Northbound I-405 Lowering - June 2006

Length of section to be lowered 920 feet
Width of section to be lowered 55 feet
Area of section to be lowered 50,600 square feet
Depth of lowering Up to 3 feet
Thickness of existing pavement that we'll remove 11 inches
Thickness of material under the pavement that we'll remove Varies from 2 to 23 inches
Volume of existing pavement and other material that we'll remove 6,235 tons or 390 truckloads
Depth of material and pavement that we'll replace 12.6 inches
Volume of pavement and other material that we'll replace 3,480 tons or 217 truckloads
Length of lane and edge lines to paint 4,600 feet
Number of construction contractors working on the freeway lowering 6 (1 prime + 5 subs)
Number of workers working on the freeway lowering at any one time About 20

Traffic Data

Average number of vehicles using northbound I-405 at NE 124th Street
Per day on a typical weekday 150,000
Per hour on a typical Saturday midday 4,200
Per hour on a typical Monday evening rush hour 5,500
Maximum number of vehicles per hour on the bypass during construction 3,000

Average number of vehicles using NE 124th Street over I-405
Per day on a weekday 43,000
Per day on a Saturday 37,000
Per day on a Sunday 32,000
Per hour on a typical Monday evening rush hour 3,100
Per hour on a typical Saturday midday 2,900
Per hour on a typical Sunday midday 2,600

Lane closures

Total number of northbound I-405 lanes at NE 124th St. 4 (3 general-purpose and 1 HOV)
Northbound lanes closed during construction 4
Northbound lanes on temporary bypass 2
Width of lanes on bypass 11 feet (plus 1-foot shoulders)
Number of hours northbound mainline is scheduled to be closed 79
Total number of southbound I-405 lanes through Kirkland 4 (3 general-purpose and 1 HOV)
Southbound I-405 lanes closed during construction 0 to 1

Ramp closures

Number of ramps at NE 124th interchange 8
Ramps at NE 124th closed during construction 1

Information and assistance for I-405 users

Number of members on our e-mail update lists to whom we're sending information on this closure About 7,000
Number of portable electronic freeway signs we’re using to provide driver information 8
Number of King County Metro bus routes affected by the closure 8
Number of Sound Transit bus routes affected by the closure 3
Number of Community Transit bus routes affected by the closure 2
Number of extra incident response patrols we’re adding in the project area during this construction work 2
Hours of incident response coverage per day during this construction work 16