Crews excavate and pave the right shoulder of southbound SR 167.

Bulldozer used in paving the shoulder

Crews excavate and construct a temporary dentention pond located on
the west side of the highway, between SR 167 and East Vally Road. The
pond is used for run-off from SR 167.