I-405, I-5 to SR 169 Stage 2 - Widening and SR 515 Interchange Geotechnical Baseline ReportCover Sheet and LetterTable of Contents Chapter 1: Introduction Chapter 2: Geology and Seismicity Chapter 3: Subsurface Conditions Chapter 4: Existing Structures (AS-BUILT CONDITIONS) Along Project Corridor Chapter 5: Preliminary Geotechnical Recommendations and Considerations Chapter 6 and 7: Suplimental Subsurface Explorations/Limitations Chapter 8: ReferencesFigures Figure 1 Figure 2 Figure 3A Figure 3B Figure 3C Figure 3D Figure 4 Figure 5 Figure 6 Figure 7A Figure 7B Figure 8A Figure 8B Figure 8C Figure 8D Figure 8E Figure 8F Figure 8G Figure 8H Figure 8I Figure 8J Figure 8KAppendices Appendix A (pg 1-24) A (pg 25-60) A (pg 60-83) Appendix B (pg 1-26) B (pg 27-52) Appendix C Appendix D (pg 1-15) D (pg 16-35) Appendix E