PTR, South Central, and Southwest.

Areas include King, Snohomish, Snoqualmie, Baker, Grays Harbor, Kitsap,
North Olympic Penisula, South Puget Sound, Columbia River Gorge, Lewis, Southwest Coast,
Vancouver, Columbia Basin, Okanogan, Wenatchee, Yakima, Tri-Cities, Colville, Pullman, Spokane,
and Walla Walla.

Categories include Travel Info,  Projects and Issues, and Public Involvement.

Examples:
default.xml?area=South+Puget+Sound
default.xml?area=Spokane&amp;count=5
default.xml?office=Northwest&amp;category=Travel+Info-->
  <channel>
    <title>WSDOT - North Central News</title>
    <link>http://www.wsdot.wa.gov/Regions/NorthCentral/news/</link>
    <copyright>
          Copyright WSDOT 2008. All rights reserved.
        </copyright>
    <description></description>
    <managingEditor>
          bertraj@wsdot.wa.gov (Jeremy Bertrand)
        </managingEditor>
    <generator>
          Washington State Department of Transportation
        </generator>
    <lastBuildDate>Sun, 08 Nov 2009 19:27:48 GMT</lastBuildDate>
    <ttl>
          15
        </ttl>
    <image>
      <title>WSDOT - North Central News</title>
      <url>http://www.wsdot.wa.gov/Public/images/nav/wsdot2g4.gif</url>
      <link>http://www.wsdot.wa.gov/Regions/NorthCentral/news/</link>
    </image>
    <item>
      <title>WSDOT latest cable median barrier performance report now online</title>
      <pubDate>Wed, 04 Nov 2009 06:06:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/11/2009cablebarrierreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/11/2009cablebarrierreport.htm</guid>
      <description>WSDOT's latest cable median barrier performance report now online</description>
    </item>
    <item>
      <title>WSDOT seeks bids for second construction contract of I-90 Snoqualmie Pass East Project</title>
      <pubDate>Tue, 03 Nov 2009 03:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/11/02_WSDOTseeksbidsforI90IProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/11/02_WSDOTseeksbidsforI90IProject.htm</guid>
      <description>WSDOT is gearing up to tackle the second construction contract of an interstate improvement project on I-90 east of Snoqualmie Pass, and is requesting bids from contractors to re-construct the corridor.</description>
    </item>
    <item>
      <title>WSDOT wraps up busy I-90 Snoqualmie Pass construction season</title>
      <pubDate>Fri, 30 Oct 2009 01:51:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/WSDOTwrapsupbusyI-90constructionseason.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/WSDOTwrapsupbusyI-90constructionseason.htm</guid>
      <description>Motorists driving on I-90 east of Snoqualmie Pass will experience a smoother, safer ride as WSDOT and contractor crews wrap up construction on the first phase of the Lake Easton to Bullfrog project this week. The $18.4 million concrete rehabilitation project is one of five American Recovery and Reinvestment Act (ARRA)-funded projects on I-90 this year.</description>
    </item>
    <item>
      <title>WSDOT holds Contractor Meet and Greet event Oct. 30 in Seattle</title>
      <pubDate>Wed, 28 Oct 2009 03:48:16 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/27_2009meetandgreet.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/27_2009meetandgreet.htm</guid>
      <description>WSDOT holds Contractor Meet and Greet event Oct. 30 in Seattle</description>
    </item>
    <item>
      <title>Winter days and darker evenings mean a greater risk to pedestrians and bicyclists</title>
      <pubDate>Tue, 27 Oct 2009 23:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/27_bikeandpedestriansafety.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/27_bikeandpedestriansafety.htm</guid>
      <description>Winter days and darker evenings mean a greater risk to pedestrians and bicyclists</description>
    </item>
    <item>
      <title>Record-setting heat just a memory – fall and winter have arrived</title>
      <pubDate>Fri, 23 Oct 2009 02:45:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/22_winter_driving_chains.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/22_winter_driving_chains.htm</guid>
      <description>When the 80, 90 and 100-degree days are replaced with wind and record-setting rain, it’s clear fall has arrived and winter is just around the corner.</description>
    </item>
    <item>
      <title>US 97 Oroville border crossing traffic cameras come on line</title>
      <pubDate>Thu, 22 Oct 2009 06:40:53 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/21US97BorderCameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/21US97BorderCameras.htm</guid>
      <description>Four new traffic cameras are now available to see traffic conditions for those heading to Canada through the US 97 Oroville border crossing.</description>
    </item>
    <item>
      <title>SR 17, SR 282 stimulus project ribbon cutting set for October 22 near Moses Lake</title>
      <pubDate>Wed, 21 Oct 2009 05:11:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/20SR17_282RibbonCut.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/20SR17_282RibbonCut.htm</guid>
      <description>A ribbon cutting ceremony marks completion of a 13 mile paving and passing lane project between Moses Lake and Ephrata.</description>
    </item>
    <item>
      <title>WSDOT lifts ‘residents only’ restrictions on emergency detour for landslide closure on SR 410</title>
      <pubDate>Wed, 21 Oct 2009 02:32:56 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/20_SR410update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/20_SR410update.htm</guid>
      <description>WSDOT and contractor crews today opened the emergency route around the landslide closure on SR 410 to all drivers. Previously only local residents with identification could use the emergency route on Nile Loop Road.</description>
    </item>
    <item>
      <title>WSDOT moves closure points on SR 410 and establishes telephone hotline for up-to-date information</title>
      <pubDate>Wed, 14 Oct 2009 05:15:08 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/410telephonehotlineandclosureinfo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/410telephonehotlineandclosureinfo.htm</guid>
      <description>Hunters and other outdoor enthusiasts will be happy to know WSDOT has shortened the SR 410 closure from 47 miles to four miles after a massive landslide on October 11, 2009. Currently, SR 410 is closed from milepost 104, the west intersection of the Nile Loop Road, and at milepost 108, the east intersection of the Nile Loop Road.</description>
    </item>
    <item>
      <title>Gov. Gregoire proclaims emergency in Yakima County due to State Route 410 damage</title>
      <pubDate>Wed, 14 Oct 2009 04:22:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/13_SR410Proclamation.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/13_SR410Proclamation.htm</guid>
      <description>Gov. Chris Gregoire today proclaimed an emergency in Yakima County because of damage to State Route 410 west of Naches.</description>
    </item>
    <item>
      <title>WSDOT crews working on safe, temporary route on SR 410 for locals</title>
      <pubDate>Tue, 13 Oct 2009 06:24:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/12_SR410_eve_update.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/12_SR410_eve_update.htm</guid>
      <description>WSDOT crews are working to re-establish a temporary route around the damaged section of SR 410 west of Naches, with the goal of safe access to Yakima for the 600 homes and businesses along SR 410.</description>
    </item>
    <item>
      <title>Landslide closes section of SR 410 Chinook Pass</title>
      <pubDate>Mon, 12 Oct 2009 06:19:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/LandslideclosesSR410Chinook+Pass.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/LandslideclosesSR410Chinook+Pass.htm</guid>
      <description>Landslide closes section of SR 410 Chinook Pass</description>
    </item>
    <item>
      <title>Governor Gregoire joins B.C. Premier Campbell to celebrate Amtrak Cascades second train service to Vancouver, B.C.</title>
      <pubDate>Sat, 10 Oct 2009 03:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/09_AmtrakSecondTrainEvent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/09_AmtrakSecondTrainEvent.htm</guid>
      <description>In an effort to promote cross border travel and a long standing partnership, Washington Gov. Chris Gregoire and British Columbia Premier Gordon Campbell joined together to celebrate the start of the long awaited second Amtrak Cascades train service to Vancouver, B.C.</description>
    </item>
    <item>
      <title>WSDOT reminds candidates to keep right-of-way clear for traffic signs</title>
      <pubDate>Thu, 08 Oct 2009 01:31:20 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/07_no_signs_in_rightofway.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/07_no_signs_in_rightofway.htm</guid>
      <description>The Washington State Department of Transportation reminds candidates and supporters to watch where they post political campaign signs: only traffic control signs are allowed in the right-of-way.</description>
    </item>
    <item>
      <title>US 97 Beebe Bridge opens to unrestricted traffic Friday</title>
      <pubDate>Wed, 07 Oct 2009 05:15:45 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/06US97BeebeBridgeReopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/06US97BeebeBridgeReopens.htm</guid>
      <description>Repair work will be complete and the US 97 Beebe Bridge at Chelan Falls will reopen to all traffic Friday afternoon, Oct. 9.</description>
    </item>
    <item>
      <title>Washington applies for more than $1.3 billion in second round of ARRA High Speed Intercity Passenger Rail grants</title>
      <pubDate>Tue, 06 Oct 2009 04:05:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/10/05_ARRAPassengerRailTrack2.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/10/05_ARRAPassengerRailTrack2.htm</guid>
      <description>Washington applies for more than $1.3 billion in second round of ARRA High Speed Intercity Passenger Rail grants</description>
    </item>
    <item>
      <title>Number of completed Recovery Act highway projects on the rise</title>
      <pubDate>Thu, 01 Oct 2009 05:07:54 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/30_ARRAMonthlyWrapUp.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/30_ARRAMonthlyWrapUp.htm</guid>
      <description>As the summer construction season winds down, the number of completed Recovery Act projects is beginning to climb. In September WSDOT and local governments across Washington completed an additional 30 Recovery Act highway projects, bringing the reported number of completed projects to 38.</description>
    </item>
    <item>
      <title>WSDOT upgrades cameras on I-90 Snoqualmie Pass for nighttime viewing</title>
      <pubDate>Tue, 29 Sep 2009 22:40:29 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/snoqualmiepasscameras.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/snoqualmiepasscameras.htm</guid>
      <description>The Washington State Department of Transportation has expanded its ability to monitor roadway conditions and help the public plan their trips on I-90 across Snoqualmie Pass during nighttime hours.</description>
    </item>
    <item>
      <title>Highway fatalities lowest since 1955</title>
      <pubDate>Thu, 24 Sep 2009 03:05:07 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/23_TrafficFatalities.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/23_TrafficFatalities.htm</guid>
      <description>Traffic fatalities in Washington have hit their lowest level since 1955, according to new data from the Washington Department of Transportation and the Washington Traffic Safety Commission.</description>
    </item>
    <item>
      <title>SR 285 Sen. Geo. Sellar Bridge to open for pedestrians as Wenatchee’s pipeline bridge closes</title>
      <pubDate>Tue, 22 Sep 2009 06:48:51 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/21SR285SellarBridgePedXing.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/21SR285SellarBridgePedXing.htm</guid>
      <description>The Senator George Sellar Bridge in South Wenatchee will open for pedestrians on Sept. 28, as Wenatchee’s pipeline bridge closes to pedestrians</description>
    </item>
    <item>
      <title>WSDOT closer to a reopening date for the US 97 Beebe Bridge</title>
      <pubDate>Tue, 22 Sep 2009 06:45:28 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/21US97BeebeBridgeTarget.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/21US97BeebeBridgeTarget.htm</guid>
      <description>WSDOT's target for reopening the US 97 Bridge at Chelan Falls to limited traffic is Monday, Sept. 28</description>
    </item>
    <item>
      <title>Washington’s annual survey of bicyclists and pedestrians starts next week, Sept. 29</title>
      <pubDate>Mon, 21 Sep 2009 23:34:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/2009BikePedCount.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/2009BikePedCount.htm</guid>
      <description>Washington’s annual survey of bicyclists and pedestrians starts next week, Sept. 29</description>
    </item>
    <item>
      <title>Local transportation projects recognized by FHWA and WSDOT as 2009 “Award of Excellence” winners</title>
      <pubDate>Mon, 21 Sep 2009 22:00:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/21_2009AwardsofExcellence.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/21_2009AwardsofExcellence.htm</guid>
      <description>Local transportation projects recognized by FHWA and WSDOT as 2009 “Award of Excellence” winners</description>
    </item>
    <item>
      <title>WSDOT’s quarterly performance report finds progress on highway safety</title>
      <pubDate>Sat, 19 Sep 2009 02:48:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/18_GrayNotebookUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/18_GrayNotebookUpdate.htm</guid>
      <description>An analysis of highways before and after the installation of centerline rumble strips shows a 57 percent reduction in serious injury and fatal crossover collisions.</description>
    </item>
    <item>
      <title>Third project on US 12 near White Pass begins Sept. 21</title>
      <pubDate>Fri, 18 Sep 2009 04:19:40 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/17_ThirdUS12ProjectBegins.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/17_ThirdUS12ProjectBegins.htm</guid>
      <description>WHITE PASS – Drivers can expect delays on US 12 near White Pass as the Washington State Department of Transportation (WSDOT) begins construction on the last of three projects on US 12 between the Cortwright Creek Bridge in Lewis County and the Lewis/Yakima county line.</description>
    </item>
    <item>
      <title>Washington seeks Recovery Act TIGER grants for three high priority projects</title>
      <pubDate>Wed, 16 Sep 2009 05:16:22 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/15_TigerGrants.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/15_TigerGrants.htm</guid>
      <description>The Washington State Department of Transportation submitted applications for three high priority projects in King County, Vancouver, and Spokane to compete for the $1.5 billion available in TIGER Discretionary Grants, part of the federal American Recovery and Reinvestment Act (ARRA).</description>
    </item>
    <item>
      <title>WSDOT asks drivers to plan ahead and expect long delays on I-90 east of Snoqualmie Pass</title>
      <pubDate>Wed, 16 Sep 2009 04:37:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/15_I90BullfrogConcreteProject.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/15_I90BullfrogConcreteProject.htm</guid>
      <description>From now until November, motorists traveling over I-90 east of Snoqualmie Pass should prepare for delays and traffic backups that could add up to one additional hour of travel time to their trip.</description>
    </item>
    <item>
      <title>US 97 Beebe Bridge at Chelan Falls Pedestrian Access Modified</title>
      <pubDate>Fri, 11 Sep 2009 06:22:37 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/10US97BeebePedModified.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/10US97BeebePedModified.htm</guid>
      <description>Pedestrian access across the Beebe Bridge at Chelan Falls continues with some transit connection changes while the bridge remains closed to motor vehicle traffic.</description>
    </item>
    <item>
      <title>Scenic and Recreational Highways Plan meeting to be held in Wenatchee</title>
      <pubDate>Fri, 11 Sep 2009 01:30:21 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/10WenatcheeScenicHwyMtg.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/10WenatcheeScenicHwyMtg.htm</guid>
      <description>There's a Scenic and Recreational Highways Plan meeting in Wenatchee on Sept. 24.</description>
    </item>
    <item>
      <title>Spent Labor Day weekend home? You weren’t the only one</title>
      <pubDate>Wed, 09 Sep 2009 06:21:59 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/8_laborday09_recap.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/8_laborday09_recap.htm</guid>
      <description>It could have been the rain, wind, economy or school calendar. Whatever the reason, the result was clear. There were fewer vehicles on the road in most places for Labor Day 2009.</description>
    </item>
    <item>
      <title>As summer vacation ends, long-term closures on I-90 begin</title>
      <pubDate>Tue, 08 Sep 2009 23:03:04 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/lakeeastontobullfrogclosures.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/lakeeastontobullfrogclosures.htm</guid>
      <description>Just when you thought construction was winding down for the season, crews are getting ready to kick it into high gear on I-90 after Labor Day</description>
    </item>
    <item>
      <title>US 97 Beebe Bridge at Chelan Falls Pedestrian Access Restored</title>
      <pubDate>Mon, 07 Sep 2009 02:22:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/06US97BeebeBridgeUpdate.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/06US97BeebeBridgeUpdate.htm</guid>
      <description>The US 97 Beebe Bridge at Chelan Falls is opening for pedestrians on Tuesday, but remains closed to motor vehicles.</description>
    </item>
    <item>
      <title>Gov. Gregoire highlights transportation workers on Labor Day</title>
      <pubDate>Fri, 04 Sep 2009 23:44:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/4_GregoireLaborDay.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/4_GregoireLaborDay.htm</guid>
      <description>In honor of Labor Day, Gov. Christine Gregoire signed a proclamation encouraging state residents to celebrate Washington transportation workers.</description>
    </item>
    <item>
      <title>US 97 Beebe Bridge at Chelan Falls may be closed for weeks</title>
      <pubDate>Fri, 04 Sep 2009 00:46:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/03US97BeebeBridgeClosure.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/03US97BeebeBridgeClosure.htm</guid>
      <description>The US 97 Beebe Bridge at Chelan Falls remains closed to vehicles and pedestrians until repairs can be made as a result damage from a truck collision on Monday.</description>
    </item>
    <item>
      <title>The travelers’ end of summer assignment: Know before you go this Labor Day Weekend</title>
      <pubDate>Wed, 02 Sep 2009 01:38:39 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/09/1_LaborDay2009travel.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/09/1_LaborDay2009travel.htm</guid>
      <description>WSDOT offers many ways to know before you go this Labor Day weekend.</description>
    </item>
    <item>
      <title>Delivering on the Recovery Act: More highway projects under way, and construction workforce continues to grow</title>
      <pubDate>Tue, 01 Sep 2009 04:57:41 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/31_AugustRecoveryActReport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/31_AugustRecoveryActReport.htm</guid>
      <description>Delivering on the Recovery Act: More highway projects under way, and construction workforce continues to grow

More than 135 highway projects awarded or under way in Washington state.</description>
    </item>
    <item>
      <title>First North Spokane Corridor segment opens to traffic</title>
      <pubDate>Sat, 29 Aug 2009 00:34:15 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/28_us395nscsegmentopens.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/28_us395nscsegmentopens.htm</guid>
      <description>First US 395 North Spokane Corridor segment opens to traffic</description>
    </item>
    <item>
      <title>Washington applies for nearly $435 million in first round of ARRA High Speed Intercity Passenger Rail grants</title>
      <pubDate>Tue, 25 Aug 2009 03:40:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/24_ARRAHighSpeedRailTrack1application.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/24_ARRAHighSpeedRailTrack1application.htm</guid>
      <description>Washington applies for nearly $435 million in first round of ARRA High Speed Intercity Passenger Rail grants</description>
    </item>
    <item>
      <title>Second Amtrak Cascades train to Vancouver, B.C. begins service August 19</title>
      <pubDate>Thu, 13 Aug 2009 01:55:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/08122009_AmtrakCascadessecondtrain.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/08122009_AmtrakCascadessecondtrain.htm</guid>
      <description>Second Amtrak Cascades train to Vancouver, B.C. 
begins service August 19</description>
    </item>
    <item>
      <title>Annual survey needs volunteers to count bicyclists and pedestrians</title>
      <pubDate>Wed, 12 Aug 2009 23:16:05 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/volunteersBike-PedCount.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/volunteersBike-PedCount.htm</guid>
      <description>Annual survey needs volunteers throughout WA to count bicyclists and pedestrians</description>
    </item>
    <item>
      <title>WSDOT kicks off construction of the I-90 Snoqualmie Pass East project to improve safety and reliability of vital cross-state route</title>
      <pubDate>Wed, 12 Aug 2009 05:30:14 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/I90Kickoffevent.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/I90Kickoffevent.htm</guid>
      <description>The Washington State Department of Transportation today began construction on the I-90 Snoqualmie Pass East project (I-90 Project), a project that will build five miles of wider, safer and more reliable highway for east-west travelers.</description>
    </item>
    <item>
      <title>WSDOT adds new tools to deliver real-time traffic information</title>
      <pubDate>Tue, 11 Aug 2009 02:26:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/10_trafficinfo.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/10_trafficinfo.htm</guid>
      <description>OLYMPIA – Now it is even easier to know before you go. The Washington State Department of Transportation has added new tools to deliver real-time traffic and incident information to Northwest motorists.</description>
    </item>
    <item>
      <title>WSDOT wins national recognition for durable, long-lasting pavement</title>
      <pubDate>Fri, 07 Aug 2009 05:06:38 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/06_PavementAward.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/06_PavementAward.htm</guid>
      <description>To the motoring public, smoothness is chief among the factors of what makes a good roadway pavement. To the Washington State Department of Transportation (WSDOT), it is smooth pavement that lasts.</description>
    </item>
    <item>
      <title>WSDOT wraps up US 12, White Pass paver this week</title>
      <pubDate>Tue, 04 Aug 2009 04:31:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/08/US12_WhitePassPaverComplete.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/08/US12_WhitePassPaverComplete.htm</guid>
      <description>WHITE PASS – Drivers on US 12 will enjoy a smoother, safer drive over White Pass as the Washington State Department of Transportation wraps up a paving project on Wednesday, Aug. 5.</description>
    </item>
    <item>
      <title>First North Spokane Corridor segment opens to traffic August 22</title>
      <pubDate>Thu, 30 Jul 2009 00:57:44 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/29_us395nscopening.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/29_us395nscopening.htm</guid>
      <description>First North Spokane Corridor segment opens to traffic August 22</description>
    </item>
    <item>
      <title>Stimulus work on the rise for highway projects</title>
      <pubDate>Wed, 29 Jul 2009 04:15:00 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/28_JulyStimulusreport.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/28_JulyStimulusreport.htm</guid>
      <description>New employment data from state and local highway contractors showed Recovery Act work in Washington state doubled from May to June as more projects get awarded and underway.</description>
    </item>
    <item>
      <title>WSDOT awards contracts for statewide cable barrier and rumble strip projects</title>
      <pubDate>Tue, 28 Jul 2009 01:19:49 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/27_ARRACableRumbleContracts.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/27_ARRACableRumbleContracts.htm</guid>
      <description>WSDOT is moving forward with projects to improve safety on 33 highways across Washington. The 2009 American Recovery and Reinvestment Act (ARRA) provided $12 million in funding for installing centerline rumble strips on 662 miles of state highways and for retrofitting nearly 30 miles of cable median barrier. Together, these projects will help support approximately 120 jobs during construction.</description>
    </item>
    <item>
      <title>Help WSDOT signal crews get bicycles and motorcycles moving</title>
      <pubDate>Fri, 24 Jul 2009 22:50:48 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/24_bike_motorcyle_signals.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/24_bike_motorcyle_signals.htm</guid>
      <description>WSDOT is looking for comments from bicyclists and motorcycle drivers who notice when traffic detection systems at state-operated traffic signals do not “detect” them.</description>
    </item>
    <item>
      <title>Community input shapes Methow Valley State Airport Layout Plan</title>
      <pubDate>Tue, 21 Jul 2009 04:35:12 GMT</pubDate>
      <link>http://www.wsdot.wa.gov/News/2009/07/20MethowValleyAirportLayout.htm</link>
      <guid>http://www.wsdot.wa.gov/News/2009/07/20MethowValleyAirportLayout.htm</guid>
      <description>A preferred development alternative for the future of the Methow Valley Airport is chosen.</description>
    </item>
  </channel>
</rss>