Aug. 15 – Aug. 30, 2018


Aug. 16, 2018 Update

Contact: WSDOT Eastern Region, 509-324-6000

SR 20/Calispel Lake Drainage Culvert Replacement (MP 161.11 to 161.27)
Highway
SR 20 Region: Eastern County: Pend Oreille Location: SR 20 MP 161.11 to 161.27
Description: Culvert Replacement
Work Schedule High Impact SR 20 roadway will be closed 24 hours/day from Monday, Aug. 20 at 5 a.m. thru Sunday Aug. 26. A signed detour will be in place. Contractor has installed PCMS Boards alerting roadway users to upcoming detour on Monday, Aug. 20.
Contact: Mark Allen, Project Engineer, 509-324-6232

I-90/Paha Interchange Survey Work (MP 215)
Highway Region: Eastern County: Adams County Location: I90 MP 215
Description: Surveying
Work Schedule: Beginning at 9:00 am Thursday August 16th, WSDOT Maintenance and Survey Crews will be collecting survey data at both the westbound and eastbound I-90 on ramps at the Paha Packard Interchange, MP 215 in Adams County. Drivers should expect minor delays on I-90, due to single lane traffic control. The on ramps will be temporarily closed while survey data is being collected. The work at each ramp should last approximately 15-20 minutes. Work will begin in the westbound direction followed by the eastbound direction.
Contact: Tom Brasch, Project Engineer, 509-323-8411

SR 21/Curlew to Canada Flood Repair (MP 185 to 190.20)
Highway SR 21 Region: Eastern County: Ferry Location: SR 21 MP 185 to 190.20
Description: Slope and shoulder reconstruction, Asphalt paving, Guardrail replacement. (16 working days)
Work Schedule: Work expected to begin after Labor Day.
Contact: Tom Brasch, Project Engineer, 509-323-8411

SR 31/South of Metaline – Stabilize Slope (MP 11.03 to 11.25)
Highway SR 31 Region: Eastern County: Pend Oreille Location: SR 31 MP 11.03 to 11.25
Description: Construct a soldier pile debris flow deflector wall along the toe-of-slope and remove trees along the crest of the slope. (35 working days)
Project Website: https://wsdot.wa.gov/projects/sr31/metaline/home
Work Schedule: Work expected to begin after Labor Day.
Contact: Tom Brasch, Project Engineer, 509-323-8411

SR 290 Hamilton to Mission (SR 290 MP 0.74 to 3.37)
Highway: I-90/SR 290 Region: Eastern County: Spokane Location: SR 290 MP 0.74 to 3.37
Description: Planing, pavement repair, paving, ADA sidewalk ramp improvements, traffic signal modifications.
Project Website: https://www.wsdot.wa.gov/projects/sr290/hamilton-mission/home
Work Schedule: Daytime work with lane closures.
Contact: Chad Simonson, Project Engineer, 509-324-6252

2nd Ave W Bridge and 3rd Ave Bridge WB On-Ramps (I-90 MP 0.18 – 0.41 and SR 290 EW Ramp MP 0.03 to 0.26 )
Highway:
I-90/SR 290 Region: Eastern County: Spokane Location: I-90 Ramp MP 0.18 to 0.41 and SR 290 EW Ramp MP 0.03 to 0.26
Description: Bridge deck repair and under deck repair on bridges.
Project Website : https://www.wsdot.wa.gov/projects/i90/hamilton-ramp/home
Work Schedule: Daytime with 24 hour ramp closure. Travelers will have several detour options to access westbound I-90 during the closure, though some depend on vehicle height.
Contact: Chad Simonson, Project Engineer, 509-324-6252

I-90/Drain Cleaning (MP 277.50 to 287.92)
Highway: I-90 Region: Eastern County: Spokane Location: MP 277.50 to MP 287.92
Description: Maintenance Crews will be cleaning shoulder drains along Eastbound Interstate 90 from the top of Sunset Hill to Argonne Rd. Roadway users should be alert for lane closures and traffic congestion .
Project Website: N/A
Work Schedule: Work is scheduled for Monday, Aug. 13 to Thursday, Aug. 16, from 9 am to 3 pm.
Contact: Kelly Brauhn, Maintenance Supervisor, 509-993-3266

US 395/Deer Park Corridor Intersection Improvements (MP 178 to MP 181)
Highway: US 395 Region: Eastern County: Spokane Location: MP 178 to MP 181
Description: Construct roundabouts at Short/Main and Monroe/Crawford; removing access to US 395 at Burroughs/Dalton
Project Website : http://www.wsdot.wa.gov/Projects/US395/deerparkroundabouts/default.htm
Work Schedule: HIGH IMPACT: US 395 will be detoured in the vicinity of Deer Park from 7:00pm Friday, August 17th through 5:30am Tuesday, August 21st. Southbound traffic will be directed west at Monroe Rd to South Monroe Rd, then east at Burroughs Rd back to US 395. Northbound traffic will be directed north at Main St, west at Crawford Rd, then back to US 395. Motorists should expect high delays and are encouraged to find alternative routes within this time frame.
Main/Short: The roundabout is fully operational for all four legs of traffic. Remaining work includes permanent illumination, permanent signing, and slope rehabilitation. Flagging traffic control operations may be necessary to direct one-lane, two-way traffic through the roundabout.
Monroe/Crawford: Cleveland Rd is permanently closed at Crawford Rd. US 395 traffic at Monroe/Crawford is routed onto a bypass along the west side of the intersection. US 395 lanes are striped at 10 feet with 4 foot shoulders and the speed is reduced to 25 mph advisory speeds. Access to and from US 395 on Monroe Rd and Crawford Rd is closed. The roundabout will be operational the morning of August 21st and all legs will be open to traffic. Work includes concrete curbs and the truck apron for the roundabout, asphalt paving, and installation of illumination.
Contact: Tom Brasch, Project Engineer, 509-323-8411

Regionwide Curve Warning
Highway: Multiple Region: Eastern County: Multiple Location: Multiple
Description: Replace and add curve warning signs
Project Website: N/A
Work Schedule: Work began on July 26th. Roadway users should be alert for pilot cars and one-lane, two-way traffic control with flaggers depending on site conditions.
Contact: Mark Allen , Project Engineer, 509-324-6232

SR 902/Medical Lake to I-90 Paving (MP 5.55 to 11.95)
Highway: SR 902 Region: Eastern County: Spokane Location: MP 5.55 to 11.95
Description: Paving and rumble strips on SR 902, rumble strips on US 2 and US 395
Project Website: https://www.wsdot.wa.gov/projects/sr902/medical-lake-i90/home
Work Schedule: Permanent paving marking work underway the week of August 13th with nighttime lane closures.
Contact: Mark Allen , Project Engineer, 509-324-6232

US 2/Division Street-Browne Street-Ruby Street/I-90 to Euclid Ave. Paving (MP 286-289)
Highway: US 2 Region: Eastern County: Spokane Location: MP 286-289
Description: Daytime lane closure beginning at 5am on Friday 8/17 for traffic loops repair and utility adjustments. Evening lane closure for deck grinding.
Website: http://www.wsdot.wa.gov/projects/us2/i90-euclid/home
Work Schedule: Daytime lane closures between 9 am and 3 pm
Contact: Chad Simonson , Project Engineer, 509-324-6252

US 2/Deer Road to Colbert Road – Paving and turn lane improvements (MP 297-300)
Highway: US 2 Region: Eastern County: Spokane Location: MP 297-300
Description: Asphalt paving and turn lane improvements.
Website: http://www.wsdot.wa.gov/Projects/US2/deerrdtodaymtspokane
Work Schedule: Mon – Fri 7:00am to 3:30pm. Potential traffic control on US2 during off peak hours.
Contact: Mark Allen , Project Engineer, 509-324-6232

I-90/Hamilton Street East Bound Off Ramp Exit 282 (MP 282)
Highway:
I-90 Region: Eastern County: Spokane Location: (282)
Description: Maintenance Crews will be performing bridge deck repairs on the East Bound Off-Ramp.
Project Website: N/A
Work Schedule: Work is scheduled for Monday, August 20 to Thursday, August 23, from 9:00am to 3:00pm. Roadway users should expect delays and be alert for lane restrictions.
Contact: Kelly Brauhn, Maintenance Supervisor, 509-324-6590

US-395/Milling and Paving (MP 230.90 to MP 241.49)
Highway:
US-395 Region: Eastern County: Stevens Location: (Colville to Columbia River Bridge)
Description: Maintenance Crews will be milling and paving at various locations along the route.
Project Website: N/A
Work Schedule: The work is scheduled for Monday, August 20 to Tuesday, August 21, from 7:00am to 4:30pm. Roadway users should expect delays and lane restrictions, and be alert for flaggers and a pilot car directing single-lane, alternating traffic.
Contact: Bob Dehle, Maintenance Supervisor, 509-324-6590

US-395/Milling and Paving (MP 202.79 to MP 207.82)
Highway:
US-395 Region: Eastern County: Stevens Location: (Hafer Rd to Chewelah)
Description: Maintenance Crews will be milling and paving at various locations along the route.
Project Website: N/A
Work Schedule: Work is scheduled for Wednesday, August 22 to Thursday, August 23, from 7:00am to 4:30pm. Roadway users should expect delays, and be alert for flaggers and a pilot car directing single-lane, alternating traffic.
Contact: Bob Dehle, Maintenance Supervisor, 509-324-6590

SR 27/Grace Avenue Intersection Safety Project
Highway:
SR 27 Region: Eastern County: Spokane Location: Intersection of SR 27 and Grace
Description: Intersection Reconstruction
Website: none
Work Schedule: July 2nd to August 20th all days and hours SR 27 reduced to one lanes each direction. Flagger controlled ingress and egress from Grace Avenue, east of Pines Rd during active work hours. Sidewalk closures with pedestrian detour routes. Access to residences will remain available.
Contact: Craig Aldworth City of Spokane Valley, 509-720-5001

SR 21/Lind to I-90 Chip Seal (MP 24.77 – 37.71)
Highway:
SR 21 Region: Eastern County: Adams Location: MP 24.77 – 37.71
Description: Chip Seal
Work Schedule: No work.
Website: http://www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home
Contact: Chad Simonson, Project Engineer, 509-324-6252

SR 21/Canniwai Creek to US 2 Chip Seal (MP 74.00 – 91.78)
Highway:
SR 21 Region: Eastern County: Adams Location: MP 74.00 - 91.78
Description: Chip Seal
Work Schedule: No Work.
Website: http://www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home
Contact: Chad Simonson, Project Engineer, 509-324-6252

SR 21/Keller Ferry to Republic Chip Seal (MP 106.66 – 160.10)
Highway:
SR 21 Region: Eastern County: Ferry Location: MP 106.66 – 160.10
Description: Chip Seal and Fog Seal
Work Schedule: Drivers should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway.
Website: http://www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home
Contact: Chad Simonson, Project Engineer, 509-324-6252

SR 25/US 395 to Bossburg Chip Seal (MP 81.07 – 94.34)
Highway:
SR 25 Region: Eastern County: Stevens Location: MP 81.07 – 94.34
Description: Chip Seal, Fog Seal
Work Schedule: Drivers should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway.
Website: http://www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home
Contact: Chad Simonson, Project Engineer, 509-324-6252

SR 25/Bossburg to Canada Chip Seal (MP 94.34 – 121.23)
Highway :
SR 25 Region : Eastern County : Stevens Location : MP 81.07 – 94.34
Description : Chip Seal, Fog Seal
Work Schedule : Drivers should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway.
Website: http://www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home
Contact: Chad Simonson , Project Engineer, 509-324-6252

SR 261/Sutton to I-90 Chip Seal (MP 44.85 – 62.67)
Highway:
SR 261 Region: Eastern County: Adams Location: MP 44.85 – 62.67
Description: Chip Seal
Work Schedule: No Work
Website: http://www.wsdot.wa.gov/Projects/chipseal/eastern-2018/home
Contact: Chad Simonson, Project Engineer, 509-324-6252

SR 41/BNSF-POVRR Railroad Bridge (MP 38)
Highway:
SR 41 Region: Eastern County: Pend Oreille Location: MP 38
Description: Replace the bridge over the railroad tracks just south of Newport, Washington, and Oldtown, Idaho. This bridge is jointly owned by the Idaho Transportation Department and WSDOT. This is an Idaho Transportation Department project.
Website: http://www.itd.idaho.gov/d1/
Work Schedule: The bridge is reduced to one lane with temporary signalization. The nearby intersection of Fourth Street will be closed with a detour on Marion Street posted.
Contact: Megan Sausser , Idaho Transportation Department Communications, (208) 772-1295

North Spokane Corridor-US 395/Freya Structures (MP 162)
Highway:
US 395 Region: Eastern County: Spokane Location: NSC MP 162
Description: Construct two mainline freeway bridges over Freya Street
Project Website: http://www.wsdot.wa.gov/Projects/US395/nspokanecorridorfreya/
Work Schedule: Mon – Friday 6:00am to 4:30pm. Roadway users should be alert for occasional traffic control at the Freya roundabouts.
Contact: Mark Allen, Project Engineer, 509-324-6232

NSC-US 395/Columbia to Freya (MP 161.1 to 162.3)
Highway: US 395 Region: Eastern County: Spokane Location: MP 161.1 to 162.3
Description: Construct mainline NSC from Freya to Columbia
Project Website: https://www.wsdot.wa.gov/Projects/US395/columbiatofreya/default.htm
Work Schedule: Weekday 6:00 am – 6:00 pm. Work is off the roadway.
Contact: Mark Allen , Project Engineer, 509-324-6232

US 195 Colfax to Spangle Add Passing Lanes – Phase 2
Highway:
US 195 Region: Eastern County: Spokane/Whitman Location: MP 49.94 – 72.70
Description: Earthwork and paving of four added passing lanes.
Project Website : http://www.wsdot.wa.gov/Projects/US195/colfaxtospanglepassinglanes/
Work Schedule: Potential shoulder closures may be in place during work hours. No lane closures allowed Wednesday August 15th thru Sunday August 19th to facilitate WSU student move in.
Contact: Mark Allen, Project Engineer, 509-324-6232