WSDOT Projects

text size: T T T

I-405 Renton Stage 2 Widening - Geotechnical Baseline Report

I-405, I-5 to SR 169 Stage 2 - Widening and SR 515 Interchange Geotechnical Baseline Report

Cover Sheet and Letter
Table of Contents
    Chapter 1: Introduction
    Chapter 2: Geology and Seismicity
    Chapter 3: Subsurface Conditions
    Chapter 4: Existing Structures (AS-BUILT CONDITIONS) Along 
Project Corridor

    Chapter 5: Preliminary Geotechnical Recommendations 
and Considerations
    Chapter 6 and 7: Suplimental Subsurface Explorations/Limitations
    Chapter 8: References

Figures
    Figure 1
    Figure 2
    Figure 3A
        Figure 3B
        Figure 3C
        Figure 3D
    Figure 4
    Figure 5
    Figure 6
    Figure 7A
        Figure 7B
    Figure 8A
        Figure 8B
        Figure 8C
        Figure 8D
        Figure 8E
        Figure 8F
        Figure 8G
        Figure 8H
        Figure 8I
        Figure 8J
        Figure 8K

Appendices
    Appendix A (pg 1-24)
                 A (pg 25-60)
                 A (pg 60-83)
    Appendix B (pg 1-26)
                 B (pg 27-52)
    Appendix C
    Appendix D (pg 1-15)
                 D (pg 16-35)
    Appendix E